Executive Engineer, N.P. Main Canal Division No. 19, Harij
Strengthening work of Loteshwar Distry, Nayka Distry & its minores and Vaval DO and Memna DO of Rajpura Branch Canal for the Year 2025-26
285633
15 of 2025-26
Open
Civil Works - Canal
Works
Patan
9 documents required · 8 mandatory · 1 optional
₹4,248
Yes
Executive Engineer, N.P.Main Canal Division No. 19, Harij
₹2.2 L
Yes
12 Mar 2026
12 Mar 2026
12 Mar 2026
1 Apr 2026
12 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of work:-Strengthning work of Loteshwar Distry, Nayka Distry& it's minors
and Vaval DO and Memna DO of Rajpura Branch Canal for the Year 2025-26
Description of Item Unit Rate in Rs. Amount in Rs.
Dismantling the C.C. lining including including 20924 Sqmt. 82.00
Item disposing off the dismentalled materials as
No.1 directed etc. complete.
Providing and laying HYSD/TMT Fe-415,500D 23 MT 71366.00
steel bar reinforcement for R.C.C. works and
Item anchor bars with providing binding wires
No :2 including cutting, bending, welding, binding in
position, hooking, placing in position with all
leads & lifts etc. complete.(c) TMT Fe-500D
Providing and laying 7.0 cms thick cast in situ 20922.50 Sqmt. 365.00
cement concrete 1:2:4 grade with the use of
crushed aggregates for canal lining works
including use of all equipments, scaffolding,
centering form work etc, with finishing as
required to the exposed surface, making
asphalt joints as directed and watering and
curing ( without sleepers ) with all lead and
lifts etc. comp.
Proving & fixing MS welded mesh jali of 2.8 mm 5417 Sqmt. 142.00
Item dia 65mm x 65mm including cutting in
No :4 required sizes, fixing in canal prism etc.
complited by Engineer in charge.
Providing and Laying HDPE Liner of 750 5417 Sqmt. 185.00
Item micron in bed and slopes of canal at required
No.5 level below lining as per drawing and as
directed etc. complete.
Providing and laying CC 1:2:4 grade using 719 Cum. 4873.40
cement, sand and crushed metal incuding
Item providing and erecting necessary form work,
No.6 centering,vibrating, smooth finishing,watering
and curing as directed with all leads and lifts
etc complete. (a) Sub structures
Excavation in all sorts of soil (including wet 1771 Cum. 79.00
and slushy condition of soil) with yellow,
sandy, gravelly soil including soft murrum&
H.M. including sorting & stacking and
Item depositing the excavated stuff in uniform layers
No.7 as and where directed upto lead of 30 m and
lift as shown below including clearing the site
etc. compute (including dewatering)
(B) For foundation trenches of C.D. work (a)
Backfilling with selected earth including 687 Cum. 67.00
Item remaining consolidation including watering
No.8 with lead as under and all lifts etc. completed
Providing and laying RCC 1:1.5:3 grade by 1143 Cum. 5101.40
using cement, sand and crushed metal for
different items like copping work, pier cap,
abutment cap, Wearing coat, Skin concrete,
Solid slab upto 60 cm. thick, Barrel of canal
syphons, barrel of R.C.C. through, & beams for
foundation and super structure as per
approved design including providing necessary
centering, shuttering and form work, vibrating,
smooth finishing, watering and curing as
directed with all leads and lifts etc. complete.
Total cost of work only Rs.
I/We am/are willing to carry out the work at… ...................... % above/belows percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: CE(QC)/PB/Mix Design/04/2024 Date:20/01/2024 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Approved Bank list.pdf
Approved Cement.pdf
Approved Steel.pdf
BOQ_lote_Nayka_.pdf
Final SBD Loteshwar Nayka.pdf
ITEM SPECIFICATION Loteshwar Distry.pdf
NIT Lote_Nayka.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .