| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93,925.57Accepted-AOC NOCHCHAD GRAMA PANCHAYAT KOYILANDI TALUK KOZHIKODE DISTRICT KERALA | ₹93,925.57 | L1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical 2ND LOWEST QUOATED |
| Sl No | Description | Qty | Unit | VK SAJU L1 | SWARAJ O.M. L2 |
|---|---|---|---|---|---|
| 1.00MCF | |||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 0.18 | cum | 669.36 ₹120.48 Lowest | 702.32 ₹126.42 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 267.22 | kg | 163.89 ₹43,794.69 Lowest | 172.54 ₹46,106.14 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 15.91 | sqm | 151.43 ₹2,408.95 Lowest | 159.65 ₹2,539.71 |
| 1.00 | 4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.4 | cum | 10,798.65 ₹25,916.76 Lowest | 12,005.32 ₹28,812.77 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 24 | sqm | 771.19 ₹18,508.56 Lowest | 804.65 ₹19,311.6 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 9.36 | sqm | 339.33 ₹3,176.13 Lowest | 354.54 ₹3,318.49 |
Tender Value
₹93,928
EMD Value
₹2,348
Closing Date
4 Mar 2026, 6:00 pmClosed
ASSISTANT ENGINEER LID EW
ASSISTANT ENGINEER LID EW NOCHAD GP
A n n u a l P l a n - 2 0 2 5 - 2 6 N O C H A D G P RENOVATION OF MCF-61/26
2026_LSGD_840234_1
AE/TN/1/25-87
Open Tender
Civil Works - Others
Item Rate
90 days
NOCHAD GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹2,348
Yes
18 Jun 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1416336.xls
BOQ • 0.30 MB
SBDMCF.pdf
Tender Documents • 1.64 MB
NITMCF.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .