Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LQualified Make: GLOBUS
Model: Globus VC LMS-05 A 65 SECTOR 4 NOIDA DISTRICT GAUTAM BUDH NAGAR GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Make: GLOBUS
Model: Globus VC LMS-05 | ₹5.8 L | L1 | Qualified |
| 2 | L2₹6 L+₹15,000 (2.56%)Qualified Make: Hugo Techno
Model: hugoTECHNO Virtual Classroom LMS-V 00 SWARSWATI SADAN K M MULLICK ROAD LALPUR RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | Make: Hugo Techno
Model: hugoTECHNO Virtual Classroom LMS-V | ₹6 L+₹15,000 (2.56%) | L2 | Qualified |
| 3 | L3₹6.2 L+₹37,000 (6.32%)Qualified Make: GLOBUS
Model: Globus VC LMS-05 RICHA INFO SYSTEMS PRIVATE LIMITED SECTOR 11 SHOP NO 101 SHALIN COMPLEX 382011 GANDHINAGAR INDIA GANDHINAGAR GUJARAT 382010 | GANDHINAGAR | GUJARAT | 382011 | Make: GLOBUS
Model: Globus VC LMS-05 | ₹6.2 L+₹37,000 (6.32%) | L3 | Qualified |
| 4 | Disqualified Make: GMEET
Model: GMEET Video Conferencing Solutions 1005 A WING KAILASH BUSINESS PARK PARKSITE HIRANANDANI LINK ROAD VIKHROLI WEST MUMBAI MAHARASHTRA 400079 | MUMBAI SUBURBAN | MAHARASHTRA | 400079 | Make: GMEET
Model: GMEET Video Conferencing Solutions | - | - | Disqualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
23 Jul 2018, 9:00 pmClosed
mcu for full high definition video conferencing system Average Turn Over of Last 3 Years 20 Lakh (s) Experience with Gov. Required 2 Year (s) Mcu For Full High Definition Video Conferencing System ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Type of Video Conferencing System All in one MCU based - Type of MCU capable of delivering the video bridging performance as defined in the specifications Server (Software) based MCU Server (Software) based MCU Number of ports on IP in all in one MCU (N) 20 20 Resolution Full HD (1080p
30 fps) - Minimum Bandwidth Required for Specified video quality at MCU End (Mbps) 1 - Minimum Bandwidth Requied for Specified video quality at End point/far-site end (Mbps) 1 - MCU should support IP connectivity for video Yes - 1/8 All components of the MCU solution
management sw & desktop client sw
end point
recording & streaming unit should be from the same OEM
Servers can be from third party Yes - MCU is a low power consumption appliance server and have a power on/off switch so that when the MCU is not used it can be switched off Yes - MCU should support audio ports on IP YES - MCU is IP based and Availability of Network management systems Internal - Max Number of registered End Point Users/Desktop Clients/Mobile Clients on an external/internal (Internet/Intranet) server 20 MCU must support Audio algorithms : (G/711
G/722
G/729 or equivalent or better wideband audio coding support) Yes - MCU must support Telnet/USB/RJ45/ssh Yes - MCU support video resolutions 1080p
30fps - MCU supporting Frame rates upto 30fps or more Yes - MCU must support control of a conference like adding participants
removing participants
muting participants video and or audio
lock a conference YES - MCU support Far End Camera Control
in No - 2/8 voice activated and continuous presence modes MCU support sending/receiving multiple streams of video and presentation content without losing MCU port capacity No - MCU must support layout choices of different layouts Yes - MCU configurable to adapt the continuous presence screen layouts to accommodate newly added or dropped participants from the conference
up to 16 participants automatically No - MCU must provide a complete `conference control' interface browser to support all `in call' management functions with add and drop' manipulation of parties in the call Yes - MCU must provide standards based method of compensating and correcting for packet loss media streams loss Yes - MCU must support a configurable text overlay function
where in the Name
Site Identifier or terminal info is displayable Yes - MCU solution support maximum bandwidth control per endpoint or per groups of endpoints No - MCU solution support distributed architecture No - MCU solution must support real time monitoring YES - Scheduling support No - 3/8 through outlook integration The solution should allow registration of users
endpoints
their authentication and providing each a unique ID and presence status for simplified dialing Yes - MCU solution support Microsoft Outlook/Google etc scheduling with email notifications to individual participants Yes - MCU solution must support personal address book Yes - The conference scheduling application must support Dial-in or Dial-out to terminals Yes - The conference MCU solution must support Direct Inward Dial to scheduled meetings Yes - The network management software of the MCU/bridge must provide CDR data and view of current calls It allows to view all components of the solution and allow them to be maintained and upgrade centrally Yes - MCU management software is capable to send e-mail notification to all participants using Microsoft outlook Google etc plug in Yes - Both the MCU management software should be installed on server/appliances No - MCU support Desktop Client Resolution from day one 1080p @ 30fps - Video and Content simultaneously both Yes - 4/8 feature to be available in desktop MCU support for multiple conferences meetings with total number of participants con- currently 20 - MCU is with redundant power supply in same chassis/Server No Yes
No The desktop Client must be downloadable from central server or available on CD/USB Yes - The desktop client is capable to display the presentation/data sharing
shared by remote sites Yes - The desktop client is capable to share presentations
desktop display or documents/application sharing to the participants Yes - It must support AES 128 bit encryption and support NAT/firewall traversal to connect sites on internet Yes - The desktop client is capable to run on latest Windows/Mac/Linux platforms along with mobile devices of IOS and Android Yes - Mangement system (Gatekeeper and Scheduler) - Concurrent ports and registration No Yes
No Media Relay Unit/Fire wall and Nat traversal unit Yes - All equipment are in compliance with the requirements of ITU-T Standard related to Video Conferencing Yes - 5/8 System to be IPv6 ready from day one Yes - System uses standards based protocols and the offered system is interoperable with any existing H-323 AVC based video Conferencing MCU on all ports All Hardware and Software required to make it interoperable on port basis is included in the scope of supply Yes - System is also tropicalized and report available from ILAC/NABL/Govt Lab with all add on if being supplied to buyer as per following requirement : (a) Dry Heat Test : For 16 hr at a temp of 55 degree C in accordance with IS:9 000/part-3/section-5/19 77 (Reaffirmed 2007) (b) Cold Test : For 4 hr At a temp of 0 degree C in accordance with IS :9000/part-2/section-4 1977 (Reaffirmed 2007) (c) Damp Heat Test : For 2 Cycles of 24 h each at a temp of 40 degree C & 95% RH in accordance with IS:9000/part- 5/section-1/1991 (Reaffirmed 2007) After each environmental test and a recovery period of two hours
the video conferencing system has been checked for complete functional parameters
and the results found satisfactory (To be Furnished when demanded by buyer ) No - BIS Registration under CRS of Meity NA - If Yes
Unique - - 6/8 Registration Number issued by BIS and its Validity UL/CE certification No - If Yes
UL/CE certificate Number (To be Furnished when demanded by buyer) - - Operating temperature Range (Degree C) 0-55 - Operating humidity (%Rh) 95 - Free installation and commissioning Yes - On Site OEM Warranty (Year) 1 1
3
5 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Mahaveer Singh Yadav 301001
RR College Alwar 1 15
356213
GEM/2018/B/50463
mcu for full high definition video conferencing system
15 days
Rajasthan; Alwar
PRODUCT
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| mcu for full high definition video conferencing system Average Turn Over of Last 3 Years 20 Lakh (s) Experience with Gov. Required 2 Year (s) Mcu For Full High Definition Video Conferencing System ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Type of Video Conferencing System All in one MCU based - Type of MCU capable of delivering the video bridging performance as defined in the specifications Server (Software) based MCU Server (Software) based MCU Number of ports on IP in all in one MCU (N) 20 20 Resolution Full HD (1080p | - | - | - |
| 30 fps) - Minimum Bandwidth Required for Specified video quality at MCU End (Mbps) 1 - Minimum Bandwidth Requied for Specified video quality at End point/far-site end (Mbps) 1 - MCU should support IP connectivity for video Yes - 1/8 All components of the MCU solution | - | - | - |
| management sw & desktop client sw | - | - | - |
| end point | - | - | - |
| recording & streaming unit should be from the same OEM | - | - | - |
| Servers can be from third party Yes - MCU is a low power consumption appliance server and have a power on/off switch so that when the MCU is not used it can be switched off Yes - MCU should support audio ports on IP YES - MCU is IP based and Availability of Network management systems Internal - Max Number of registered End Point Users/Desktop Clients/Mobile Clients on an external/internal (Internet/Intranet) server 20 MCU must support Audio algorithms : (G/711 | - | - | - |
| G/722 | - | - | - |
| G/729 or equivalent or better wideband audio coding support) Yes - MCU must support Telnet/USB/RJ45/ssh Yes - MCU support video resolutions 1080p | - | - | - |
| 30fps - MCU supporting Frame rates upto 30fps or more Yes - MCU must support control of a conference like adding participants | - | - | - |
| removing participants | - | - | - |
| muting participants video and or audio | - | - | - |
| lock a conference YES - MCU support Far End Camera Control | - | - | - |
| in No - 2/8 voice activated and continuous presence modes MCU support sending/receiving multiple streams of video and presentation content without losing MCU port capacity No - MCU must support layout choices of different layouts Yes - MCU configurable to adapt the continuous presence screen layouts to accommodate newly added or dropped participants from the conference | - | - | - |
| up to 16 participants automatically No - MCU must provide a complete `conference control' interface browser to support all `in call' management functions with add and drop' manipulation of parties in the call Yes - MCU must provide standards based method of compensating and correcting for packet loss media streams loss Yes - MCU must support a configurable text overlay function | - | - | - |
| where in the Name | - | - | - |
| Site Identifier or terminal info is displayable Yes - MCU solution support maximum bandwidth control per endpoint or per groups of endpoints No - MCU solution support distributed architecture No - MCU solution must support real time monitoring YES - Scheduling support No - 3/8 through outlook integration The solution should allow registration of users | - | - | - |
| endpoints | - | - | - |
| their authentication and providing each a unique ID and presence status for simplified dialing Yes - MCU solution support Microsoft Outlook/Google etc scheduling with email notifications to individual participants Yes - MCU solution must support personal address book Yes - The conference scheduling application must support Dial-in or Dial-out to terminals Yes - The conference MCU solution must support Direct Inward Dial to scheduled meetings Yes - The network management software of the MCU/bridge must provide CDR data and view of current calls It allows to view all components of the solution and allow them to be maintained and upgrade centrally Yes - MCU management software is capable to send e-mail notification to all participants using Microsoft outlook Google etc plug in Yes - Both the MCU management software should be installed on server/appliances No - MCU support Desktop Client Resolution from day one 1080p @ 30fps - Video and Content simultaneously both Yes - 4/8 feature to be available in desktop MCU support for multiple conferences meetings with total number of participants con- currently 20 - MCU is with redundant power supply in same chassis/Server No Yes | - | - | - |
| No The desktop Client must be downloadable from central server or available on CD/USB Yes - The desktop client is capable to display the presentation/data sharing | - | - | - |
| shared by remote sites Yes - The desktop client is capable to share presentations | - | - | - |
| desktop display or documents/application sharing to the participants Yes - It must support AES 128 bit encryption and support NAT/firewall traversal to connect sites on internet Yes - The desktop client is capable to run on latest Windows/Mac/Linux platforms along with mobile devices of IOS and Android Yes - Mangement system (Gatekeeper and Scheduler) - Concurrent ports and registration No Yes | - | - | - |
| No Media Relay Unit/Fire wall and Nat traversal unit Yes - All equipment are in compliance with the requirements of ITU-T Standard related to Video Conferencing Yes - 5/8 System to be IPv6 ready from day one Yes - System uses standards based protocols and the offered system is interoperable with any existing H-323 AVC based video Conferencing MCU on all ports All Hardware and Software required to make it interoperable on port basis is included in the scope of supply Yes - System is also tropicalized and report available from ILAC/NABL/Govt Lab with all add on if being supplied to buyer as per following requirement : (a) Dry Heat Test : For 16 hr at a temp of 55 degree C in accordance with IS:9 000/part-3/section-5/19 77 (Reaffirmed 2007) (b) Cold Test : For 4 hr At a temp of 0 degree C in accordance with IS :9000/part-2/section-4 1977 (Reaffirmed 2007) (c) Damp Heat Test : For 2 Cycles of 24 h each at a temp of 40 degree C & 95% RH in accordance with IS:9000/part- 5/section-1/1991 (Reaffirmed 2007) After each environmental test and a recovery period of two hours | - | - | - |
| the video conferencing system has been checked for complete functional parameters | - | - | - |
| and the results found satisfactory (To be Furnished when demanded by buyer ) No - BIS Registration under CRS of Meity NA - If Yes | - | - | - |
| Unique - - 6/8 Registration Number issued by BIS and its Validity UL/CE certification No - If Yes | - | - | - |
| UL/CE certificate Number (To be Furnished when demanded by buyer) - - Operating temperature Range (Degree C) 0-55 - Operating humidity (%Rh) 95 - Free installation and commissioning Yes - On Site OEM Warranty (Year) 1 1 | - | - | - |
| 3 | - | - | - |
| 5 * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Mahaveer Singh Yadav 301001 | - | - | - |
| RR College Alwar 1 15 | - | - | - |
Exempted
23 Jul 2018
19 Jul 2018
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_356213.pdf
GEM_BID
termsCondition.pdf
OTHER
2657c7ca70287299b5181580fdb5a7ab.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .