| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 LRejected-Finance | ₹3.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SIDHIQUE M L2 | SURESH CK L1 |
|---|---|---|---|---|---|
| 1.00ROAD IMPROVEMENT | |||||
| 1.00 | OD437292/2024-2025:[OD from DAR 51.2.3] - Filling with Quarry Muck.
Filling up low lying and water logged areas with local material/ quarry muck, spreading in
layers, leveling the top at site and consolidation by ramming, etc complete for improving the
CBR value of subgrade | 6.39 | cum | 1,024.84 ₹6,548.73 | 1,024.84 ₹6,548.73 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 9.59 | cum | 3,637.2 ₹34,862.56 | 3,637.2 ₹34,862.56 |
| 1.00 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 107.12 | sqm | 350 ₹37,492 | 299.89 ₹32,124.22 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 79.06 | sqm | 391.06 ₹30,917.20 | 391.06 ₹30,917.20 |
| 1.00 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 63.9 | sqm | 83.21 ₹5,317.12 | 83.21 ₹5,317.12 |
| 1.01 | 5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 63.9 | sqm | 16.71 ₹1,067.77 | 16.71 ₹1,067.77 |
| 1.01 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 855 | sqm | 13.98 ₹11,952.90 | 13.98 ₹11,952.90 |
| 1.01 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 918.9 | sqm | 267.91 ₹2.5 L | 267.91 ₹2.5 L |
Tender Value
₹3.4 L
EMD Value
₹8,463
Closing Date
10 Apr 2025, 5:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER OFFICE MANJERI MUNICIPALITY
Annual Plan-Manjeri Municipality 2024-25 , Project No- 1418-KOVILAKAMKUND COLONY ROAD PARUTHIPATTA ROAD RETARRING WARD-32- General Civil Work
2025_LSGD_748575_71
2716147/24/6
Open Tender
Civil Works - Roads
180 days
MANJERI
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,463
Yes
6 Jan 2026
31 Mar 2025
11 Apr 2025
31 Mar 2025
10 Apr 2025
31 Mar 2025
Amount
ROAD IMPROVEMENT
OD437292/2024-2025:[OD from DAR 51.2.3] - Filling with Quarry Muck. Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65)
5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65)
SIDHIQUE M (BID ID -2189452)
Bidder Name
SIDHIQUE M
SURESH CK
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1230219.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid