| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹44.2 LAWARDED | ₹44.2 L | AWARDED |
Tender Value
₹42.3 L
EMD Value
₹84,600
Closing Date
24 Dec 2025, 10:30 pmClosed
Visvesvaraya Jala Nigam Limited
Estimate for jungle clearance silt removal and repair works of ranikere feeder channel for financial year-2025-26
248931
VJNL/2025-26/CN/WORK_INDENT448
Open
Canals including Lining and Structures
VJNL Division UBP NO 6 Office Challakere
₹1,060
₹84,600
16 Dec 2025
16 Dec 2025
20 Dec 2025
Estimate for Jungle clearance, silt removal and Repair works of ranikere Feeder channel for Financial year-2025-26.
Cutting and burning or disposing off Apu Jondu from marshy areas as directed with all other ancillary operations complete
Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete
De silting of Feeder Channel Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle excluding cost of transportation including cost of all machinery,...
Providing and laying insitu vibrated M15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cle...
Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cl...
Providing and constructing coursed rubble ( size stone ) face stone masonry in CM 1 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour, ramps,cl...
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all othe...
Grouting with neat cement grout mix of suitable consistency under specified grout pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, red...
Download all tender documents and submit your bid