| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAdmitted-Fee/PreQual/Technical/Finance KANNETH PUTHENCRUZ 682308 | ERNAKULAM | KERALA | 682308 | ₹5.5 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JOY THOMAS L1 |
|---|---|---|---|---|
| 1.00Construction of 9 m dia Intake well | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 240.25 | sqm | 17 ₹4,084.25 Lowest |
| 1.00 | OD76980/2022-2023:Providing ring bund / shoring of length 40m, width 2m and height 3m using earth filled cement bags, polythene sheets and bamboo including cutting of the Earth, filling, conveying and placing in position and dismantling & removing the same after completion of works properly as per the direction of the department officers including all cost of materials, labor charges etc. complete. | 240 | cum | 3,750 ₹9,00,000 Lowest |
| 1.00 | 100.3.7.1:Earthwork in open well excavation (above water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. | 230.79 | cum | 600 ₹1,38,474 Lowest |
| 1.00 | 100.3.7.12:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.50m to 3.0m including neat banking. | 73.5 | cum | 750 ₹55,125 Lowest |
| 1.00 | 100.3.7.13:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3.0m to 4.5m including neat banking. | 230.79 | cum | 900 ₹2,07,711 Lowest |
| 1.01 | 100.3.8.14:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in ordinary rock and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. | 230.79 | cum | 2,200 ₹5,07,738 Lowest |
| 1.01 | 100.3.8.15:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in ordinary rock and conveying and depositing the spoil within initial lead of 50m and lift from 6.0m to 7.5m including neat banking. | 184.63 | cum | 2,400 ₹4,43,116.8 Lowest |
| 1.01 | OD86705/2023-2024:Granite rock blasting in wells, measured in solids, including collecting and stacking spoil for measurement within the initial lead of 50m and lift up to 7.5m (6m to 7.5m) but excluding bailing out water and including providing protection by earth filled cement bags (300 Nos. of earth filled cement bags / 10 m3 blasting) to avoid damages to the nearby structures) | 46.16 | cum | 8,000 ₹3,69,264 Lowest |
| 1.01 | OD78652/2023-2024:Granite rock blasting in wells, measured in solids, including collecting and stacking spoil for measurement within the initial lead of 50m and lift up to 9.0m (7.5m to 9.0m) but excluding bailing out water and including providing protection by earth filled cement bags (300 Nos. of earth filled cement bags / 10 m3 blasting) to avoid damages to the nearby structures) | 107.7 | cum | 8,000 ₹8,61,616 Lowest |
Tender Value
₹4.4 Cr
EMD Value
₹1 L
Closing Date
3 Jun 2026, 4:00 pmClosed
Superintending Engineer, PH Circle Idukki
Superintending Engineer, KWA, PH Circle Painavu, Idukki
Construction of Well cum Pump house and Transformer control room at Pambar river, Supply and erection of Transformers and Power connection charges, Supplying and Laying RAW pumping main.-General Civil Work- (Pambar River Zone)-General Civil Work
2024_KWA_705412_3
12/2024-25/SE/PHC/IDK/7347
Open Tender
Civil Works - Water Works
Item Rate
Marayoor
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,270
Yes
₹1 L
Yes
11 Jun 2026
15 Nov 2025
5 Jun 2026
15 Nov 2025
3 Jun 2026
15 Nov 2025
15 Nov 2025 - 3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of 9 m dia Intake well | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | OD76980/2022-2023:Providing ring bund / shoring of length 40m, width 2m and height 3m using earth filled cement bags, polythene sheets and bamboo including cutting of the Earth, filling, conveying and placing in position and dismantling & removing the same after completion of works properly as per the direction of the department officers including all cost of materials, labor charges etc. complete. | - | cum | - | - |
| 1.003 | 100.3.7.1:Earthwork in open well excavation (above water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5m including neat banking. | 1 | cum | - | - |
| 1.004 | 100.3.7.12:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.50m to 3.0m including neat banking. | - | cum | - | - |
| 1.005 | 100.3.7.13:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3.0m to 4.5m including neat banking. | 1 | cum | - | - |
| 1.006 | 100.3.8.14:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in ordinary rock and conveying and depositing the spoil within initial lead of 50m and lift from 4.5m to 6.0m including neat banking. | 1 | cum | - | - |
| 1.007 | 100.3.8.15:Earthwork in open well excavation (in or under water) for wells of diameter above 6.0m and up to 9.0m in ordinary rock and conveying and depositing the spoil within initial lead of 50m and lift from 6.0m to 7.5m including neat banking. | 0.8 | cum | - | - |
| 1.008 | OD86705/2023-2024:Granite rock blasting in wells, measured in solids, including collecting and stacking spoil for measurement within the initial lead of 50m and lift up to 7.5m (6m to 7.5m) but excluding bailing out water and including providing protection by earth filled cement bags (300 Nos. of earth filled cement bags / 10 m3 blasting) to avoid damages to the nearby structures) | - | cum | - | - |
| 1.009 | OD78652/2023-2024:Granite rock blasting in wells, measured in solids, including collecting and stacking spoil for measurement within the initial lead of 50m and lift up to 9.0m (7.5m to 9.0m) but excluding bailing out water and including providing protection by earth filled cement bags (300 Nos. of earth filled cement bags / 10 m3 blasting) to avoid damages to the nearby structures) | 0.8 | cum | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.07 MB
12NITVol1.pdf
Tender Documents • 15.45 MB
BOQ_1376175.xls
BOQ • 0.39 MB
datecorrigendum2.pdf
PDF • 0.14 MB
Date_extension.pdf
PDF • 0.10 MB
datecorrigendum24a.pdf
PDF • 0.24 MB
Date_extension.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].