Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.2 LAdmitted-Finance DHARAMSAL TEHSIL KALAKOTE DISTRICT RAJOURI JAMMU AND KASHMIR | KALAKOTE | RAJOURI | JAMMU AND KASHMIR | L1 | Admitted-Finance | ||
| 2 | L2₹55.9 L+₹2.7 L (5.11%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹58.0 L+₹4.8 L (8.93%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹62.4 L+₹9.2 L (17.2%)Admitted-Finance DOMAIL UDHAMPUR UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Admitted-Finance |
Tender Value
₹65.3 L
EMD Value
₹1.3 L
Closing Date
10 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN PWD Division Nowshera
XEN PWD Division Nowshera
Improvement UpGradation of road from Devak Hathal to Mandir Mankole Duarpur Balance work 2nd Call
2026_PWDJK_330369_1
eNit119 of 2026-27
Open Tender
Civil Works
Percentage
Nowshera
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Xen PWD Division Nowshera
₹1.3 L
XEN PWD Division Nowshera
13 Nov 2026
5 Nov 2026
11 Nov 2026
5 Nov 2026
10 Nov 2026
5 Nov 2026
7 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 422 | Cum | 1,885.95 | ₹7,95,870.9 |
| 2 | Providing and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleani preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. | 5,625 | Sqm | 74.35 | ₹4,18,218.75 |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | 281 | Cum | 8,590.95 | ₹24,14,056.95 |
| 4 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt | 5,625 | Sqm | 269.85 | ₹15,17,906.25 |
| 5 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 5,625 | Sqm | 101.4 | ₹5,70,375 |
| 6 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 1,804 | Sqm | 24.12 | ₹43,512.48 |
| 7 | Drain clearance in soils; mixed with moorum/kankar/shingle/boulders; disposal lead upto 50m and lift upto 1.5m | 163 | Cum | 331.15 | ₹53,977.45 |
| 8Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. | |||||
| 8.1 | Sand for an av. lead 50 Kms distance | 34 | Cum | 741.14 | ₹25,198.76 |
| 8.2 | Bajree/Stone aggregates below 40mm nominal size for an av. 32 Kms distance | 186 | Cum | 542.42 | ₹1,00,890.12 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1120795.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .