| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.0 L+₹35,226.26 (1.80%)Rejected-AOC CHEMPANODA KATIKULAM ROAD PERAMBRA KOZHIKODE DISTRICT KERALA | KOZHIKODE | KERALA | 673525 | L2 | Rejected-AOC L2 | |
| 3 | L3₹20.1 L+₹53,101.65 (2.71%)Rejected-AOC 17 01 DISTRICT TREASURY THAMARASSERY | KOZHIKODE | KERALA | 612906 | L3 | Rejected-AOC L3 | |
| 4 | L4₹21.0 L+₹1.4 L (7.19%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹22.7 L
EMD Value
₹50,000
Closing Date
19 Feb 2025, 6:55 pmClosed
Executive Engineer
O/O Executive Engineer ,KyIP Division Perambra
Canal Bridge
2025_Irrig_736688_1
EE/KyIP/21/2024-25
Open Tender
Civil Works - Bridges
Item Rate
365 days
pantheerikkara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
26 Mar 2025
11 Feb 2025
21 Feb 2025
12 Feb 2025
19 Feb 2025
12 Feb 2025
12 Feb 2025 - 19 Feb 2025
Amount
Demolishing of existing super passage
15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
Construction of bridge and canal lining
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD23606/2024-2025:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade(copy from spec 51.2.3.)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsAbove 20 cm wide
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
RAJOYJOSEPH PJ (BID ID -2107473)
JIMMI DAVID (BID ID -2117119)
MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY (BID ID -2116953)
Bidder Name
N.P. KANARAN
RAJOYJOSEPH PJ
JIMMI DAVID
MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1181227.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .