| Sl No | Description | Qty | Unit | BASKAR S L1 | N PERUMAL L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Bus Shelter at Puthanatham in Puthanatham Panchayat Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification | 13.7 | Cum | 263 ₹3,603.10 | 300 ₹4,110 |
| 2.00 | Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete. | 4.98 | Cum | 2,279 ₹11,349.42 | 2,500 ₹12,450 |
| 3.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 7.49 | Mtr. | 5,761 ₹43,149.89 | 5,800 ₹43,442 |
| 4.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 1.09 | MT | 91,976 ₹1.0 L | 91,976 ₹1.0 L |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 10.43 | Cum | 292 ₹3,045.56 | 300 ₹3,129 |
| 6.00 | RCC 1:1 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 10.28 | Cum | 9,514 ₹97,803.92 | 9,514 ₹97,803.92 |
| 7.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. below Ground Level | 32.69 | Sqm | 547.5 ₹17,897.78 | 600 ₹19,614 |
| 8.00 | Above Ground Level | 45.41 | Sqm | 1,095 ₹49,723.95 | 1,100 ₹49,951 |
| 9.00 | Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing , finishing and cost & Conveyance of all materials etc., complete | 12.7 | No | 6,290 ₹79,883 | 6,290 ₹79,883 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 33.98 | Sqm | 308 ₹10,465.84 | 310 ₹10,533.80 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
24 Feb 2026, 3:00 pmClosed
BDO BP
Panchayat Union Manapparai
Construction of Bus Shelter at Puthanatham in Puthanatham Panchayat Manapparai Block in Tiruchirappalli District under MPLADS 2025-26
2026_RDTN_665172_1
A2/3126/2025 dt 13.02.2026
Open Tender
Civil Works
90 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹7,000
26 Feb 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
Construction of Bus Shelter at Puthanatham in Puthanatham Panchayat Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Supplying and filling in basement with filling River sand in layer of not more than 15 cm thick well rammed etc., complete.
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
RCC 1:1 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. below Ground Level
Above Ground Level
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing , finishing and cost & Conveyance of all materials etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion Paint Two coats Over Priming Coat Outside Colour Washing Two Coats Ext. Emul. Paint including cost and conveyance of all materials to site and all labour charges etc complete
Supply and fixing of RCC Jolly including and all labour charges for etc,. Complete
Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete.
Provision for Rain water harvesting Structure
Provision for name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_798869.xls
BOQ • 0.29 MB
pricebidbus.pdf
Additional Documents • 0.49 MB
Techbidbus.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid