| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹24.2 L+₹1.1 L (4.72%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.0 L+₹2.9 L (12.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹29.1 L+₹6.0 L (25.8%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹29.3 L
EMD Value
₹58,500
Closing Date
18 Feb 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Construction of road from Kala Khetar Ghai to Masjid Mohallah.
2026_PWDJK_302991_9
NIT NO 84 OF 2025-26 Dated 13-02-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer
₹58,500
21 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in all kinds of soil including rock and disposal of surplus, excavated earth at dumping sites to be purchased by the contractor and approved by the engineer-in-charge at site for safe disposal of same without damaging private /public property and all required leads/lifts and carriage in 80 % AKS 10% OR and 10 % HR.(Complete job) | - | Cum | 257.83 | - |
| 2 | Earth work in trench excavation by mechanical means in aks | - | Cum | 256.85 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40mm nominal size crushed. | - | Cum | 4,826.5 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with 20 percent boulders | - | Cum | 4,774.33 | - |
| 5 | Supply and stacking at site 63mm to 45mm size aggregate | - | cum | 1,204.12 | - |
| 6 | supply and stacking at site stone screening 13.2mm size | 1 | cum | 1,204.15 | ₹1,202.95 |
| 7 | Laying of WBM Gr-II | - | cum | 768.15 | - |
| 8 | Supplying of good earth at site | - | cum | 281.3 | - |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50Mt & lift upto 1.50M. | - | Cum | 218.4 | - |
| 10 | Hand Packed stone filling including supply of stones | - | cum | 937.9 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_983596.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .