| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC 2 A NARENDRA APPARTMENT CENTRAL JAIL ROAD SUBHASH BRIDGE AHMEDABAD 380027 | AHMEDABAD | AHMEDABAD | GUJARAT | 380027 | L1 | Accepted-AOC BEING THE LOWEST BIDDER | |
| 2 | L2₹21.6 L+₹40,708.96 (1.92%)Rejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 3 | L3₹21.9 L+₹77,094.24 (3.64%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 4 | L4₹22.1 L+₹98,780.96 (4.67%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 5 | L5₹23.8 L+₹2.7 L (12.7%)Rejected-Finance 200 NAVAGAM NAVAGAM TA SAYLA SURENDRA NAGAR GUJARAT 363430 | SURENDRANAGAR | GUJARAT | 363430 | L5 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹35,800
Closing Date
25 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) CHILODA
VAYUSHAKTI NAGAR AF STN CHILODA, GANDHINAGAR
OUTSOURCING SERVICES FOR OPERATION OF E/M INSTALLATIONS AT AREA B AF STATION WADSAR UNDER GE AF CHILODA
2020_MES_381187_2
8846/20-21/E8
Open Tender
Electrical and Maintenance Works
Item Rate
244 days
AREA B AT AF STN WADSAR
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (AF) CHILODA
₹35,800
Yes
3 Dec 2020
6 Nov 2020
27 Nov 2020
6 Nov 2020
25 Nov 2020
13 Nov 2020
6 Nov 2020 - 13 Nov 2020
60 days
Amount
Provisioning of Skilled Electrician-03 Nos(for three shifts) for Management of main receiving station comprising of HT incoming supply system 11 KV 2/4 pole structure with GODs, VCB panel , Ring main units complete all as specified and directed for round the clock (03 shifts for 08 hrs) at 15 BRD AF station Wadsar.
Provisioning of Skilled Electrician-01 Nos(for one shift) for Management of step down transformers installed at different locations, voltage stabilizer, LT distribution system,changeover switches, APFC panel, Power disturibution board etc. complete all as specified and directed for (01 shifts for 08 hrs) at 15 BRD AF station Wadsar.
Rates required to be quoted for executing the work as described in Serial No. 1.00 and 2.00 above :-
Basic Minimum Wages per person (Skilled Labour) as per latest MOL&E Rates/ existing rules.
Employees Provident Fund as mentioned in the tender documents (EPF).
Employees State Insurance Contribution as mentioned in the tender documents (ESIC).
Contribution of Bounus as mentioned in the tender documents.
Over head & profit on serial No. 3.01 to 3.04.
LWC as mentioned in the tender documents (Labour Welfare Cess).
GST as mentioned in the tender documents.
Provisioning of Semi-skilled fitter grade mechanic(FGM)-03 Nos(for three shifts) for Management of water supply installation comprising pump house ,submersible pump, centrifugal pumps, water pump, chlorination/dosing plant , sluice valve, UG sump,Over head tank and DG set for pump house complete all as specified and directed for round the clock (03 shifts for 08 hrs) at 15 BRD AF Station Wadsar.
Provisioning of Semi-skilled fitter grade mechanic(FGM)-01 Nos(for one shift) for maintaining RO plant & water supply distribution network & ensuring uninterrupted water supply for one shift for Eight hours each at 15 BRD wadsar.
Rate required to be quoted for executing the work as described in Serial No. 4.00 and 5.00 here-in-before:-
Basic Minimum Wages Per Person (Semi-Skilled Labour) as per latest MOL&E Rates/ existing rules.
Employees Provident Fund as mentioned in the tender documents (EPF).
Employees State Insurance Contribution as mentioned in the tender documents (ESIC).
Contribution of Bounus as mentioned in the tender documents.
Over head & profit on serial No. 6.01 to 6.04.
LWC as mentioned in the tender documents (Labour Welfare Cess).
GST as mentioned in the tender documents.
Note for Sch `A Item no 3.01 to 3.07 and 6.01 to 6.07 above:-
The bidders are requested to refer the clause 28.00 to 41.00 of Schedule A (BOQ) Notes on Serial Page No 13.00 to 15.00 of Tender Documents before quoting the rates for above rates.
Note for Sch `A Item no 1.00, 2.00, 4.00 and 5.00 above:-
The bidders are requested to refer the E-IN-C's Policy No 66546/Manual/M&O Tender/64/E8 Dated 20 Aug 2020. Contractor has to submit the valid Labour Licence from Labour Comissioner within 15 days of commencement of work. If the contractor fails to submit the same within the stipulated period, the contract shall be liable to be cancelled and the Performance Security of the firm shall be forfeited accordingly.
(i) Electrician hand tools, tester, Meggar, test lamp, safety shoes , Helmet and hand gloves, instulation Tape,Cotton waste and all tools DO rod, spanner set, tool kit, tool bag etc. Hand gloves suitable for working pressure 11000 Volts and tested up to 22000 Volts and pressure guage clamp meter will be provided by the contractor without any extra cost.
(ii) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower.So providing reliever will be sole responsibility of contractor.
(iii)DHPP for running of DG set shall be issued by department all as directed by Engineer - in - Charge.
(iv) Rates quoted shall be including minor repair as per daily weekly or monthly check.
(v) Electrcity as required shall be made available to the contractor free of cost by department.
(vi) Contractor shall maintain the shut down register and log books for running pump sets as per format and all as specified and directed by Engineer in charge.
(vii) Cleaning of Substation/pump house premises and surrounding the area inside fence/compound wall complete all responsibility of contractor.
(viii) Emergency light will be provided by the contractor during night hours without any extra cost.
(ix) All safety precautions as per IE rules should be strictly followed by contracted employees & department shall not be held responsible for any untowards incident.
(x) Attendence Register of Staff Employed will be maintained by JE E/M. If any labour found absent, necessary penalty/recovery will be made by Engineer-in-charge as per CA clause.
(xi) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower.So providing reliever will be sole responsibility of contractor.
(xii) Qualification & experience certificate of contracted labours should be produced by contractor. (i) Electrician (Skilled) & FGM (Semi-skilled) should have minimum qualification ITI and 04 year experience in relevant field. (a) One Electrician (Skilled) & FGM (Semi-skilled) per shift for three shifts in a day shall be required to maintain /checking the installations etc all as directed and specified by Eng in charge (b) The Electrician (Skilled) & FGM (Semi-skilled) Personal shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident /Injury, fatal or partial disability, the cotractor shall be solely responsible for setting all Claims/ Compensation. Department will have a right to recover any sum indicated /Claimed by labour Commissioner/Court directive. GE will however ensure that contractor has provided all adequate & required means to the workmen and contractor shall get his personnel insured.
(xiii) Contractor has to produce Photo ID of the staff employed with security pass number issued by Main Guard Air force Station. (xiv) Staff employed will be given 2 sets of uniform. (xv) GST / EPF paid certificate should be enclosed with RAR. (xvi) It should be ensured by contractor that minimum labour charges are paid as per the minimum fare wages act and wages register duly signed by concerned labour will be produced alongwith RAR by the contractor. If rates quoted by the L1 bidder are less than Schedule of Minimum Fare Wages, then that bidder will not be considered bonafide and action will be taken as per the instructions of Accepting Officer. (xvii) The payment to every staff employed on work shall be made in the Aadhaar linked bank account through account payee cheque/RTGS/NEFT only.
ALBA AC AND REF SERVICES
nirman construction
Ramdev and Sons
ARTI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .