| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹56.9 L+₹19.6 L (52.7%)Rejected-Finance 164 A 11 GALI NO 3 RISHI NAGAR KAITHAL 136027 | KAITHAL | HARYANA | 136027 | L2 | Rejected-Finance Highest |
Tender Value
Refer Docs
EMD Value
₹61,600
Closing Date
11 Nov 2020, 5:00 pmClosed
Ritesh Nandal
Executive Engineer, Electrical Division, PWD B and R Br., Ambala Cantt.
Const. of new bldg. of 100 bedded Civil Hospital, Shahabad, Distt. Kurukshetra (Pdg. Utility Shifting) (Pdg. 11KV Independent Feeder).
2020_HRY_149126_1
PWD/Elect-KNL/Elect-AMB/110073
Open Tender
Construction Works
Works
120 days
Ambala Cantt
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹61,600
9 Jul 2021
28 Oct 2020
12 Nov 2020
28 Oct 2020
11 Nov 2020
28 Oct 2020
Amount
1: - Supply of PCC Pole 11 Mtr. complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-1
2: - Supply of 11KV Pin Insulator with Pin complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-2
3: - Supply of 11KV Disc Insulator with fitting complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-3
4: - Supply of Stay Set complete 8' Long complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-4
5: - Supply of MS Cross Plate complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-5
6: - Supply of Stay Wire 7/8 SWG complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-6
7: - Supply of 11KV LA Set complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-7
8: - Supply of ACSR 3 SWG ( Supprotive Wire ) complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-8
9: - Supply of GSL No. 8 SWG complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-9
10: - Supply of MS Nuts & Bolts Off Size complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-10
11: - Supply of MS Channel 75 x 40 mm complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-11
12: - Supply of MS Angle Iron 50x50x6 mm complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-12
13: - Supply of MS Flat 50x50x6 mm complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-13
14: - Supply of Earthing Rod complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-14
15: - Supply of 11KV GO Switch complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-15
16: - Supply of Suspension Clamps complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-16
17: - Supply of Dead End Clamps complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-17
18: - Supply of PVC Tape Roll complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-18
19: - Supply of M-Seal complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-19
20: - Supply of 11KV HT XLPE U/G Cable 3 Core 95mm2 complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-20
21: - Supply of 11KV HT XLPE Cable Joint Kit for 3 Core 95mm2 complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-21
22: - Supply of 11KV Cubical Meter Panel with Meter HT, CT & PT 40/5Amp. complete in all respect upto the entire satisfaction of Engineer - in - Charge. NS-22
23: - Labour Charges for Erectioning & Dismantling Erection of PCC Pole 11Mtr. Long NS-23
24: - Erection of Earthing Set complete NS-24
25: - Erection of LA Set complete NS-25
26: - Erection of Sagging of GSL complete NS-26
27: - Erection of HT T- Off complete NS-27
28: - Erection of G. O Switch complete NS-28
29: - Loading & Unloading of PCC Pole NS-29
30: - Fabrication Charges NS-30
31: - Erection of H -Pole complete NS-31
32: - Erection of HT XLPE Cable 3 Core 95mm2 complete NS-32
33: - Erection of Stay Set complete NS-33
34: - Erection of ACSR Conductor complete NS-34
35: - Dismantling of ACSR Conductor 6 SWG complete NS-35
36: - Erection of Cable Joint Kit complete NS-36
37: - Erection of 11KV Feeder Meter complete NS-37
Note:- 1. In case material is not provided by the UHBVN authority the contractor will arrange the material as per UHBVN specification, approved make of UHBVN authority, get it dully inspected by UHBVN authority. 2. The final inspection will be done by the Chief Electrical Inspector at his own level by contractor.
M R CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .