Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
9 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TRD BSP
16 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Must have A-Class valid Electrical Contractor's license (ECL) in the name of Firm or Contractor. In case existing ECL is not valid on the date of opening of tender, documentary proof regarding renewal shall be submitted along with the tender document.
The tenderer must have successfully completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40%ofadvertisedvalue of the tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (Note: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of opening of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate).
The tenderer in support of his/their claim of qualifying the laid down "Technical Eligibility Criteria" must submit Experience Certificate as per format prescribed in Annexure "C" duly self attested/digitally signed on each page (Self Attestation shall include signature, date & stamp of the tenderer).
Similar work means; "(1)Execution of 25 kV/2X25 kV Electrification work Or (2)Execution of 25 kV/2X25 kV feeder wire work Or (3)Execution of 25 kV/2X25 kV OHE modification work Or (4)Execution of 25 kV/2X25 kV OHE upgradation work Or (5)Execution of 25 kV/2X25 kV OHE maintenance work Or (6)Execution of 25 kV/2X25 kV OHE AMC work Or (7)Execution of 25 kV/2X25 kV OHE rehabilitation work Or (8)Execution of 25 kV/2X25 kV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ATD/cantilever assembly Or (9)Execution of 66 kV or higher voltage overhead Transmission line work Or (10)Execution of 66 kV or higher voltage Sub-station work".
16 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Terms of payment: Subject to any deductions or recoveries which the purchase may be entitled to make under the contract, the contractor shall unless otherwise agreed to be entitled to get the payments subject to conditions stipulated in the subsequent clauses.
On Account Payment/ Progress payment: The tenderer has to supply the exact quantity of material specified by Sr. DEE/Tr- D/BSP and after this only the on Account payment will be processed accompanied by relevant document. On Account Payment to the extent of 75% will be made under total unit price of each supply items included in the schedule of price after supply only. All invoices/bills of materials in good condition shall be accompanied with the following: a)Supplier's challan for supply of items only. b)Inspection certificate granted by RITES/authorized representative of Sr. DEE/Tr-D/ Bilaspur. c)Execution of indemnity bond on stamp duty in case of materials supplied by the Railways. d)Detailed entries made in the e-measurement book. e)Consignee's test certificate.
Final Payment: Balance 25% payment will be made through final bill only after satisfactory completion of the entire contractual work, satisfactory operation and handing over of the assets to the Railway duly tested and commissioned subject to compliance of the following:- a)A no claim certificate in favour of Railway is issued by the contractor. b)Any other paper required for obtaining EIG sanction.
Tax Deduction:
Income tax @ 2% plus surcharge as applicable on the amount tobe paid by the contractor in pursuance of the contract which willbe deducted from the bills preferred by him in accordance withsection 1204C of the Income Tax Act, 1961 as introducedthrough finance Act of 1972 or as amended from time to time.
GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill. GST shall be paid as per the prevailing rate of Govt. of India at that time. For claiming subsequent bills, the contractor will have to produce voucher/challan regarding submission of GST for previous bill. If the contractor failed to produce the voucher/challan of previous bill the equivalent amount will be deducted from contractor's bill.
Contractor should quote the rate including GST as applicable.
All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
As per Railway Board letter no 2017/CE-I/CT/4/GST dtd 23.06.2017, Subsequent to the enactment of GSTAct, Board (ME) has approved modification to para (a) of clause 6, Part-I of Indian Railways StandardGeneral Conditions of Contract, july 2014. The Revised para (a) of clause 6 shall be read as under:-
Provision/Modification of OHE in connection with (1) Chhulha: Construction of Long Loop Line (CAL-750m, DS-PT) with bi-directional 03rd line by extending DE of loop line no.-5 at APR end. (2) AAL: Extension of DE Up loopL/7 at KTE end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) LOA- Construction of Dn long haul loop (CAL-1500m) by extending DE of existing Dn loop line no.-1 at KTE end with reception facility.
TRD-BSP-324-26-27-17~SECR
TRD-BSP-324-26-27-17
Open
Works - General
18 Months
Bilaspur, Chhattisgarh
₹0
₹5.8 L
10 Oct 2026
10 Oct 2026
26 Oct 2026
675 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,01,96,631.88 | ||
| — | 2.00 | — | — | ||
| Supply: Preparation of Design and Drawing for OHE (a) Preparation & supply of GAD ,sectiondiagram,LOP & CSD | — | — | — | 18,112 | |
| — | 2.00 | — | — | ||
| Supply: Preparation of Design and Drawing for OHE (b) Preparation & supply of SED & as erected drawing | — | — | — | 16,710 | |
| — | 10.00 | — | — | ||
| Erection:- Concrete for Foundation & Plinth in Hard soil | — | — | — | 82,270 | |
| — | 10.00 | — | — | ||
| Erection:- Concrete for Foundation & Plinth in Rocky soil | — | — | — | 85,510 | |
| — | 185.00 | — | — | ||
| Erection:- Concrete for Foundation & Plinth in other than Hard and Rocky soil | — | — | — | 13,06,100 | |
| — | 21.28 | — | — | ||
| Supply:- Galvanised Traction Mast (Rolled or Fabricated) | — | — | — | 27,65,527.52 | |
| — | 10.00 | — | — | ||
| Erection/NPB: Galvanised Traction Mast (Rolled or Fabricated) | — | — | — | 58,420 | |
| — | 11.28 | — | — | ||
| Erection/PB:Galvanised Traction Mast (Rolled or Fabricated) | — | — | — | 1,31,784.24 | |
| — | 0.44 | — | — | ||
| Supply: portal structure (b) Drop Arms complete set including all fittings | — | — | — | 55,287.86 | |
| — | 0.44 | — | — | ||
| Erection/PB Portal structure (b) Drop Arms complete set including all fittings | — | — | — | 9,100.33 | |
| — | 2.53 | — | — | ||
| Supply: T.T.C. complete | — | — | — | 3,15,196.02 | |
| — | 2.53 | — | — | ||
| Erection/PB:T.T.C. complete | — | — | — | 55,146.96 | |
| — | 2.00 | — | — | ||
| Supply: FIXTURE S(C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | — | — | — | 2,61,892 | |
| — | 1.50 | — | — | ||
| Erection/NPB: FIXTURES (C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | — | — | — | 11,428.5 | |
| — | 0.50 | — | — | ||
| Erection/PB:FIXTURES (C1) Fabricated Steel work other than Mast (including super masts for feeder wire) | — | — | — | 7,577.5 | |
| — | 1.20 | — | — | ||
| Supply:FIXTURES (C2) Supply of GI fastners | — | — | — | 1,66,650 | |
| — | 45.00 | — | — | ||
| Supply: CANTILEVER & INSULATORS (a) Single Bracket assembly for Conventional OHE with SPS | — | — | — | 9,61,470 | |
| — | 35.00 | — | — | ||
| Erection/NPB:CANTILEVER Conventional OHE with SPS | — | — | — | 36,855 | |
| — | — | — | assembly | ||
| — | 10.00 | — | — | ||
| Erection/PB: Conventional OHE with SPS | — | — | — | 20,800 | |
| — | — | — | assembly | ||
| — | 45.00 | — | — | ||
| Supply: INSULATORS & COMPONENTS (E1) Stay Arm Insulator | — | — | — | 2,31,615 | |
| — | 45.00 | — | — | ||
| Supply: INSULATORS & COMPONENTS (E2) Bracket Insulator | — | — | — | 2,27,700 | |
| — | 1.50 | — | — | ||
| Supply: INSULATORS & COMPONENTS (b) Assorted Components for conventional OHE | — | — | — | 1,03,909.5 | |
| — | 1.00 | — | — | ||
| Erection/NPB: (ii) Erection of OHE OHE (Conventional) | — | — | — | 42,784 | |
| — | 0.50 | — | — | ||
| Erection/PB: (ii) Erection of OHE OHE (Conventional) | — | — | — | 42,784 | |
| — | 4.00 | — | — | ||
| Supply: Extra on item 22,23 & 24 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | — | — | — | 13,996 | |
| — | 4.00 | — | — | ||
| Erection/PB: Extra on item 22, 23 & 24 for Supply and Erecrion of additional fitting at a turnout Diamand Crossing or Overlap | — | — | — | 7,460 | |
| — | 4.00 | — | — | ||
| Supply: Solid Core Cut-in-Insulator a) (i) 9 Ton Insulator | — | — | — | 29,956 | |
| — | 4.00 | — | — | ||
| Supply: Solid Core Cut-in-Insulator (ii) Component | — | — | — | 7,928 | |
| — | 2.00 | — | — | ||
| Erection/NPB: Solid Core Cut-in-Insulator b) Erection | — | — | — | 2,610 | |
| — | 2.00 | — | — | ||
| Erection/PB: Solid Core Cut-in-Insulator b) Erection | — | — | — | 5,222 | |
| — | 4.00 | — | — | ||
| Supply: Section Insulator assembly (for Con. OHE) a) (i) 9 Ton Insulator | — | — | — | 30,440 | |
| — | 4.00 | — | — | ||
| Supply: Section Insulator assembly (for Con. OHE) (ii) S / I assembly | — | — | — | 1,96,616 | |
| — | 4.00 | — | — | ||
| Supply: Section Insulator assembly (for Con. OHE) (iii) Core Insulator | — | — | — | 36,044 | |
| — | 2.00 | — | — | ||
| Erection/NPB: Section Insulator assembly (for Con. OHE) (b) Erection | — | — | — | 7,564 | |
| — | 2.00 | — | — | ||
| Erection/PB: Section Insulator assembly (for Con. OHE) (b) Erection | — | — | — | 15,126 | |
| — | 4.00 | — | — | ||
| Supply: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | — | — | — | 45,664 | |
| — | 2.00 | — | — | ||
| Erection/NPB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | — | — | — | 1,842 | |
| — | 2.00 | — | — | ||
| Erection/PB: TERMINATION (a) Guy Rod assembly including Mast Anchor / Guy Rod attachment | — | — | — | 3,666 | |
| — | 5.00 | — | — | ||
| Supply: TERMINATION (b) BC Anchor loop | — | — | — | 6,120 | |
| — | 3.00 | — | — | ||
| Supply: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | — | — | — | 3,36,024 | |
| — | 1.00 | — | — | ||
| Erection/NPB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | — | — | — | 3,499 | |
| — | 2.00 | — | — | ||
| Erection/PB: TERMINATION Regulating Equipment 3 Pulley type with Counter Weight assembly, guide tube for Conventional OHE | — | — | — | 13,996 | |
| — | 5.00 | — | — | ||
| Supply: Termination of Double Conductor of OHE (a) (i) 9 Ton Insulator | — | — | — | 36,260 | |
| — | 5.00 | — | — | ||
| Supply: Termination of Double Conductor of OHE (ii) Component | — | — | — | 56,335 | |
| — | 2.00 | — | — | ||
| Erection/NPB: Termination of Double Conductor of OHE (B) Erection | — | — | — | 2,110 | |
| — | 3.00 | — | — | ||
| Erection/PB: Termination of Double Conductor of OHE b) Erection | — | — | — | 6,219 | |
| — | 2.00 | — | — | ||
| Supply: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) a) (i) 9 Ton Insulator | — | — | — | 15,722 | |
| — | 2.00 | — | — | ||
| Supply: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) (ii) Component | — | — | — | 14,804 | |
| — | 2.00 | — | — | ||
| Erection/PB: Termination of 25 KV Alluminium Feeder / Return Conductor (Single Spider) b) Erection | — | — | — | 5,170 | |
| — | 4.00 | — | — | ||
| Supply: 25 Kv Post Insulator a) (i) Post Insulator | — | — | — | 33,852 | |
| — | 4.00 | — | — | ||
| Supply: 25 Kv Post Insulator (ii) Component | — | — | — | 3,120 | |
| — | 2.00 | — | — | ||
| Erection/NPB: 25 Kv Post Insulator b) Erection | — | — | — | 1,394 | |
| — | 2.00 | — | — | ||
| Erection/PB: 25 Kv Post Insulator b) Erection | — | — | — | 2,596 | |
| — | 1.00 | — | — | ||
| Supply: Single Pole Isolator with Earth Contact assembly a) (i) SP Isolator assembly | — | — | — | 63,445 | |
| — | 1.00 | — | — | ||
| Supply: Single Pole Isolator with Earth Contact assembly (ii) Earth Contact assembly | — | — | — | 10,191 | |
| — | 1.00 | — | — | ||
| Erection/PB: Single Pole Isolator with Earth Contact assembly b) Erection | — | — | — | 7,415 | |
| — | 1.00 | — | — | ||
| Supply: Double Pole Isolator with Earth Contact assembly a) (i) DP Isolator assembly | — | — | — | 1,24,964 | |
| — | 1.00 | — | — | ||
| Supply: Double Pole Isolator with Earth Contact assembly (ii) Earth Contact assembly | — | — | — | 10,229 | |
| — | 1.00 | — | — | ||
| Erection/PB: Double Pole Isolator with Earth Contact assembly b) Erection | — | — | — | 14,769 | |
| — | 44.00 | — | — | ||
| Supply: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | — | — | — | 20,504 | |
| — | 44.00 | — | — | ||
| Erection: BONDS Structure Bondof Avg length 3.25 mtrs including fastners | — | — | — | 2,728 | |
| — | 10.00 | — | — | ||
| Supply: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | — | — | — | 6,170 | |
| — | 10.00 | — | — | ||
| Erection: BONDS Longitudinal Bond of length 4.50 mtrs for cross over point including fatners | — | — | — | 1,800 | |
| — | 4.00 | — | — | ||
| Supply: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | — | — | — | 1,968 | |
| — | 4.00 | — | — | ||
| Erection: BONDS Transverse/Special Bondf Avg length 3.25 mtrs inclduing Pvc Sleeve and fastners | — | — | — | 292 | |
| — | 44.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Number Plate Retro reflective type (Mast / Structure) | — | — | — | 21,340 | |
| — | 44.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Number Plate Retro reflective type (Mast / Structure) | — | — | — | 5,280 | |
| — | 40.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS Caution Board for 25 KV Traction | — | — | — | 14,800 | |
| — | 40.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Caution Board for 25 KV Traction | — | — | — | 4,760 | |
| — | 40.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Danger Board for 25 KV Traction | — | — | — | 14,800 | |
| — | 40.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Danger Board for 25 KV Traction | — | — | — | 4,760 | |
| — | 40.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Public Caution Board | — | — | — | 14,800 | |
| — | 40.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Public Caution Board | — | — | — | 4,760 | |
| — | 40.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Elect. Engine Stop Board | — | — | — | 41,320 | |
| — | 40.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Elect. Engine Stop Board | — | — | — | 10,160 | |
| — | 40.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Working limit Board (Power Block) | — | — | — | 14,800 | |
| — | 2.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Working limit Board (Power Block) | — | — | — | 238 | |
| — | 1.00 | — | — | ||
| Supply: NUMBER PLATE & CAUTION BOARDS: Sectioning Diagram Board | — | — | — | 11,293 | |
| — | 1.00 | — | — | ||
| Erection/NPB: NUMBER PLATE & CAUTION BOARDS: Sectioning Diagram Board | — | — | — | 1,130 | |
| — | 1.00 | — | — | ||
| Erection NPB: NUMBER PLATE & CAUTION BOARDS Modififcation to section diagram at stations and TPC | — | — | — | 2,946 | |
| — | 10.00 | — | — | ||
| Under PB: MODIFICATION WORK Modification to Erected Equipmentsa) :Transfer of Equipment from one Mast/support to another | — | — | — | 70,110 | |
| — | 6.00 | — | — | ||
| Supply: MODIFICATION WORK: Modification to Erected Equipments: (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | — | — | — | 26,484 | |
| — | 6.00 | — | — | ||
| Erection/PB: MODIFICATION WORK: Modification to Erected Equipments: (b) Splicing and Extension of Anchored OHE including PVC Sleeve under ROB | — | — | — | 74,670 | |
| — | 20.00 | Each Span | — | ||
| Erection/PB: MODIFICATION WORK: Modification to Erected Equipments(e) Adjustment of existing OHE with Tower wagon checking | — | — | — | 32,960 | |
| — | 5.00 | — | — | ||
| NPB: DISMANTALING WORK Dismantaling of Mast/Structure upright | — | — | — | 18,895 | |
| — | 5.00 | — | — | ||
| PB: DISMANTALING WORK Dismantaling of Mast/Structure upright | — | — | — | 36,725 | |
| — | 6.00 | — | — | ||
| NPB:DISMANTALING WORK Dismantaling of Cantilever | — | — | — | 5,478 | |
| — | 4.00 | — | — | ||
| PB: DISMANTALING WORK Dismantaling of Cantilever | — | — | — | 7,208 | |
| — | 1.00 | — | — | ||
| NPB: DISMANTALING WORK Dismantaling of Guy rod assembly | — | — | — | 846 | |
| — | 1.00 | — | — | ||
| PB:DISMANTALING WORK Dismantaling of Guy rod assembly | — | — | — | 1,662 | |
| — | 1.00 | — | — | ||
| NPB:DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | — | — | — | 3,388 | |
| — | 1.00 | — | — | ||
| PB:DISMANTALING WORK Dismantaling of Regulating Equipment with Counter Weight assembly | — | — | — | 6,776 | |
| — | 1.00 | — | — | ||
| PB: DISMANTALING WORK Dismantaling of Small Steel parts | — | — | — | 8,548 | |
| — | 2.00 | — | — | ||
| PB : DISMANTALING WORK Dismantaling of Dismantling of termination | — | — | — | 21,686 | |
| — | 2.00 | — | — | ||
| Supply: MISCELLANEOUS: Single Earth Electrode | — | — | — | 6,890 | |
| — | 2.00 | — | — | ||
| Erection/NPB:MISCELLANEOUS Single Earth Electrode | — | — | — | 4,842 | |
| — | 1.00 | — | — | ||
| Supply: Provision of Auxilary Transformer 25KV / 230 V, 10KVA | — | — | — | 1,50,545 | |
| — | 1.00 | — | — | ||
| Erection/NPB: Auxilary Transformer 25KV / 230 V, 10KVA | — | — | — | 13,680 | |
| — | 400.00 | — | — | ||
| Supply: Large span wire (130 /Sq.mm) | — | — | — | 4,81,600 | |
| — | 400.00 | — | — | ||
| Erection/PB: Large span wire (130 /Sq.mm) | — | — | — | 61,600 | |
| — | 472.50 | — | — | ||
| Supply: Supply of Overhead Equipment (C) Dropper Wire (5mm) | — | — | — | 86,467.5 | |
| — | 8.00 | — | — | ||
| Supply:Supply of Overhead Equipment e) Large Jumper Wire (105 Sq.mm) | — | — | — | 8,336 | |
| — | 24.00 | — | — | ||
| Supply: Supply of Overhead Equipment f) Small Jumper Wire (50 Sq.mm) | — | — | — | 11,640 | |
| — | 240.00 | — | — | ||
| Supply: Hard drawn conductor for cross feeder 150 Sq.mm (37/2.25 mm) | — | — | — | 3,16,900.8 | |
| — | 240.00 | — | — | ||
| Erection/PB: Hard drawn conductor for cross feeder 150 Sq.mm (37/2.25 mm) | — | — | — | 20,640 | |
| — | 4.00 | — | — | ||
| Sypply: MISCELLANEOUS Componant of termination of 130/150 Sq.mm cross feeder wire | — | — | — | 23,104.2 | |
| — | 60.00 | — | — | ||
| — | 10.00 | — | — | ||
| — | — | — | 62,030 | ||
| — | 4.00 | — | — | ||
| — | — | — | 636 | ||
| — | 6.00 | — | — | ||
| Erection/PB: MISCELLANEOUS Component of Large copper jumper wire 160 Sq.mm | — | — | — | 1,908 | |
| — | 20.00 | — | — | ||
| Supply: 1. Contact wire Parallel Clamp (Small)1041-2, Spec.No. ETI/OHE/P/1040-2 Rev-E. | — | — | — | 3,920 | |
| — | 20.00 | — | — | ||
| Supply: MISCELLANEOUS 2. 1030-2 | — | — | — | 4,480 | |
| — | 20.00 | — | — | ||
| Supply: MISCELLANEOUS 3. 1050-3 | — | — | — | 5,160 | |
| — | 20.00 | — | — | ||
| Supply: MISCELLANEOUS 4. 1030-3 | — | — | — | 4,012 | |
| — | 10.00 | — | — | ||
| Supply: MISCELLANEOUS 5. 1551 | — | — | — | 5,130 | |
| — | 4.00 | — | — | ||
| Supply: MISCELLANEOUS 6. cat end fitting 65 sqmm | — | — | — | 2,216 | |
| — | 4.00 | — | — | ||
| Supply: MISCELLANEOUS 7. cat splice 65 sqmm | — | — | — | 2,236 | |
| — | 4.00 | — | — | ||
| Supply:8.MISCELLANEOUS Contact wire splice (Toothed type) | — | — | — | 5,168 | |
| — | 10.00 | Each Span | — | ||
| Supply: MISCELLANEOUS: 10.Feeder strain clamp-1600 | — | — | — | 18,790 | |
| — | 1.50 | — | — | ||
| Erection: MISCELLANEOUS Handling,leading ,loading and transportation charges for Railway supply materials from diffrent railway site and released materails from diffrent railway site ,if any tothe concerned depot | — | — | — | 17,276.55 | |
| — | 3.00 | — | — | ||
| Supply: MISCELLANEOUS Battery operated Impact Wrench Tool holder 1/2 inch external square with one number of spare battery as per specification No load speed: 0-1900rpm, Max. Torque: 650 Nm, Impact rate: 0-2100 BPM, Battery voltage: 18V, Screw diameter: M12-M20. Make: BOSCH or similar as per specification in model : GDS 18V-LI HT 250 model | — | — | — | 77,880 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ExplanatoryNote322.pdf
ATTACHMENT
Proforma.pdf
ATTACHMENT
13.03.2026ACS11_compressed.pdf
ATTACHMENT
GCCACS1212.08.26_compressed.pdf
ATTACHMENT
Generalinstructionandspecialcondition.pdf
ATTACHMENT
AllRDSOTRDspecifications.pdf
ATTACHMENT
master_list_of_drawings_TI_compressed.pdf List of Drawings
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
GCCACS1.pdf
ATTACHMENT
GCCACS-2.pdf
ATTACHMENT
GCCACS-3.pdf
ATTACHMENT
GCCACS4.pdf
ATTACHMENT
GCCACS5.pdf
ATTACHMENT
GCCACS6.pdf
ATTACHMENT
GCCACS7latest.pdf
ATTACHMENT
GCCACS8.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
Tenderformfirstsheet.pdf
ATTACHMENT
Tenderformsecondsheet.pdf
ATTACHMENT
Tenderformthirdsheet.pdf
ATTACHMENT
master_list_of_drawings_TI_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .