Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.3 LAccepted-AOC | ₹71.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹76.2 L+₹4.9 L (6.83%)Rejected-AOC | ₹76.2 L+₹4.9 L (6.83%) | L2 | Rejected-AOC L2 |
| 3 | L3₹77.0 L+₹5.7 L (7.96%)Rejected-AOC | ₹77.0 L+₹5.7 L (7.96%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | T. RATHNAKARAN L3 | Sujesh M K L1 | SIBIN.T.K. L2 |
|---|---|---|---|---|---|---|
| 1.00Pazhassi Kovilakam Pond Renovation | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 842.63 | cum | 245 ₹2,06,443.86 | 225.09 ₹1,89,667.14 Lowest | 240.45 ₹2,02,609.9 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1,088.92 | cum | 125 ₹1,36,114.5 | 114.47 ₹1,24,648.21 Lowest | 122.28 ₹1,33,152.65 |
| 1.00 | OD348018/2025-2026:Carriage of Excavated earth from the Site to a lead of 5Km in paved roads by
Mechanical Transport including loading, Unloading and stacking | 505.58 | cum | 217 ₹1,09,710.21 | 201.42 ₹1,01,833.32 Lowest | 215.17 ₹1,08,785 |
| 1.00 | OD542796/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality
blasted rubble including conveyance of material and labour charges etc. complete as per
direction of departmental officers at site .Modified data of 60.7.2 | 117.32 | cum | 2,775 ₹3,25,574.1 | 2,592.42 ₹3,04,153.08 Lowest | 2,769.38 ₹3,24,914.74 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 73.08 | cum | 9,800 ₹7,16,223.2 | 9,163.97 ₹6,69,739.58 Lowest | 9,789.52 ₹7,15,457.28 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,481.3 | kilogram | 107 ₹5,86,499.1 | 98.22 ₹5,38,373.29 Lowest | 104.93 ₹5,75,152.81 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 86.56 | sqm | 370 ₹32,027.2 | 337.38 ₹29,203.61 Lowest | 360.41 ₹31,197.09 |
| 1.01 | OD419992/2023-2024:MR _35 Laterite masonry with neatly dressed laterite stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1 of DAR) | 693.85 | cum | 6,550 ₹45,44,730.6 | 6,080.92 ₹42,19,258.5 Lowest | 6,496.02 ₹45,07,276.47 |
| 1.01 | OD384793/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete | 265.6 | metre | 118 ₹31,340.8 | 105.69 ₹28,071.26 Lowest | 112.9 ₹29,986.24 |
Tender Value
₹76.2 L
EMD Value
₹50,000
Closing Date
5 Mar 2026, 5:00 pmClosed
RAJANI P P
ASSISTANT ENGINEER MTTANNUR MUNICIPALITY
Mattannur Municipality 135/25- Pazhassi Kovilakam Pond Renovation -General Civil Work
2026_LSGD_839068_1
AE/CSGD/MTNR/25-26
Open Tender
Civil Works - Others
Item Rate
365 days
MATTANNUR
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
4 Jun 2026
21 Feb 2026
7 Mar 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pazhassi Kovilakam Pond Renovation | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.2 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.4 | cum | - | - |
| 1.003 | OD348018/2025-2026:Carriage of Excavated earth from the Site to a lead of 5Km in paved roads by
Mechanical Transport including loading, Unloading and stacking | 0.8 | cum | - | - |
| 1.004 | OD542796/2024-2025:DR PACKING Under foundation - Dry stone packing under foundation with good quality
blasted rubble including conveyance of material and labour charges etc. complete as per
direction of departmental officers at site .Modified data of 60.7.2 | 0.6 | cum | - | - |
| 1.005 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.6 | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.008 | OD419992/2023-2024:MR _35 Laterite masonry with neatly dressed laterite stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (MOD 50.6.7.1 of DAR) | 0.8 | cum | - | - |
| 1.009 | OD384793/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1413646.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1413646.xls
BOQ • 0.31 MB
SBD.pdf
Other Document • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .