| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.4 LAdmitted-Finance | -27.09% | ₹31.4 L | L1 | Admitted-Finance |
| 2 | L2₹36.7 L+₹5.2 L (16.6%)Admitted-Finance | -14.99% | ₹36.7 L+₹5.2 L (16.6%) | L2 | Admitted-Finance |
| 3 | L3₹37.9 L+₹6.5 L (20.5%)Admitted-Finance | -12.12% | ₹37.9 L+₹6.5 L (20.5%) | L3 | Admitted-Finance |
Tender Value
₹43.1 L
EMD Value
₹86,300
Closing Date
3 Aug 2026, 11:00 amClosed
AGM(CE)
FOOD CORPORATION OF INDIA REGIONAL OFFICE AMARAVATHI VIJAYAWADA
Systematic Maintenance of Railway Siding at BSC ZANGALAPALLY for the year 2026 27
2026_FCI_918444_1
ENGG/RO-AP/ NIT/02/2026-27 Dt.21.07.2026 SMRS ZPLY
Open Tender
Civil Works
Works
365 days
FCI BSC Zangalapally
Please Refer Tender Document
2 documents required · 2 mandatory
₹0
₹86,300
24 Aug 2026
22 Jul 2026
4 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Systematic maintenance of Railway track in the private railway siding of FCI for all items as included in the technical specifications para 3.0 to 3.9. (Analyzed item based on railway rates) | 64.68 | ETKM | 32,106.98 | ₹20,76,679.47 |
| 2 | Supply of mono block pre stressed concrete sleepers for 52/90R/60kg B.G.rails as per Indian Railway specifications including supply of one set of fittings, fasteners & fixtures for each sleepers for fixing with the rail section of standard size at site as per latest IR specification and also including loading ,transportation,unloading and stacking complete and as per direction of Engineer in charges. | 600 | Each | 4,791.55 | ₹28,74,930 |
| 3 | Deep screening of the entire existing stone ballast to a depth of 250mm below bottom of PSC sleepers upto the formation level (duly following the procedure as given in para 238(2)€ or IR PWM & Para 6.3 of LMR manual/ under traffic condition& packing the entire muck away to make up/ under cess in embankment including leading the deep screening earth in cutting upto a lead of 100m to make up cess at embankment and reinforcing the screened clean ballast back into track including lifting the track to the proposed L section to get a minimum cushion of 250mm below the bottom PSC sleepers including aligning levelling and grading the track to approved longitudinal and transverse profile attending to one round of packing as directed by Engineeer-in-charge to facilitate allowing train @ 20kmph ordinary track. | 350 | Meter | 1,936.81 | ₹6,77,883.5 |
| 4 | Labour charges for fixing of sleepers in B.G private siding at required spacings as specified including fixing the fasteners, ERC clips, pandrel clips, washers etc., and excavation of the available ballast materials dismantling the existing sleepers, screening the excavated ballast, removal of slacks or any other foreign matters restoring the ballast including the extra quantity required from the slacks available, fixing the new sleepers surrounded by the ballast and packing well the sides, bottom of sleepers and maintaining the required gauge complete as directed by the engineer-in-charge. | 600 | Each | 922.59 | ₹5,53,554 |
| 5 | Supplying and stacking neatly stone ballast of 50mm for track in private siding along the track in private siding of FCI confirming to par 9.0 to 9.8 of technical specifications. | 350 | cum | 1,947.62 | ₹6,81,667 |
| 6 | Dumping/ spreading of stone ballast of size 50mm in the railway siding/ track by manual /mechanical means as per direction of Engineer in charge. | 350 | cum | 443.4 | ₹1,55,190 |
| 7 | Supplying and spreading coarse sand for the dead end for track in private siding along the track in private siding of FCI confirming to par 9.0 to 9.8 of technical specifications. | 50 | cum | 3,030.35 | ₹1,51,517.5 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 5.4 | cum | 6,939.68 | ₹37,474.27 |
| 9 | Repurchase price of dismantled materials (to be paid by (or recovered from the contractor work bill) inclusive of cost born for stacking, loading and unloading etc., by the contractor.
Dismantled steel/iron flats, bolts,nuts etc.,as per direction of Engineer in charge: Dismantled old/broken non usable iron sleepers | 90,000 | kg | -32.18 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
TBSMRSZPLY.pdf
Tender Documents • 1.42 MB
BOQ_965187.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .