Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-AOC | 1 | Accepted-AOC Agreement15/EE/2021-22 | |
| 2 | 2₹6.8 L+₹10,407.90 (1.56%)Rejected-Finance | 2 | Rejected-Finance Financial bid open |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
5 Feb 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD-3AMROHA
02/EE/2020-21 LOT 08 Construction of V.R.B at km 2.180 of Jogipura Minor of M.G.C.Stage-II
2021_UPIDC_549560_8
02/EE/2020-21
Open Tender
Civil Works
Item Wise
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹15,000
27 Sept 2021
30 Jan 2021
5 Feb 2021
30 Jan 2021
5 Feb 2021
30 Jan 2021
90 days
Amount
Earth work in cutting inordanary soil including lead up to 30 m ramming and dressing the surface up to required level ,slope and all labour T&P etc complete
Shuttering for P.C.C. Including all cost of material, labour and T&P etc complete
Providing and laying P.C.C 1:3:6 in foundation including all cost of material labour T&P etc complete
M-100 brick work in 1:4 cement coarse sand mortar including all cost of material labour and T&P etc comlete.
Shuttering for R.C.C. Including all cost of material, labour and T&P etc complete
R.C.C (M-20) in 1:1.5:3 including all cost of material labour and T&P etc complete
Supplying and placing steel reinforcement for RCC work in including all cost of material, labour, cutting, bending, binding and T&P etc complete
P.C.C.1:6:12 in back filling of abutment including all cost of material, labour and T&P etc complete.
Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete
S/F Drainage Spout P.V.C 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F25mm thick expansion joint including cost of material, labour and T&P etc complete.
S/laying tarfelt in 2-layers for bearing slab including all cost of material, labour and T&P etc complete.
S/Laying wheel Guard stone including all cost of material, labour and T&P etc complete.
Dismantling Ist class Brick on edge soiling 110m thick including all cost of material, labour and T&P etc complete.
Earth work in filling for making ramp in all type soil with lead&lift including all cost of labour and T&P etc complete.
Providing a&laying 1st class Brick on edge soling 110mm thick on Diversion & Ramp including all cost of material, labour and T&P etc complete.
Laying Brick on edge soiling with old brick including all cost of labour and T&P etc complete.
Earth work in Removing Diversion with all lead &lift including all cost of labour and T&P etc complete.
C.C (M-20) in 1:1.5:3 wearing coat including all cost of material, labour and T&P etc complete.
DHARMENDRA KUMAR CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .