Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹19,200
Closing Date
13 Jul 2026, 3:00 pmDue tomorrow
Divisional Engineer-(Elec-I), Tirupati
tpty
Hire charges for providing temporary electrical illuminations during float festival and other fairs & festivals at Sri PAT Temple & local surrounding Temples in Tiruchanoor for the year 2026-27.(Part-A
953393
57/DE(Elec.)-I/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
6 documents required · 6 mandatory
₹271
₹19,200
11 Jul 2026
27 Jun 2026
27 Jun 2026
Part - A (Hire charges)
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for supplying, fixing, wiring, servicing and maintaining of LED cup sets consisting of 50 to 100 Nos. of LED bulbs including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. (The work includes drawing of GI wire for lightening of the sets)
For Three days.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral.
For Three days.
Hire charges for supplying, fixing, wiring and 5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Hire charges for supplying laying connecting PVC / XLPE insulated armoured / unarmoured up to 25 sqmm U.G.Cablele with necessary cable glands sockets etc., as required wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
For Three days.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges).
For Three days.
Hire charges for creeping type LED Navara Patty Set which consisting 300 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges
For Three days.
Erection and removal of Single pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete.
For Three days.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets)
For Three days.
Note: The below note applicable for item S.No : 1 to 19 Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
For Three days.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges). Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design. 2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS. 3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
For Three days.
Labour charges for arranging focus lighting and dragging of portable / small generator for vahanam procession during night times on occasion of festivals.
For Three days.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 10 meter. Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident. 4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for single side arch
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for double side arch Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident. 4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Transportation charges for DG set of 62.5 KVA to 125 KVA for Tirumala including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.
Supply, Transportation of Diesel oil for DG Set
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ 57 NEW.xlsx
TENDER_DOCUMENT • 0.07 MB
57 NIT.doc
TENDER_DOCUMENT • 0.79 MB
Download all tender documents and submit your bid