Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC 3RD FLOOR VVIP RESIDENCY MAHINDER VIHAR CHAKRATA RD NEAR RAMADA HOTEL DEHRADUN UTTARAKHAND 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L1 | Accepted-AOC Being 1st lowest | |
| 2 | L2₹33.4 L+₹23,877.50 (0.72%)Rejected-Finance | L2 | Rejected-Finance Being 2nd lowest | |
| 3 | L3₹34.3 L+₹1.2 L (3.54%)Rejected-Finance | L3 | Rejected-Finance Being 3rd lowest | |
| 4 | L4₹37.4 L+₹4.3 L (12.9%)Rejected-Finance 110059 NEW DELHI NATIONAL CAPITAL TERRITORY OF DELHI 110059 | WEST DELHI | DELHI | 110059 | L4 | Rejected-Finance Being 4th lowest |
| Sl No | Description | Qty | Unit | DHEER ENGINEERING L1 | V r traders L4 | venus engineers L3 | DOON DIESEL SALES AND SERVICE L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft/loose soil not exceeding 1.5 mtr wide and not exc.1.5 mtr in depth for taking/laying of CI/GI pipe and getting out including forming bottom surface etc in loose/soft soil complete all as specified and directed. | 310 | Cum | 210 ₹65,100 | 199 ₹61,690 | 150 ₹46,500 | 140 ₹43,400 Lowest |
| 2.00 | Returning filling in same earth in trenches including spreading leveling watering and well ramming in layers not. Exc. 25cm thick any type of soil after the pipe laid all as directed. | 263.5 | Cum | 71 ₹18,708.5 | 49 ₹12,911.5 | 40 ₹10,540 | 18 ₹4,743 Lowest |
| 3.00 | Removing of excavated soil n. exc. 50m and depositing where directed at a level n.exc. 1.5 m above the starting points in soil complete all as specified and directed. | 46.5 | Cum | 71 ₹3,301.5 | 49 ₹2,278.5 | 40 ₹1,860 | 18 ₹837 Lowest |
| 4.00 | Taking out 15 mm bore steel water tubing including fittings complete all as specified and directed by Engr-in-charge.
(Note- Excavation & earth work shall be measured and paid separately) | 274 | RM | 3 ₹822 Lowest | 19 ₹5,206 | 12 ₹3,288 | 15 ₹4,110 |
| 5.00 | All as per item no. 4 but for 20 mm bore. | 524 | RM | 4 ₹2,096 Lowest | 19 ₹9,956 | 15 ₹7,860 | 20 ₹10,480 |
| 6.00 | All as per item no. 4 but for 25 mm bore. | 318 | RM | 4 ₹1,272 Lowest | 19 ₹6,042 | 16 ₹5,088 | 25 ₹7,950 |
| 7.00 | All as per item no. 4 but for 40 mm bore. | 106 | RM | 5 ₹530 Lowest | 29 ₹3,074 | 18 ₹1,908 | 30 ₹3,180 |
| 8.00 | All as per item no. 4 but for 50 mm bore. | 418 | RM | 5 ₹2,090 Lowest | 29 ₹12,122 | 20 ₹8,360 | 35 ₹14,630 |
| 9.00 | All as per item no. 4 but for 80 mm bore. | 92 | RM | 6 ₹552 Lowest | 49 ₹4,508 | 25 ₹2,300 | 40 ₹3,680 |
| 10.00 | All as per item no. 4 but for 100 mm bore. | 87 | RM | 8 ₹696 Lowest | 59 ₹5,133 | 30 ₹2,610 | 50 ₹4,350 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Apr 2026, 6:00 pmClosed
GE Clement Town
GE Clement Town MES Dehradun
REPAIR / REPLACEMENT OF OLD CORRODED GI/CI/DI/MS PIPE LINE, SERVICE CONNECTION OF WATER SUPPLY, DIVERSION OF DISTRIBUTION PIPE LINE FROM SEWAGE PIPE LINE INCL PIT CHAMBER AND WASHOUT POINT AT VARIOUS LOCATION UNDER GE CLEMENT TOWN
2026_MES_757323_1
GE/CLT/ Of 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE Clement Town
Class D Cat a(ii)
7 documents required · 7 mandatory
₹500
Yes
GE Clement Town
₹80,000
Yes
23 May 2026
23 Mar 2026
20 Apr 2026
23 Mar 2026
13 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in trenches in soft/loose soil not exceeding 1.5 mtr wide and not exc.1.5 mtr in depth for taking/laying of CI/GI pipe and getting out including forming bottom surface etc in loose/soft soil complete all as specified and directed. | - | Cum | - | - |
| - | Returning filling in same earth in trenches including spreading leveling watering and well ramming in layers not. Exc. 25cm thick any type of soil after the pipe laid all as directed. | - | Cum | - | - |
| - | Removing of excavated soil n. exc. 50m and depositing where directed at a level n.exc. 1.5 m above the starting points in soil complete all as specified and directed. | - | Cum | - | - |
| - | Taking out 15 mm bore steel water tubing including fittings complete all as specified and directed by Engr-in-charge.
(Note- Excavation & earth work shall be measured and paid separately) | - | RM | - | - |
| - | All as per item no. 4 but for 20 mm bore. | - | RM | - | - |
| - | All as per item no. 4 but for 25 mm bore. | - | RM | - | - |
| - | All as per item no. 4 but for 40 mm bore. | - | RM | - | - |
| - | All as per item no. 4 but for 50 mm bore. | - | RM | - | - |
| - | All as per item no. 4 but for 80 mm bore. | - | RM | - | - |
| - | All as per item no. 4 but for 100 mm bore. | - | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_848300.xls
BOQ • 0.56 MB
Tenderdocs8342.pdf
Tender Documents • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .