Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 CrAccepted-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | ₹2.6 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.7 Cr+₹8.9 L (3.39%)Rejected-AOC 825 GANDHI CHOWK RANIKHET 263645 DISTRICT ALMORA | RANIKHET | ALMORA | UTTARAKHAND | 263645 | ₹2.7 Cr+₹8.9 L (3.39%) | 2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED IN PART 1 |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
20 Jul 2023, 4:00 pmClosed
SUPRERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
CONSTRUCTION OF 11 KV LINE FOR VARIOUS BORDER OUT POST BOPS OF SSB UNDER EDD CHAMPAWAT ON TURN KEY BASIS
2023_UPCL3_60382_1
07/EDC(P)/202324
Open Tender
Electrical Works
Turn-key
180 days
CHAMPAWAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EE EDD UPCL PITHORAGARH
₹5.3 L
29 Sept 2023
1 Jul 2023
21 Jul 2023
1 Jul 2023
20 Jul 2023
1 Jul 2023
Amount
SUPPLY OF CENTRALISED MATERIAL
STP 410 SP- 21 Pole (Bottom Portion hot dip Galvanised)
STP 410 SP- 23 Pole (Bottom Portion hot dip Galvanised)
STP 410 SP-55 Pole (Bottom Portion hot dip Galvanised)
X-Arm angle V type 11KV
MS Channel 100x50 mm
Angle 65x65x6 mm
MS Angle 50x50x6mm
Stay Set 16*1800
Stay wire 7/10swg
ACSR Rabbit Conductor
LT XLPE Cable 3x 25+1x25 sq. mm.
11 KV Polymer Pin Insulator with N&B
11 KV Polymer Disc insulator (B&S Type)
T/F 25KVA New
11 KV Gang Operating 400 A GO Switch
9KV 5 KA light arrester (Polymer)
LT XLPE Cable 4x 25 sq. mm.
Disc Fitting Rabbit/weasel
EARTHING ROD
Earth Wire GI 7/1.6mm 16 SWG
G.I. wire 5mm/6 swg
SUPPLY OF NON CENTRALISED MATERIAL
Earth wire Clamp for SP-23 Pole with N&B
Earth wire Clamp for SP-55 Pole with N&B
Stay Clamp for SP-23 Pole with N&B
Stay Clamp for SP-55 Pole with N&B
Top Channel Holding Clamp for SP-23 with N&B
Top angle holding clamp below top channel for maintenance Purpose for sp-23 double pole with N&B
Top angle holding clamp below top channel for maintenance Purpose for sp-55 double pole with N&B
F Clamp for 11 KV with N&B
E Clamp for 11 KV with N&B
X-Arm Holding Clamp for SP-23 Pole with N&B
LT AB cable Suspention Clamp for AB cable size 3x25+1x25 sqmm with I-Hook Compleate assesries with N&B
Dead End Clamp for AB cable size 3x25+1x25 sqmm with I-Hook Compleate assesries with N&B
LT Distribution Box 3 P with holding clamp with N&B
Top Channel Holding Clamp for SP-55 with N&B
TPMO holding clamp for SP-23 Pole with N&B
GS Strip 25x3mm
Stay Insulator 11 KV
Special Tri angle Holding Clamp for SP-23 Pole with N&B
Bracing set Clamp Top for Sp-23 Pole with N&B
Bracing set clamp Bottom Sp-23 Pole with N&B
Bracing set Clamp Top for Sp-55 Pole with N&B
Bracing set clamp Bottom Sp-55 Pole with N&B
Bolts & Nuts Off Size.
Guarding angle holding clamp with N&B
LABOUR CHARGE
Cartage of Steel Tubler Poles from store center Tanakpur to construction site with loading, unloading at both points.(Loading ,unlosding plus carriage per pole) and proper stacking.Average lead distance 40 Km.
STP SP - 55 Pole
STP SP - 21 Pole
STP SP - 23 Pole
Cartage of other material (Other than poles) by vehical from store center Tanakpur/Haldawani to nearest construction site store including loading and unloading at both ends.Average lead distance 115 Km.
Steel & Other Material Qtl
Head Load Cartage Of Following Poles Form Road Side (0 To 1 Km)
STP SP - 55 Pole
STP SP - 21 Pole
STP SP - 23 Pole
Head Load Cartage Of Small Materials Form Road Side (0 To 1 Km)
Cartage of 25 KVA Transformer from store center Tanakpur/Haldwani to construction site with loading and unloading at both points.(loading, unloading plus cartage of T/F).Average lead distance 120 Km.
Head Load Cartage Of 25KVA TF Form Road Side (0 To 1 Km)
Exavation of earth for pole pit of size 0.9x0.6x1/6 of full lenth of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the exavated soil and disposel of surplus exavated soil as directed complete.
SP-23 Pole
SP-21 Pole
SP- 55 Pole
Erection of Single pole STP in proper level and alignment alongwith fixing of all accessories,like top channel & clamps as per RESSPO construction manual.
SP- 23 (with CC)
SP- 21 (with CC)
SP- 55 (with CC)
Erection of Double pole STP in proper level and alignment alongwith fixing of all accessories,like top channel & clamps as per RESSPO construction manual.
SP- 23 (with CC)
SP- 55 (with CC)
Erection of Four pole STP SP-23 Pole in proper level and alignment alongwith fixing of all accessories,like top channel & clamps as per RESSPO construction manual.
SP- 23 (with CC)
SP- 55 (with CC)
Grouting of pole in size 0.45x0.45x1/9 of the support in ratio 1:4:8 (1 cment : 4 graded stone stone 20 mm nominal size : 8 coares sand) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper allingment, levelling as per RESSPO construction manual.size 45 cm height from ground level including cost of cement,stone and sand etc.
SP- 23 (with CC)
SP- 21 (with CC)
SP- 55 (with CC)
Erection of four pole structure on Steel tube pole SP-55 with fabriction & fixing of top channel & Other fitting etc.With construction of special plinth with cement.sariya & stone concrete foundation of size 5x2x2 mtr, the base of plinth of size 2x2 mtr.constructed by using cement,concrete & sariya and the area between walls(Hight - 5 Mtr.) constructed with stone & concrete top of the plinth made as above covered with linter of 2x2 mtr. with sariya & cement.
Muffing of Poles size 0.45 cm x0.60 cm radious in with cc 1:3:6(1 cment:4graded stone 20mm nominal size:8 coarse sand) block size 45 cm height from ground level including cost of cement,stone and sand etc.
Fabrication of MS Channel Angle iron after cutting in required sizeswith drilling of holes upto good finish for top channel,bracing and special type bracketetc.as per RESSPO schedule and local approved drawing.
Exavation of earth for Stay pit of size 0.6x0.6x1.2 mtr. In type of soil including proper dressing of sides and ramming of sides and ramming of bottom including getting out the exavated soil and disposal of surplus exavated soil as directed complete work.
Fixing,tightening and nozzalling of stay rod on required tention as per manual.11 KV
Grouting of Stay in size 0.6x0.6xx0.3 in cc ratio 1:4:8 ( 1 cement :4 grade stone 20 mm nominal size :8 coares sand) block including cost of cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper allingment,levelling.
Installation/ mounting of new transformer on plinth/double pole structure and fixing of channel/angle etc. and making all connections of HT and LT side and its complete commissioning.
Mounting/Fixing of TPMO and fuse set on double pole structures including making of connections complete work.
Mounting and fixing of Lighting arrestor set(3 Nos.) on double pole structure including making all connections by G.I. Stripsize 35x6 mm to earth point (including cost of G.I. strip)
Erection and Earthing of Pole support with M.S.Earth rod of 2.5 Mtr. Long including excavation of pit and digging of MS rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual.
Laying,Spreading,Stringing and sagging of 11 KV /33 KV line in 3 Phase ( 3 Phase 4 wire) of ACSR Rabbit conductor as phase wire with G.I. earth wire 7/1.6 mm,16 swg complete including fixing of all accessories in 3 nos.conductor in parallel with binding and jumpering as per Profile .
11 KV line
Laying,Spreading,Stringing and sagging of LT AB Cable Line With Binding And Jumpering With Consumer Cable Disconection And Reconnection
Fixing Of LT Distribution Box Including Consumer Connection Complete.
Painting of poles with angle and channel and all steel part by one coat of red Oxide primer and two coats of Aluminum paint and two strip of fluorescent altemate red and White paint 30 cm. wide upto 1.5 Mtr. From ground lavel.
(A) ST Pole SP-55
(B) ST Pole SP-21
(B) ST Pole SP-23
Providing and fixing of Danger Board,unber plate complete by providing clamps of MS Flat 50x6 mm and Nuts and Bolts,Danger bord of MS Sheet 2 mm Thick 11"x7" size (Including cost of all material)
T-Off Connection Complete 11 KV
Fixing of triangular type bracket in 11 KV Line
Route clearance by cutting of tree branches/ proning,loping and choping of trees for LT & 11 KV .
Guarding Of 11KV
M/s Kashmirilal Constructions Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .