Loading…
Loading…
Tender Value
₹9.4 L
EMD Value
₹9,400
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer, K. B. C. Division No.1/1,Radhanpur -385340
Fabrication and erection of Height Gauge Barrier at major road crossing on SR side of Radhanpur Branch Canal (slice-1) Ch 0.00 km to 11.469 km
301594
02 of 2026-2027
Open
Civil Works - Canal
Works
Patan
4 documents required · 4 mandatory
₹1,062
Executive Engineer, K. B. C. Division No.1/1,Radhanpur
₹9,400
5 May 2026
5 May 2026
5 May 2026
25 May 2026
5 May 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to figures
book of specifications)
Excavation for foundation in all
sorts of soil including yellow
sandy gravelly soils ,soft & hard
murrum etc. in dry condition
including depositing the
excavated stuff in uniform layers
in banks or as and where directed
etc. complete for lead up to 500m
and all lift. (BY MACHINERY)
Excluding dewatering.
Providing & Laying in position
"NOMINAL MIX" cement concrete
using cement, sand and crushed
aggregate by mass and machine
mix for C.C./R.C.C work incl.
necessary formworks centering,
2 scaffolding, compaction by 5.95 Cum 3935
vibrator, curing as directed with
all lead & lift etc complete
Without Dewatering and
excluding cost of steel
reinforcement. (A) For
Foundation concrete / General
purpose (c) C. C. Nominal Mix,
M-15 and MSA-20 mm
Providing & Laying in position
"DESIGN MIX" cement concrete
using cement sand and crushed
aggregate for C.C./ R.C.C work by
"FLORI" including necessary
formwork, centering, scaffolding,
3 compaction by vibrator, curing as 17.90 Cum 4651
directed with all lead & lift etc
complete without dewatering
and excluding the cost of steel
reinforcement.e) Concrete grade
M-25 and MSA-20 mm
Providing and laying HYSD/TMT
Fe-415,500 D steel bar
reinforcement forR.C.C.works and
anchor bars with providing
including cutting, bending,
4 welding,binding in position, 1.27 MT 71264
hooking, placing in position with
all leads & lifts etc. complete c)
Back fill with selected earth from
out side borrow area or from
excavated usefull material
including watering, ramming,
5 consolidation etc. with pneumatic 69.65 cum 36.90
templing and lead upto 1.0 Km.
and all lift etc completed.
Fabrication and erection of Main
Girder section and Leg support
section for constructing of Height
6 Gauge for super structure
including foundation bolt, ISMB, 7.78 MT 93727
ISMC,CLEAT ANGLE, Bolts, plates
I/We am/are willing to carry out the work at… ...................... % above/below
percent(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure)
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ-Slice-I Barrier.pdf
SBD Height barrier RBC slice-1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .