| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-AOC | ₹2.7 L | 1 | Accepted-AOC Admitted |
| 2 | 2₹2.7 LRejected-AOC | ₹2.7 L | 2 | Rejected-AOC Rejected |
| 3 | 3₹2.9 LRejected-AOC | ₹2.9 L | 3 | Rejected-AOC Rejected |
| 4 | 4₹3.2 LRejected-AOC MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | ₹3.2 L | 4 | Rejected-AOC Rejected |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Hindustan Construction L4 | M/S MOHD ISRAIL L1 | M/s Niha Contractor and Supplier L2 | ISHTAKHAR AHAMAD L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc. | 34.5 | M3 | 180 ₹6,210 | 95.4 ₹3,291.30 | 96.05 ₹3,313.73 | 101.7 ₹3,508.65 |
| 1.02 | Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but including cost of shuttering. | 5.04 | M3 | 6,100 ₹30,744 | 5,100.56 ₹25,706.82 | 5,135.46 ₹25,882.72 | 5,437.39 ₹27,404.45 |
| 1.03 | Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 14.95 | M3 | 6,200 ₹92,690 | 4,852.84 ₹72,549.96 | 4,886.05 ₹73,046.45 | 5,173.31 ₹77,340.98 |
| 1.04 | Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete. | 20.45 | M2 | 110 ₹2,249.50 | 129.43 ₹2,646.84 | 130.31 ₹2,664.84 | 137.97 ₹2,821.49 |
| 1.05 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. | 6.47 | M3 | 6,600 ₹42,702 | 6,458.82 ₹41,788.57 | 6,503.01 ₹42,074.47 | 6,885.34 ₹44,548.15 |
| 1.06 | Laying R.C.C. 1:1:2 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement. | 0.45 | M3 | 6,400 ₹2,880 | 7,122.8 ₹3,205.26 | 7,171.54 ₹3,227.19 | 7,593.18 ₹3,416.93 |
| 1.07 | Centering and shuttering or steel shuttering for R.C.C. work including cost of all material, labour and T&P etc. complete. | 24.08 | M2 | 550 ₹13,244 | 548.55 ₹13,209.08 | 552.3 ₹13,299.38 | 584.78 ₹14,081.50 |
| 1.08 | Supplying, laying and consolidation 150 mm thick loose to 100mm of stone ballast size 20 mm to 40 mm by road roller including cost of all material, labour and T&P etc.required for proper completion of work. | 3.11 | M3 | 4,300 ₹13,373 | 2,702.68 ₹8,405.33 | 2,717.97 ₹8,452.89 | 2,881.16 ₹8,960.41 |
| 1.09 | Painting with snowcem including cost of material and labour T&P complete for proper completion of work. paint shall be used as per standard I.S. specification or as per engineer-in-charge. | 41.69 | M2 | 120 ₹5,002.80 | 72.35 ₹3,016.27 | 72.84 ₹3,036.70 | 77.12 ₹3,215.13 |
| 1.10 | Reinforcement in slab, laying, cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work. | 0.64 | MT | 80,000 ₹51,200 | 64,649.4 ₹41,375.62 | 65,091.78 ₹41,658.74 | 68,918.7 ₹44,107.97 |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
23 Feb 2026, 10:00 amClosed
Executive Engineer
Office Sharda Sagar Division Pilibhit
Work for construction of footbridge on Nagariya Minor under the fourth subdivision for the year 2025-26 (At km. 1.650).(Lot 19)
2026_UPIDC_1117329_19
06/E.E/2025-26
Open Tender
Civil Works
45 days
Pilibhit
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹7,000
18 May 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
23 Feb 2026
18 Feb 2026
Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc.
Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but including cost of shuttering.
Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete.
Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1:2 Mix cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement.
Centering and shuttering or steel shuttering for R.C.C. work including cost of all material, labour and T&P etc. complete.
Supplying, laying and consolidation 150 mm thick loose to 100mm of stone ballast size 20 mm to 40 mm by road roller including cost of all material, labour and T&P etc.required for proper completion of work.
Painting with snowcem including cost of material and labour T&P complete for proper completion of work. paint shall be used as per standard I.S. specification or as per engineer-in-charge.
Reinforcement in slab, laying, cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work.
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work inembankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 200m lead or as directed by Engineer- in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
BOQ_2076125.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid