| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 CrAccepted-AOC VILLAGE DEAR GUJARAKIYA JIND ROAD ASSANDH HARYANA 132039 | KARNAL | HARYANA | 132039 | ₹13.5 Cr | L1 | Accepted-AOC As per evaluation committee |
| 2 | L2₹14.2 Cr+₹67.2 L (4.97%)Rejected-AOC | ₹14.2 Cr+₹67.2 L (4.97%) | L2 | Rejected-AOC As per evaluation committee |
Tender Value
₹12.9 Cr
EMD Value
₹12.9 L
Closing Date
4 Jun 2026, 11:00 amClosed
Regional Officer, Chandigarh
Regional Office, Chandigarh, National Highways Authority of India, NHAI Building, Sector - 30B, Chandigarh (UT) - 160030
Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1) Rectification works at the risk and cost of the Contractor at various locations.
2026_NHAI_278480_1
NHAI/RO-CHD/2026-2027/AMB/06
Limited
Civil Works
Item Rate
365 days
PIU Ambala
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
National Highways Authority of India
₹12.9 L
13 Aug 2026
22 May 2026
5 Jun 2026
22 May 2026
4 Jun 2026
22 May 2026
FINANCIAL BID FORM
To From: (Name of Firm)
Regional Office, Chandigarh National Highways Authority of India, NHAI Building, Sector - 30B, Chandigarh (UT) - 160030, (Near Sector – 29-30 Traffic Light, Opposite 30 C Market) Tel: 0172 - 2586818
Name of work: Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1): Rectification works at the risk and cost of the Contractor at various locations.
Reference letter No.
1. Having examined the site of works and Bid Documents, comprising Instructions to Bidders, Scope of works, Conditions of Contract, Technical Specifications, Bill of Quantities and schedules for the execution of the above named works, we, the undersigned offer to execute and complete such works and remedy any defects therein in conformity with the said bid documents for the sum as offered in the online financial bid form or such other sum as may be ascertained in accordance with the said Bid documents.
2. We undertake, if our Bid is accepted, to commence the work within fifteen (15) days of receipt of the order to commence, and to complete and deliver the sections and whole of the works comprised in the Contract within the period stated in the bid hereto.
3. If our Bid is accepted, we will furnish Performance Security (ies) in the form of a Bank Guarantee to be jointly and severally bound on us, in accordance with the Conditions of Contract.
4. We agree to abide by this Bid for the period of One Hundred & Twenty (120) days from the last date fixed for Bid Submission and it shall remain binding upon us and may be accepted at any time before the expiry of that period.
5. We confirm our agreement to treat the Bid documents and other records connected with the works as secret and confidential documents and shall not communicate information contained therein to any person other than the person authorized by the Employer or use such information in any manner prejudicial to the safety and integrity of the works.
6. Unless and until an agreement is prepared and executed, this Bid, together with your written acceptance thereof, shall constitute a binding Contract between us, but without prejudice to your right to withdraw such acceptance without assigning any reasons thereof.
7. We understand that you are not bound to accept the lowest or any bid you may receive.
Yours faithfully
**Name and Designation of the authorised signatory
** Certified copy of Power of Attorney/Authorization for signature shall be furnished by the bidder.
Bill of Quantities (BOQ)
Name of work: Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1): Rectification works at the risk and cost of the Contractor at various locations.
Sr No. Description Unit Quantity Rate per unit Amount (In Rs)
1 Demolishing/Excavation Earth work manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. cum 140910 77.67857142857142
2 Demolishing GSB manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in -charge. cum 2331 129.4642857142857
3 Dismantling and Demolition Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1: 1.5:3 or richer mix (i/c equivalent cum design mix) cum 7459.2 1286.6071428571427
4 Scarifying the existing RE panel and disposal of scarified material within all lifts and lead upto 1km (by mechanical means). sqm 9706.2 129.4642857142857
Wartering and Recompaction of existing soil
5 Extra for laying earth/fly ash as per specifications in 20 cm layers and dressing but excluding the cost of rolling cum 140910 48.21428571428571
6 Extra for watering the earth/fly ash laid in 20 cm layers as per specifications cum 140910 26.785714285714285
7 Extra for rolling to specifications cum 140910 26.785714285714285
8 Construction of Embankment with Material obtained from Borrow pits Construction of Embankment with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications Note:- Compensation for earth w ill vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is required to be clearly stated in the cost estimate. cum 28182 499.99999999999994
9 Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, within all lead and lift complete as per MoRTH specifications clause no 601 and directions of the Engineer In- Charge. cum 2473.6359375 2057.142857142857
10 Cement Concrete Pavement Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. cum 5128.2 5268.749999999999
11 Plain/Reinforced Cement Concrete in Open 1500, 1700 Foundation complete as per Drawing and &2100 Technical 1500, 1700 and 2000 of MORT&H Specifications. PCC Grade M15 cum 110.525625 3784.821428571428
12 Facing elements of RCC as per clause 3104 of MORT&H specifications 1. The specification and construction details to be adopted shall be as per section 3100 of MoRTH Specification. 2.Drainage arrangement shall be made as per approved design and drawings. 3.The quantity of filler media shall be calculated as per approved design and specifications and shall be priced separately: Graded stone aggregates Item 27 .10 (MORTH 13.10) 4.Excavation for foundation including foundation concrete and groove in the foundation for seating of bottom most facia panel and capping beam to be calculated as per design and priced separately. 5.The earth fill to be retained is not included in this analysis. The same is to be worked out and provided separately complete as per clause 305. 6.For compaction of Earthwork, attention is invited to clause 3105.5 of MoRTH Specification. 7.Length of reinforcing strips will vary with the height of wall and will be as per approved design and drawings. 8. The type of reinforcing elements to be adopted shall be as per approved design and specifications. 9. The market rate for supply of reinforcing elements and their accessories are to be ascertained from reputed firms in the field of earth reinforcement. 10.The earth fill material shall be clean, free draining, granular with high friction and lowb cohesion, non-corrosive, coarse grained with not 10 per cent of particles passing 75 micron sieve, free of any deleterious matter, chlorides,salts, acids, alkalies, mineral oil, fungus and microbes and shall be of specified PH value. 11.Capping beam is to be priced separately as per approved design. The rate for cement concrete shall be taken from the chapter of substructure in bridge section. 12.The cost of reinforced earth retaining wall shall include following: (I) Excavation for foundation including backfilling. (ii) Foundation concrete as per approved design. (iii) Cost of facial panels and their erection . (iv) Cost of reinforcing elements including their fixing and joining with the facial panels. (v) Drainage arrangement including filter media as per approved design and drawings. 13. The compacted earth filling to be retained shall form part of embankment. sqm 9706.2 1301.7857142857142
13 Providing and laying of Filter media with granular 710.1.4.of materials/stone crushed aggregates satisfying IRC:78 and the requirements laid down in clause 2504.2.2. 2200 of MoRT H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and MoRT&H Specification. cum 2911.86 1765.1785714285713
14 Construction of RCC M 40 grade crash barrier and friction slab including cost of reinforcement complete as per approved Drawings and Additional Technical Specification. rmt 616.2295125 14094
15 RE Panel Nailling with grouting of cement slurry to retain bulging of RE Panel of existing structures approaches. mtr. 1890 7500
16 Subbase for approach slab(Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desried density, complete as per clause 401. of MORTH specifications.) (GRADE II Material) cum 2375.1 1043.75
17 Reinforced cement concerete approach slab including reinforcement and framework complete as per drawing and MoRTH specification clause 1500,1600,1700 & 2704 cum 132.3 7270.535714285714
18 Providing and laying bituminous concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder PMB-76 @ 5.4%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT®H specifications cum 28.665 11512.16
19 Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications sqm 441 12.499999999999998
20 Providing and laying factory made rubber moulded smooth finish cement concrete Kerb M-20 grade 250mm high with bottom width 165mm and top width 115mm made over strong vibratory table and fixing with cement mortar 1:2 as per MORT&H specifications and complete in all respect and as per direction of engineer in charge rmt 880.0000000000001 319.25
21 Kerb Painting:Painting Two Coats including priming coat with synthetic enamel paint in all shades on plastered concrete surface to give an even side.with special quality paint as per MORTH specification clause No. 803 and 409 complete in all respects sqm 325.6 54.46428571428571
22 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. sqm 308 541.9642857142857
23 PVC pipe for structures: Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. 110mm o/d PVC pipe of 4 Kgf. / sqcm Rmt 1470 176.633928571429
24 Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.
Epoxy bonding adhesive having coverage 2.20 sqm sqm/kg of approved make sqm 2320 317.85714285714283
Total Estimated Cost
Bidder to quote single rate as tender premium % above or discount below the total estimated cost mentioned above. In Words In Figures
I/We hereby agree to execute the above work on the tender premium or discount quoted here on the total estimated cost mentioned above. I/we understand that filling of both cells meant for premium or discount at a time will render my/our bid as non responsive. Premium
Bid price in Rs.
Note: 1. For bituminous items, if bitumen requirement as per job mix formula is more than the minimum requirement as per clause, no extra payment shall be made. Extra bitumen requirement shall be considered incidental to work. 2. The material required for construction work shall be as per MoRT&H specifications for road and bridge works (Fifth Revision/latest edition) and fulfills NHAI Policy guidelines no. NHAI/TIC/PQ/2012-13/205 dated 19.10.2022 and approved by the Engineer incharge. 3. All duties, taxes (excluding GST), royalties and other levies payable by the Contractor under the Contract, or for any other cause, shall be included in the rates, prices, and total Bid price submitted by the Bidder. Nothing extra shall be payable on this account except GST which shall be payable at the applicable rates.
CSR Item No. Description of Item Unit Qty./Premium Rate
24.7 a Construction of granular sub-base by providing close graded material grading -I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications CUM 1194
CARRIAGE FROM PATHANKOT FROM PATHANKOT TO site TOTAL LEAD 80 KM [ Chapter 5.2(i)] CUM 425.58000000000004
Plant to Site 6 km CUM 200.67
Rate Of GSB per Cum 0.0
Total Rate Of GSB per CUM 1820.25
CSR Item No. Description of Item Unit Qty./Premium Rate
24.13 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, carriage from mix plant to site of work, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications CUM 1579.11
CARRIAGE FROM PATHANKOT FROM PATHANKOT TO site TOTAL LEAD 80 KM [ Chapter 5.2(i)] CUM 425.58000000000004
Plant to Site 6 km CUM 200.67
Basic Rate for WMM per Cum 2205.36
TOTAL RATE of WMM per Cum 2205.36
CSR Item No. Description of Item Unit Qty./Premium Rate
24.19 Dense Graded Bituminous Macadam 80mm to 100mm thickness (Grading I)
(a) Providing and laying dense graded bituminous macadam 80mm to 100mm thick with batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4%, Dense Graded Bituminous Macadam 80mm to 100mm thickness (Grading I) bituminous binder VG-40 @ 4%, carriage of mixed material to site of work, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications CUM 6164.68 6164.68
CARRIAGE FROM PATHANKOT FROM PATHANKOT TO site TOTAL LEAD 80KM [ Chapter 5.2(i)] CUM 425.58000000000004
CARRIAGE FROM Bathinda REFINARY TO plant TOTAL Round Trip 550 KM[ Chapter 5.2(iii)] ton 92.62
Carriage for DBM from DBM plant to site 6 km Cum 200.67
Difference of price of VG 40 and VG 30 (Rs 1500 per MT) as CSR rate is inclusive of VG 30 ton 138
Total Rate for Dense Graded Bituminous Macadam 0.0
Total Rate for Dense Graded Bituminous Macadam 7021.55
CSR Item No. Description of Item Unit Qty./Premium Rate
24.15 Prime Coat @ 0.85kg per sqm
Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications Sq. m 32.11 32.11
Basic Rate for Prime coat per Sqm 0.9
Total Rate for Prime coat per Sqm 32.11
CSR Item No. Description of Item Unit Qty./Premium Rate
24.23 Bituminous concrete 30mm to 45 mm (Grading II)
(a) Providing and laying bituminous concrete 30mm to 45 mm thick with Continuous type hot mix plant using crushed aggregates of specified grading ,premixed with bituminous binder CRMB 60 / PMB @ 5.4%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled ,vibratory and tandemr ollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications CUM 7409.77 7409.77
CARRIAGE FROM PATHANKOT FROM PATHANKOT TO site TOTAL LEAD 80KM [ Chapter 5.2(i)] CUM 425.58000000000004
CARRIAGE FROM Bathinda REFINARY TO plant TOTAL Round Trip 550 KM[ Chapter 5.2(iii)] ton 92.62
Carriage for BC from BC plant to site 6 km Cum 200.67
Difference of price of CRM 60 and VG 30 (Rs 3000 per MT) as CSR rate is inclusive of VG 30 ton 372.6
Total Rate for Dense Graded Bituminous Macadam 0.9
Total Rate for Dense Graded Bituminous Macadam 8501.24
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ.xls
Tender Documents • 0.10 MB
NIT.pdf
Tender Documents • 0.17 MB
RFP.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .