Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹13.4 L Quoted ₹10.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 LRejected-AOC MOONIDIH COLLIERY CIL | ₹10.6 L | L2 | Rejected-AOC L2 |
Tender Value
₹10.1 L
EMD Value
₹12,622
Closing Date
6 Mar 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Transportation of one motor, belt structure from E-9 B/G near 5 dip jn and Regular maintenance of 9 no.of conveyor belt etc. Moonidih Colliery, W.J. Area
2026_BCCL_353777_1
BCCL/WJA/MND/SUR/2025-26/113
Open Tender
Miscellaneous Works
25 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹12,622
1 Apr 2026
20 Feb 2026
7 Mar 2026
20 Feb 2026
6 Mar 2026
20 Feb 2026
Transportation of one motor, belt structure from E-9 B/G near 5 dip jn and Regular maintenance of 9 no.of conveyor belt etc. Moonidih Colliery, W.J. Area
Transportation of one 110kw motor from surface to 10th D/R belt drivehead in XVI(T) seam i.e. analysis 1)Lowering of Motor in one trolley and transportation upto 7th D/R in 400mh mainline=6 unskilled required 2)Transportation of motor upto 10th D/R jn. of D-18 B/G through Track &Haulages=6 unskilled required. 3)Manual Transportation of Motor in 10th D/R upto drivehead i.e.(50m)=14 unskilled required . (Total manshift=(6+6+14)=26 Unskilled required Cost involved @ Rs(1402.6)/unskilled
Transportation of one burnt 110kw motor from 10th D/R belt drivehead to surface in XVI(T) seam. analysis 1)Manual Transportation of Motor in 10th D/R upto D-18 B/G i.e.(50m)=14 unskilled required . 2)Transportation of motor from 10th D/R jn. of D-18 B/G upto 7th Rise in 400mh mainline through Track &Haulages=6 unskilled required Total manshift=(6+14)=20 Unskilled required Cost involved @ Rs(1402.6)/unskilled
Manual Transportation of belt structure from E-9 B/G near 5 dip jn to D-18 B/G(1200mm belt structure) for 18m belt structure ( i.e 6 legpost+ 6 bracket + 12 chanel + 20 rollar) for 100m (legpost- 34, brackets- 34, channels- 66, roller- 110,) Analysis: Manshift required for manual transportation of 18m belt structure ( i.e 6 legpost+ 6 bracket + 12 chanel + 20 rollar) = 18 Unskilled manshift , cost /m= (18x 1402.6)/18= Rs 1402.6/m
Regular maintenance of 9 no.of conveyor belt at XVI(T) seam including cleaning along driveheads,Alignment of Belt structure, joint making,drain management,Assisting the fitters in other related jobs etc. 8 unskilled manshift is required for 60 days Analysis: unskilled manshift required=8/shift Cost involved=(1402.6 X 8)=Rs.11220.80/Day
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.69 MB
BOQ_366588.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid