Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.4 LAccepted-Finance H NO 815 16 1 B WARD NO 06 MAHAKHAJAN DHARGAL PERNEM GOA | PERNEM | NORTH GOA | GOA | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹66.4 L+₹4.0 L (6.41%)Rejected-Finance FLAT NO 1301 2 6 ARJUN DROPATI COMPLEX AUCHIT WADDO TIVIM BARDEZ GOA | L2 | Rejected-Finance Second Lowest bidder | |
| 3 | L3₹70.2 L+₹7.8 L (12.4%)Rejected-Finance | L3 | Rejected-Finance Third Lowest bidder | |
| 4 | L4₹78.3 L+₹15.9 L (25.4%)Rejected-Finance | L4 | Rejected-Finance Fourth Lowest bidder | |
| 5 | L5₹78.5 L+₹16.0 L (25.7%)Rejected-Finance | L5 | Rejected-Finance Fifth Lowest bidder |
Tender Value
₹96.0 L
EMD Value
₹1.9 L
Closing Date
6 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE I WRD Porvorim
EE I WRD Porvorim
Improvement to the existing bund in Sy. No.122/0 at Shirgal in V. P. Dhargal in Pernem Taluka.
2023_WRD_6571_1
No.6-9/WDI/WRD/ASW/2022-23/e -12/Sr1
Open Tender
Miscellaneous Works
Item Rate
90 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.9 L
14 Mar 2023
10 Jan 2023
7 Feb 2023
10 Jan 2023
6 Feb 2023
10 Jan 2023
Amount
Earthwork in excavation in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured / shattered, decomposed rock and such materials either in full or in parts, as the case may be adopting any approved method or as may be convenient or permitted inclusive of chiseling, wedging etc, but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions dressing of sides and bottom, pumping and bailing out water, back filling the excavation earth to the extent required etc. and disposal of excavated stuff with all lead and lift etc. and as directed by Engineer-in-charge etc. all complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) Upto 2.5 meters long pile
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete.
Laterite boulder masonry in cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate of 40 mm nominal size ) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge 110mm dia
Construction of embankement with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with Vibratory roller to meet requirement of Table 300-2 as per MORTH specification 305
Dry stone pitching 22.5 cms thick using laterite stone of approved quality including supplying of stone and preparing surface etc. complete.
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) All works upto plinth level
Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns
Providing Mild steel reinforcement bars (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
Supplying and fixing of Polypropelene glass lined Reinforced Plastic(PPGL FRP) Manus type sluice gate at site made to the specification.The glass shutter shall be made made out of standared quality heavy duty PPGL-FRP material.The frame supporting the shutters shall be made out of heavy duty reinforced FRP materials suitable hinge arrangement shall be provided to facilitate the smooth operation of shutter.The charges are inclusive of all taxes and fixing of gate at site including materials and labour necessary work shall be carried out as per the direction of Engineer in charge etc complete.
M s Noor Engineering
ASHKO BUILDERS
luis construction
Shri C K Abdul Jaleel
I B CONSTRUCTIONS
WALI BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .