Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 May 2024, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 05 cusec HZ Split casing pump having head 13 Mtr, 300mm dia M.S foot valve and other allied works at lift irrigation scheme Darpora of MISD Baramulla.
2024_IFC_248644_5
eNIT 06 of 2024-25 MISD Baramulla
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
7 documents required · 7 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
25 May 2024
16 May 2024
23 May 2024
16 May 2024
22 May 2024
16 May 2024
Amount
Dismantling of 05 cusec Hz split casing pump & 300 mm dia M.S foot valve with the help of skilled labours, other tools & tackles.
Mechanical transportation, loading, unloading and handling of 05 cusec HZ split casing suction pump unit no.01, 300 mm dia M.S foot valve of lift irrigation scheme Darpora using appropriate means of transport like Mahindra Bolero, Tata mobile up to lead of 9km/trip :
Manufacturing, providing and fitting of SS sleeve two no as per sample having weight 2kg weight each sleeve.
Providing of palmative packing as per sample for pumping unit.
Providing of grease for site to use it for pumping units.
Providing M.S nuts & bolts for suction/ delivery pipe, foot valve.
Repairs to 300 mm dia M.S foot valve by way of replacement of weight plate approx. five kg with new one , welding to damaged area by way of welding /patching, repairs to hinges, p/f of new washers, nuts& bolts, fabrication of new strainer approx. weight seven kg for the completion of work.
Fabrication of new SS spindle with proper threading & wedge nut by way of machining process with the help of skilled labour having weight three kg. The job also includes the charge of palmetto packing, R.I cloth etc for the completion of work.
Fitting of M.S foot valve with suction pipe, assembling of HZ split casing pump after proper cleaning of all the parts, alignment with motor, connecting motor leads tested on full load.
Meer Engineers
M/s Sultan Engineering Works Baramulla
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .