| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC 405 1 RISHI BANKIM DEULPARA RABINDRA PATH NAIHATI DIST 24 PGS NORTH PIN 743 165 | NAIHATI | NORTH 24 PARGANAS | WEST BENGAL | 743165 | ₹2.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 Cr+₹24.9 L (9.82%)Rejected-AOC | ₹2.8 Cr+₹24.9 L (9.82%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.8 Cr+₹30.3 L (11.9%)Rejected-AOC ARGORA GHATAL PASCHIM MEDINIPUR PIN 721212 | GHATAL | PASCHIM MEDINIPUR | WEST BENGAL | 721212 | ₹2.8 Cr+₹30.3 L (11.9%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.9 Cr+₹31.8 L (12.5%)Rejected-AOC VILL NETRA P O ISHWARIPUR SOUTH 24 PARGANAS PIN 745302 | NETRA | SOUTH 24 PARGANAS | WEST BENGAL | 745302 | ₹2.9 Cr+₹31.8 L (12.5%) | L4 | Rejected-AOC L4 |
| 5 | L5₹3.7 Cr+₹1.1 Cr (45.2%)Rejected-AOC VILLAGE 3 GARANBOSE P O NAFARGANJ P S BASANTI DISTRICT SOUTH 24 PARGANAS PIN 743312 WEST BENGAL | BASANTI | SOUTH 24 PARGANAS | WEST BENGAL | 743312 | ₹3.7 Cr+₹1.1 Cr (45.2%) | L5 | Rejected-AOC L5 |
Tender Value
₹3.3 Cr
EMD Value
₹6.7 L
Closing Date
17 Jan 2022, 5:00 pmClosed
Managing Director WBEIDC Ltd
Webel Bhavan Salt Lake SEC V EP GP Block KOL 91
Balance Road Works at EMC Falta
2021_WEBEL_353626_1
Webel/EMC/Falta/07/IDM/21 22/38
Open Tender
IT WORKS ORG
Item Rate
60 days
EMC Falta
Please refer to the tender documents
8 documents required · 8 mandatory
₹2,000
₹6.7 L
Please refer to NIT pg 6 and 7
6 Jun 2022
30 Nov 2021
18 Jan 2022
30 Nov 2021
17 Jan 2022
8 Dec 2021
7 Dec 2021
Amount
Earthwork in filling, in compound, tank, lowland, ditches, etc. with good earth in layers not exceeding 150 mm including breaking clods and consolidating the same by ramming and dressing completely. With carried earth arranged by the contractor within a any lead including cost of earth
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. By Mechanical Means. In area of thorny jungle
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming. wherever necessary. Supply of materials as per approved specification Medium Sand (Grading Zone II as per IS:383-1970) stacked at site.
Plant Mix Method or Manual mix method Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (v) Grading - V :
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant or Machine Mixing, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base/ Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density,including supply of all materials, machinery, fuel andlubricants, including incidental costs for lighting,guarding, barricading, making earthen bundh toprotect the edges including cost of quality controlcomplete as per Clause 406 of Specifications for Road &Bridge Works of MoRT&H (5th Revision).
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
Dense Bituminous Macadam: Providing and laying dense bituminous macadam (Bitumen Packed VG-30 60/70) with Hot Mix Plant or mobile hot mix plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate, filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per specification, including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give an even surface including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Grading 1: (37.5 mm nominal size,100 mm thick.) Using Batch Type HMP of minimum capacity 100-120 TPH.
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). On Bituminous Surface
Bituminous Concrete: Providing and laying bituminous concrete (Bitumen VG-30 packed Bitumen 60/70 )with Hot Mix Plant or mobile hot mix plant using coarse aggregates, fine aggregates, filler materials and bituminous binder of required specification including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled, vibratory and tandem rollers for break down, inter-mediate and finished rolling to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including cost and carriage of bitumen, coarse and fine aggregates and filler materials and hire charges of machinery and equipment for construction and quality control, fuels and lubricants and wages of operational staff complete as per Clause 507 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Grading 2, (40 mm thick.). Using Batch Type HMP of minimum capacity 100-120 TPH.
Cast in Situ or precast Cement Concrete M 20 Kerb and Channel. Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine or manualy , foundation concrete laid manually, all complete as per clause 409 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (The rate is inclusive of cost of all materials, labour, hire and usage charges of machinery and all incidental charges in this connection.) Using Concrete Mixer
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. Two Coats
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete. New work (Two or more coats)
Construction of subgrade, Embankment and earthen shoulders with approved material with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with any lead as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Including cost of Earth)
Compacting Original Ground. Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Clause 305.3.4 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Providing and laying Pitching on slopes laid over prepared filter media including stone boulder (size 225-150mm) apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Filling & jointing (1:1.5:3 concrete) 0.3cum/1cum boulder.
Pumping out water from ponds or tanks
Earthwork in filling, in compound, tank, lowland, ditches, etc. with good earth in layers not exceeding 150 mm including breaking clods and consolidating the same by ramming and dressing completely. With carried earth arranged by the contractor within a radius of 5 Km but not exceeding 10 Km including cost of carried earth
Providing and laying Pitching on slopes laid over prepared filter media including lateratite apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Boulder
Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. By mechanical means using hydraulic excavators within an initial lead of 30 M and an initial lift of 3.0 M
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD. By Manual Means
Maintenance of Non-bituminous Base and Sub-Base/WBM/WMM Road: Patching of potholes by draining water, cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse with new materials as per requirement, filling the pothole area with additional volume of crushed stone materials of Pakur variety etc. and screenings as applicable, and compacting the same with static roller as per Water Bound Macadam Specification, including cost of all materials and machineries.
Dismantling all types of plain cement concrete work, stacking serviceable materials at site & removing rubbish as directed within a lead of 75m. upto 150mm thick. Any floor & Roof
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. In ground floor including roof.
Dismantling carefully the brick work in cement mortar with cement plaster on both faces for forming openings or removing the wall from its position including stacking of serviceable materials at site as per direction and removing debries from work site including mending good to damages to match with adjacent surfaces complete with all labour and materials,scaffoldings at all floors.
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 300 mm dia. R.C.C. pipe
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Constructing masonry Chamber 120x120x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluic valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design With common burnt clay F.P.S.(non modular) bricks of class designation 7.5
Providing and fixing enclosed type electromagnetic water meter (bulk type) conforming to IS : 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. (The tail pieces if required will be paid separately). 80 mm dia nominal bore
Providing and fixing enclosed type electromagnetic water meter (bulk type) conforming to IS : 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. (The tail pieces if required will be paid separately). 25 mm dia nominal bore
Providing and fixing enclosed type electromagnetic water meter (bulk type) conforming to IS : 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. (The tail pieces if required will be paid separately). 50 mm dia nominal bore
Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming of the sides of trenches. levelling. dressing and ramming the bottom. Bailing out water as required complete. Depth of foundation upto not exceeding 1500mm
Earthwork in filling, in compound, tank, lowland, ditches, etc. with good earth in layers not exceeding 150 mm including breaking clods and consolidating the same by ramming and dressing completely. With carried earth arranged by the contractor within a radius of 5KM but not exceeding 10KM including cost of earth
Brick soling with picked jhama bricks including preparetion of bed as necessary with joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling(thickness 75mm.). Foundation, basement all floor, Roof & above
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm thick shuttering without staging as per decision &direction of Engineer-In-charge
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Batch Mixed concrete of M 25 Grade with well Graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu. M of Wet concrete produced in computerised batching plant under controlled condition using approved super plasticizer designing concrete mix following I.S 10262 and I.S. 456 transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required level of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification and direction of the Engineer-in charge including hire charges of computerised batching plant, transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. Consumption of cement will not be less than 300 Kg of cement per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula.
Supplying & laying interlocking designer paver block of any shade and of approved quality as per IS: 1237-1980 laid in pattern as directed in pavement, footpath, driveway, etc including necessary underlay complete in all respect with all labour and material. . 60 mm thick block (M-35 grade) (over 150 mm medium sand bed including cost of sand but excluding cost of earthwork in excavation or dismantling of existing hard surface if necessary)Colour Decorative
Supplying, fitting & fixing 80 mm thick interlocking designer concrete paver block M-40 grade for medium-traffic zone & utility cuts on arterial roads etc. as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular/ granular sub-base course & filling the interstices of blocks with fine sand by brooming & subsequent watering including cost of sand for sand bed but excluding cost of base, sub-base course & subgrade preparation.) complete as per direction of Engineer-in-Charge Colour Decorative
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.(The payment is to be made on the basis of the finished compacted volume.)
Cast in Situ or precast Cement Concrete M 20 Kerb and Channel. Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine or manualy , foundation concrete laid manually, all complete as per clause 409 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (The rate is inclusive of cost of all materials, labour, hire and usage charges of machinery and all incidental charges in this connection.) Using Concrete Mixer
Bailing or pumping out water from foundation trenches. This item should be executed on the specific direction of the Engineer-in-charges when he is satisfied in his absolute discretion, that this has not been necessitated due to any fault on the part of the contractor
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(b) Depth of excavation for additional depth beyond 1500 mm upto 3000 mm but not requiring shoring
Earth work in filling in foundation trenches or plinth with good earth in layers not exciding 150 mm. Including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work) .(a) With earth obtained from excavation of foundation
Earthwork in filling, in compound, tank, lowland, ditches, etc. with good earth in layers not exceeding 150 mm including breaking clods and consolidating the same by ramming and dressing completely. With carried earth arranged by the contractor within a any lead including cost of earth
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. As directed and consolidating same by thorough saturation with water ramming complete, ic the cost of supply of sand.
Brick soling with picked jhama bricks including preparetion of bed as necessary with joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling(thickness 75mm.). Foundation, basement all floor, Roof & above
Supplying & laying 250 micron polythene sheeting below P.C.C & between brick shuttering and concrete.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) `complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge). Depth upto 1.5 m.
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge). depth beyond 1.5 m. and upto 3.00 m
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm thick shuttering without staging as per decision &direction of Engineer-In-charge
Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor) . Steel shuttering or 9 to 12 mm thk. Approved quality ply board shuttering in any concrete work. a) Upto Ground Floor
Reinforcement for reinforced concrete work in all sort of structure including distribution bars stirrups, binders etc. including distribution bars initial straightening & removal of loose rust (if necessary) cutting to requisite length hooking and bending to correct shape placing in proper position and bending with 16 gauge black anneled wire at every inter section complete as per drawing and direction.
Ordinary Cement Concrete M-15 (mix 1:2:4) with graded stone chips (20 mm down) excluding shuttering and reinforcement if any in ground floor as per IS 456 - 2000. Pakur variety
Batch Mixed concrete of M 25 Grade with well Graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu. M of Wet concrete produced in computerised batching plant under controlled condition using approved super plasticizer designing concrete mix following I.S 10262 and I.S. 456 transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required level of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification and direction of the Engineer-in charge including hire charges of computerised batching plant, transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. Consumption of cement will not be less than 300 Kg of cement per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula.
Brick work with 1st class bricks in cement mortar (1:6)
(i) In foundation and plinth
(ii) In superstructure, ground floor
125 mm thick brick work with 1st class bricks in cement mortar (1:4) in ground floor using approved H.B. netting in every third layer complete in all respect
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia UPVC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (ground floor) With 1:6 cement mortar. 20 mm thick plaster
Neat cement punning about 1.5 mm thick in wall, dado, window, sills, floor, drain etc. Note : Cement 0.152 cum per 100 sqm
Protective & decorative Acrylic exterior emulsion paint of approved quality as per manufacture's specification & as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding & all Incidental charges but excluding cost of primer. Super Protective 100% Acrylic Emulsion. two Coats
Applying Exterior grade Acrylic primer of approved quality & brand on plaster or concrete surface old new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping & preparing the surface thoroughly complete as per manufacturer's specification & as per direction of the EIC. One coat
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire Crates.
Providing and laying Pitching on slopes laid over prepared filter media including stone boulder (size 225-150mm) apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Filling & jointing (1:1.5:3 concrete) 0.3cum/1cum boulder.
Providing and laying reinforced cement concrete pipe NP4 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. 1000 mm dia
Earthwork in filling, in compound, tank, lowland, ditches, etc. with good earth in layers not exceeding 150 mm including breaking clods and consolidating the same by ramming and dressing completely. With carried earth arranged by the contractor within a any lead including cost of earth
Brick soling with picked jhama bricks including preparetion of bed as necessary with joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction. Single brick flat soling(thickness 75mm.). Foundation, basement all floor, Roof & above
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm thick shuttering without staging as per decision &direction of Engineer-In-charge
Batch Mixed concrete of M 25 Grade with well Graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu. M of Wet concrete produced in computerised batching plant under controlled condition using approved super plasticizer designing concrete mix following I.S 10262 and I.S. 456 transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required level of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification and direction of the Engineer-in charge including hire charges of computerised batching plant, transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. Consumption of cement will not be less than 300 Kg of cement per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula.
Supplying, fitting & fixing 80 mm thick interlocking designer concrete paver block M-40 grade for medium-traffic zone & utility cuts on arterial roads etc. as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular/ granular sub-base course & filling the interstices of blocks with fine sand by brooming & subsequent watering including cost of sand for sand bed but excluding cost of base, sub-base course & subgrade preparation.) complete as per direction of Engineer-in-Charge Colour Decorative
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.(The payment is to be made on the basis of the finished compacted volume.)
Cast in Situ or precast Cement Concrete M 20 Kerb and Channel. Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine or manualy , foundation concrete laid manually, all complete as per clause 409 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (The rate is inclusive of cost of all materials, labour, hire and usage charges of machinery and all incidental charges in this connection.) Using Concrete Mixer
SIRAJUL SEKH
Khan Enterprise
FATEMA BUILDERS
INDIA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .