| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 2 | L2₹2.6 L+₹7,935.61 (3.16%)Rejected-AOC | L2 | Rejected-AOC REJECTED FINANCIALLY | |
| 3 | L3₹2.7 L+₹22,851.31 (9.10%)Rejected-AOC | L3 | Rejected-AOC REJECTED FINANCIALLY |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
4 Mar 2024, 6:00 pmClosed
SO W
SO W OFFICE RAJRAPPA
Providing, fabrication, erection n alignment of hand railing by welding to Steel ladder railing MS Tube 40mm at Top up silo PS 8 n 9 (WC n WCP) bunker At Rajrappa Washery.
2024_CCL_301724_1
GM(R)/SO(W)/Rjp/23-24/Et/144dt 19.02.24
Open Tender
Miscellaneous Works
Item Rate
15 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
18 Apr 2024
19 Feb 2024
5 Mar 2024
20 Feb 2024
4 Mar 2024
20 Feb 2024
20 Feb 2024 - 23 Feb 2024
Amount
Providing, fabrication, erection & alignment of hand railing by welding to Steel ladder railing MS Tube 40mm at Top up silo PS 8 & 9 (WC & WCP) bunker MS tube 40 mm bore 240 mtr X @ 3.61/Mtr kg
Hand railing post & toe gurd fabrication, erection & alignment with angle 65X65X8 Post-90X7.7 kg/mtr =693.00 kg Bottom Toe gurd 6 mm Plate - 1.1 X 0.15 X 6 X 7.85 X 90 nos = 699.42Kg Total -1392.43kg (All materials supply by the contractor).
Total impact of GST for the purpose of CTC
M/s. I.A. Contractor
M/s. Durga Engg. Works
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_312562.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .