Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC | ₹54.1 L | L1 | Accepted-AOC L1 - LOWEST TENDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | ASKER ALI VTM L2 | aljovincent L3 | NA VINCENT L4 | MUHAMMED SHAFI K.A L1 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of building | |||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 606.38 | sqm | 8 ₹4,851 | 5 ₹3,031.88 Lowest | 10 ₹6,063.75 | 7.4 ₹4,487.18 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 126.36 | cum | 310 ₹39,171.6 | 300 ₹37,908 | 380 ₹48,016.8 | 287.1 ₹36,277.96 Lowest |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 126.36 | cum | 270 ₹34,117.2 | 300 ₹37,908 | 380 ₹48,016.8 | 254.17 ₹32,116.92 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 22.06 | cum | 6,745 ₹1,48,767.72 | 7,932 ₹1,74,948.19 | 8,000 ₹1,76,448 | 6,331.32 ₹1,39,643.59 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 159.64 | sqm | 328 ₹52,361.92 | 355 ₹56,672.2 | 400 ₹63,856 | 308.2 ₹49,201.05 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 58.72 | cum | 8,915 ₹5,23,497.72 | 10,470 ₹6,14,808.87 | 10,488 ₹6,15,865.85 | 8,371.19 ₹4,91,564.65 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 293.45 | sqm | 650 ₹1,90,745.1 | 720 ₹2,11,286.88 | 800 ₹2,34,763.2 | 608.86 ₹1,78,672.4 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.3 | cum | 7,100 ₹2,29,351.3 | 8,300 ₹2,68,114.9 | 9,000 ₹2,90,727 | 6,659.02 ₹2,15,106.32 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.48 | cum | 10,900 ₹1,36,032 | 12,772 ₹1,59,394.56 | 12,772 ₹1,59,394.56 | 10,193.6 ₹1,27,216.13 Lowest |
Tender Value
₹67.8 L
EMD Value
₹50,000
Closing Date
13 Oct 2025, 6:00 pmClosed
EXECUTIVE ENGINEER LSGD DIVISION THRISSUR
EXECUTIVE ENGINEER LSGD DIVISION THRISSUR DISTRICT PANCHAYATH THRISSUR
107432 MLA-SDF-MLA SDF 2023-24 Kunnamkulam LA - Construction of C.V.Sreeraman Cultural Centre in Kunnamkulam Municipality-In Kunnamkulam Municipality-General Civil Work
2025_LSGD_805519_32
TN 11/25-26
Open Tender
Civil Works - Buildings
Item Rate
330 days
AYYANTHOLE
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 Feb 2026
6 Oct 2025
15 Oct 2025
6 Oct 2025
13 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1341932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .