Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.2 L+₹66,300 (43.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.6 L+₹1.1 L (69.3%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹3.6 L+₹2.1 L (136.5%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
17 Feb 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Varghese P O
SM P AND P FACT LTD
Assistance for Instrumentation jobs in SA/PA Plants during ATA-2021, FACT-C
2021_FACT_613486_1
04097/2020-2021/E22896
Limited
Miscellaneous Works
Item Rate
30 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDN102)
3 documents required · 3 mandatory
₹0
₹5,000
Yes
30 Mar 2021
2 Feb 2021
18 Feb 2021
2 Feb 2021
17 Feb 2021
2 Feb 2021
180 days
Assistance for Instrumentation jobs in SA/PA Plants during ATA-2021, FACT-CD.
Dismantling and Re-fixing of Control Valves (Size 25 NB to 80 NB): Dismantling and transporting the control valves from position/site to instrumentation maintenance room / instrumentation lab, after obtaining necessary clearance from Plant.After servicing of valves and getting clearence transport and fix back the valves with proper gaskets and bolting and service without leak.Provide adequate supports for the remaining portion of the line/valve- if required. Control valves sizes from 25 to 80 NB
Dismantling and Re-fixing of Control Valves (Size 100 NB to 250 NB): Dismantling and transporting the control valves from position/site to instrumentation maintenance room / instrumentation lab, after obtaining necessary clearance from Plant.After servicing of valves and getting clearence,transport and fix back the valves with proper gaskets and bolting and service without leak.Provide adequate supports for the remaining portion of the line/valve- if required. Control valves sizes from 80 to 250 NB.
Dismantling and Re-Fixing of Flow Meters: Dismantling and transporting the magnetic flow meters from position/site to Instrumentation maintenance room/Instrumentation lab, after obtaining necessary clearance.Transport the flow meters back after service/repair as per instruction from engineer in-charge.Fix back the flow meters with proper gaskets and bolting and service without leak. Provide adequate supports for the remaining portion of the line/flow meters if required. Flow meters - sizes from 25 to 125 mm.
Dismantling and Re-fixing of Level Switches: Dismantling of level switches after getting clearence and fixing back after inspection and service without leak. Level switches of steam drum and de-aerator in SAP to be dismantled for inspection and refixed, as per instruction from engineer in-charge and service without leak.
Dismantling and Re-Fixing of Level Glass and Isolation Valve: Dismantling of level glass after getting process clearence.Fixing back after inspection level glass of steam drum and dearator in SAP as per instructions from engineer in charge. Remove the isolation valves for the level glass and erect the new valve as per instruction from engineer in-charge. (1 no is 1 level glass and 1 isolation valve together)
Dismantling and Re-fixing of Orifice Plate: Arranging of scaffolding for the work.After getting process clearence, disconnect the flange of FAT outlet air duct to furnace, remove the orifice plate FE-4 from the air duct, clean and fix back after inspection,with proper gaskets and bolting and service without leak as per instruction from engineer-in-charge.
Dismantling and Re-fixing of Thermowell Pockets in Attack Tank Compartments in PAP: Dismantle and remove of thermo well pockets in attack tank compartments after getting process clearence, transport to maintenance area,repair for rectification of leaks,arrangements for pressure testing and fixing back properly as per instruction of engineer in charge.
Dismantling and Re-Fixing of Dust Collector Solenoid Valves in PAP: Dismantle the dust collector solenoid valves from position/site after getting process clearence and to instrumentation maintenance room / instrumentation lab for servicin. After obtaining necessary clearance from plant transport and fix back the serviced solenoid valves as per instruction of engineer in-charge.
BABY B
V M ALIAS
Abdul Rasheed K K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_644899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .