| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC VILL BARJALA JIRANIA WEST TRIPURA PIN NO 799045 | JIRANIA | WEST TRIPURA | TRIPURA | 799045 | ₹21.1 L | L1 | Accepted-AOC Technically responsive and first lowest bidder and the rate quoted by the tenderer seems to be favorable to the department. |
| 2 | L2₹21.5 LRejected-Finance BAIRAGI TILLA BARJALA AGARTALA TRIPURA W PIN 799002 | WEST TRIPURA | TRIPURA | 799002 | ₹21.5 L | L2 | Rejected-Finance Rate quoted seems to be high. |
Tender Value
₹21.1 L
EMD Value
₹42,225
Closing Date
16 Feb 2026, 3:00 pmClosed
Executive Engineer, PWD(R and B) Jirania Division
O/o The EE, PWD (R and B), Jirania
Mtc of Road From Joynagar IS Road (Biswajit Das House) to Swapan Banik House (Ch 0.0 Km to Ch 0.100 Km, Length 0.10 Km) and Joynagar IS Road (Debu Bhattacharjee House) to Ajoy Banik House..under Jirania Sub-Division, PWD (RandB) during the year 25-26
2026_CEPWD_70184_1
109/R/DNIeT/EE-JRN/PWD(R and B)/2025-26
Open Tender
Civil Works - Roads
45 days
Jirania
As per DNIeT
3 documents required · 3 mandatory
₹1,000
₹42,225
Yes
O/o The EE, PWD (R and B), Jirania
13 Apr 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
10 Feb 2026
Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per MoRD Technical Specification Clause 303.5.2.
Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRD Technical Specification Clause 303.1.
Dismantling of Brick soling Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m as per MoRD Technical Specification Clause 202.
Labour charge for Breaking of jhama bats/ jhama bricks/ 1st class bricks. Breaking of jhama bats/ jhama bricks /1st class bricks (including bigger lumps) into metal/chips /aggregates and stacking serviceable materials and unserviceable materials separately as per direction of the Engineer-in-charge withall lifts and upto a lead of 100 m ii) Required sizes for GSB (53 mm to 0.075 mm) as per MoRD Technical Specification Clause 401.
Charge for construction of Granular Sub-base Charge for Construction of granular sub-base by providing well graded material (53 mm to 0.075 mm Jhama Brick Aggregate , Grading-I), spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401. (excluding the cost of jhama aggregate which are available at site only). For Grading - I Material A) By Mix in Place Method
Granular Sub-base with Well Graded Material (Table 400.1) using Jhama Brick Aggregate (A) By Mix in Place Method Construction of granular sub-base by providing well graded material (Jhama Brick Aggregate, Grading-I, as per Table 400.1, spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method with rotavator at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401. (i) For Grading - I Material (jhama brick aggreate)
(1) WBM Grading - 2 Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 2 as per MoRD Technical Specification Clause 405. (A) By Manual Means
WBM Grading 3 Providing, laying, spreading and compacting 53 mm to 0.075 mm jhama brick aggregates to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MoRD Technical Specification Clause 405. (A)By Manual Means
Prime Coat (ii) Medium porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.20 kg/sqm using mechanical means as per MoRD Technical Specification Clause 502
Tack Coat (iii) Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per MoRD Technical Specification Clause 503.
20 mm thick Open-Graded Premix Carpet using Bituminous (viscocity grade/ modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using viscocity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual Means: (II)Bitumen of VG-30
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510. By Manual Means Case - IV : Type D (premix with fine sand) Bitumen (60/70 Grade) VG-30
Excavation for Structures( A )Without dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.IOrdinary Soil( i )Upto 3 m depth
Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200.( i )Sand filling
Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)I.P.C.C grade M 10 ( Using Jhama Brick Aggregate )(,i )Nominal mix 1:3:6
Brick masonry work in cement mortar in substructure complete excepting pointing & plastering, as per drawing & MoRD technical specification Clauses 602, 603, 604, 1202 and 1204. IIIn 1:4 cement mortar
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure as per MoRD technical specification Clauses 613.4 & 1204.
Neat cement punning.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
DNIeT.pdf
Tender Documents • 2.66 MB
BOQ_71420.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid