Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹17.4 L+₹1.8 L (11.5%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹18.5 L+₹2.9 L (18.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹19.9 L+₹4.3 L (27.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹21.2 L+₹5.5 L (35.4%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
12 Feb 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please Refer BOQ
2026_RDPR_301952_2
e-NIT No. 270 REW Rajouri of 2025 Dated 30-01-2026
Open Tender
Civil Works
Percentage
30 days
RAJOURI
Please Refer Tender Documents
2 documents required · 2 mandatory
₹500
Executive Engineer REW Rajouri
₹50,000
19 Feb 2026
31 Jan 2026
13 Feb 2026
31 Jan 2026
12 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in bulk excavation by mechanical means not exceeding 30cm in depth ,1.5m in width 10 Sqm on plan, including disposal of excavated earth upto 1 Mtr in A.K.S. 80% and O/Rock 20% | 6,587.6 | cum | 228.4 | ₹15,04,607.84 |
| 2 | Providing and laying 1:5:10 mix incl curing but excl cost of centering and shuttering using 40mm nominal size aggregates | 3.3 | cum | 4,826.5 | ₹15,927.45 |
| 3 | Providing and laying 1:3:6 mix incl curing but excl cost of centering and shuttering using stones (a) Bed ,1st &2nd step abutment | 18.15 | cum | 5,673.3 | ₹1,02,970.39 |
| 4 | (b) Abutment , appraoches ,parapet wall | 53.1 | cum | 7,570.6 | ₹4,01,998.86 |
| 5 | Providing and laying 1:1.5:3 mix cement concrete flooring 50mm thick | 14.8 | cum | 9,395.7 | ₹1,39,056.36 |
| 6 | Steel Reinforcement Work include straightening cutting Bending all complete Thermo-Mechanically Treated Bars | 17.8 | Qtl | 9,285 | ₹1,65,273 |
| 7 | Hand Packing Stones on Horizontal Level | 41.85 | cum | 700 | ₹29,295 |
| 8 | Centering and Shuttering including strutting,propping etc and removal of form work (1) Abutment , W/wall,D/wall | 108.23 | sqm | 286 | ₹30,953.78 |
| 9 | Centering and Shuttering including strutting,propping etc and removal of form work (2) Slab | 9.39 | sqm | 718 | ₹6,742.02 |
| 10 | Centering and Shuttering including strutting,propping etc and removal of form work (3) Edges of Slab | 7.76 | sqm | 1,145.1 | ₹8,885.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_979645.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .