Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance MATHRAKAT HO PERINGALA P O KUMARAPURAM ALUVA 633565 | 633565 | 1 | Accepted-Finance Lowest bid | |
| 2 | 2₹4.0 L+₹49,617.25 (14.2%)Rejected-Finance | 2 | Rejected-Finance Highest bid |
Tender Value
Refer Docs
EMD Value
₹8,943
Closing Date
13 Aug 2026, 11:00 amClosed
Krishnakumar P Nair
Assistant Executive Enfineer, Dredger Sub Division, Kakkanad, Ernakulam- 682030
GENERAL Kanakkankadavu RCB Monsoon Preparedness 2026 General Mechanical Work
2026_Irrig_864364_1
IRR/MH/TR/6926/2025_16_2_2/1
Open Tender
Repair and Maintenance Works
Percentage
180 days
Paravoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹790
Yes
₹8,943
Yes
8 Sept 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
5 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair and Overhauling of hoisting mechanism | |||||
| 1.001 | OD6696/2026-2027:Providing temporary platform for patch work of shutter including cost of materials, fabrication etc. complete | - | set | 5,493.36 | - |
| 1.002 | OD6694/2026-2027:Dismantling the pulley and pin of shutter using puller and proper tools to facilitate smooth operation ,cleaning pin and bushes and facing including cost of all labor, materials, hire charge of tools and plants, conveyance charges etc. complete | - | set | 8,498.7 | - |
| 1.003 | OD6693/2026-2027:Re-assembling the pulley, pin, brackets etc. of the shutter including cost of all labor, machinery, tool & tackles, conveyance etc. complete | - | set | 5,473.13 | - |
| 1.004 | OD6692/2026-2027:Reconditioning of electro magnetic thrust brake of motors, decoupling of brake drum from motor, polishing brake drum, adjusting spring tension and fasteners and replacing the brake liner and replacing th ebrake liner and rewinding/replacing brake coil coupling in correct alignment after necessary repair works | - | set | 8,875.68 | - |
| 1.005 | OD6695/2026-2027:Annual maintenance of hoisting mechanism, top up of Gear oil in reduction Gear boxes, Greasing of all plummer blocks, shafts and all movable parts, applying cardium compound on wire rope after pre-heating alignment & checking of entire mechanisms, replacement of damaged bolt and nuts as per the instructions from the departmental officers at site | - | set | 10,499.16 | - |
| 1.006 | OD6699/2026-2027:Supply of 3hp motor for hoisting mechanism similar to the existing one at site including cost of conveyance and installation cost including installation as directed by the departmental officer at site | - | set | 43,283.27 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1462440.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NITdigisign.pdf
Tender Documents • 0.05 MB
BOQ_1462440.xls
BOQ • 0.31 MB
BD.pdf
Tender Documents • 1.64 MB
Integrity.pdf
Additional Documents • 0.00 MB
PRELIMINARYAGREEMENT.pdf
Additional Documents • 0.15 MB
FORMOFTENDER.pdf
Additional Documents • 0.14 MB
Affidavit.pdf
Additional Documents • 0.01 MB
Requisition.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .