| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | ₹22.2 L | L1 | Accepted-AOC Ist Lowest |
| 2 | L2₹22.4 LRejected-Finance | ₹22.4 L | L2 | Rejected-Finance IInd Lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹22.6 L
EMD Value
₹2.3 L
Closing Date
13 Jan 2026, 12:00 pmClosed
Shri Krishna Kumar
Office of the EE, C.D. PWD, Chandauli
Naugarh Madhupur ke Km 5 se Jhumariya Naudiha Bodalpur Golabad sampark marg ka chainage 6.00 se 7.500 me Vishesh Marammat ka karya
2026_CEUVZ_1103744_11
EE Ref No. 2777/4A Dt. 24.12.2025
Open Tender
Civil Works - Roads
60 days
Chandauli
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹2.3 L
Yes
Chandauli
2 Feb 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
5 Jan 2026
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm Sukrut Stone ballast size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, Type-B screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and appying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate 0.7 kg/Sqm using mechanical means as per Technical specification claue 502 . As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared bituminous / granular surface cleaned with hydrulic broom as per Techinical Specification No. 503 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm and 11.2mm dalla aggregate either using 80/100 penetration grade bitumen VG-10 @1.46kg per sqm. To required line,grade and level to serve as wearing course on a previously prepared base,including mixing by mixol,laying and rolling with a three wheel 80-100 KN static roller capacity.as per technical specification clause 508.(Including cost of bitumen) As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510.As direction by the E/I (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per SOR SI No-280 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in foundation including cost of all material labour T&P etc. required for proper completion of work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
R.C.R with cement and coarse sand mortar in proportion of 1 and 4 respectively in sub structure including cost of all material labour T&P etc. required for proper completion of work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
R.C.C. work in 1:1.5:3 with cement approved coarse sand and 2cm Gauge approved stone ballast including all matireal labour,tools and plants etc. required for proper completion for the work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Wearing coat in 1:1.5:3 on top of slab including all matireal, labour,tools and plants etc. required for proper completion for the work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Mild Steel or iron in plain work such as in reinforced concrete including bending for proper completion of the work and incuding supply of steel its wastage etc. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
P.C.C. work in 1:2:4 with cement approved coarse sand and 2cm Gauge approved stone ballast including all matireal labour,tools and plants etc. required for proper completion for the work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 FM including Supply of all material , labour T&P etc required for proper completion of work.As per SOR SI No-574 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet rqquirement to tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Tendernotice_2.pdf
PDF • 1.90 MB
BOQ_2035658.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid