Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹35.1 Laccepted-aoc | accepted-aoc |
Tender Value
₹39.4 L
EMD Value
₹40,000
Closing Date
4 Aug 2026, 4:30 pmClosed
SE (AM), Govt Of AP
Andhra Pradesh
Maintenance and Repairs to existing Old Godowns No.1 to 4 and 8 in Market Yard, Nandikotkur of A.M.C, Nandikotkur in Nandyal District
965600
SE(AM)AP/GNT/Ep/04/10/2026-27, Dt.16-7-2026
OPEN - NCB
Civil Works
KURNOOL, ANDHRA PRADESH
10 documents required · 10 mandatory
₹1,397
₹40,000
3 Sept 2026
21 Jul 2026
21 Jul 2026
Removing of G.C.I. SHEETS including labour charges etc., complete for finished item of work.
Filling of foundations with conveyed Stone dust free from admixture of foreign material in layers of 15cms. Thick, watering, tamping, including cost and conveyance of all materials to site from approved source, labour charges of all items of work and all incidental and operational charges etc., complete as per standard specification referred and direction of the departmental officers.
VCC M20 using 20 mm HBG / HBT machine crushed metal and screened sand including cost and conveyance of all materials to site from approved source, centering machine mixing, laying concrete in position vibrating curing for required period labour charges for all items of work but excluding cost of steel and its fabrication charges and including all other Incidental & operational charges etc., complete as per standard specifications
Roofing With 0.5mm thick galvanized /pre painted G.I profiled sheets with crimp of 200mm length fixed to the purlins With 14 size self drilling with neoprene washer Side laps are stiched with self tapping drilling screws .End laps are to be sealed with 25x3 mm Butyl tape .the sheets are provided with anti capillary groove.including cost and labour charges etc., complete as per standard specification for finished item of work.
Plastering 20mm thick in single coat in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site and all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work.
White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials .
Painting two coats with synthetic enamel paint first grade to Old iron work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., complete for finished item of work.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Maintenance.xlsx
TENDER_DOCUMENT • 0.46 MB
Tender Document.doc
TENDER_DOCUMENT • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .