| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
14 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Creation and Up gradation of Streets and Lanes in Habitation in Package No TN 07 91 of Karur Block under AGAMT II 2021-2022 10 Percentage Above deviation work of Karur District
2022_RDTN_249180_7
Karur District-Karur Block-AGAMT-II 2021-22
Open Tender
Civil Works
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹16,000
Yes
IInd Floor, DRDA, Collectorate, Karur
16 Sept 2022
30 Aug 2022
14 Sept 2022
30 Aug 2022
14 Sept 2022
30 Aug 2022
2 Sept 2022
90 days
Amount
Name of the Work : Providing cement concrete pvement From karur Nerur Main road Panchmadevi Kudi street thangavel House to South Vinayagar Kovil H/O M.Panchamadevi pancayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Cement concrete 1:2:4 mix ( one cement three sand and six aggregate)using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Name of the Work : Providing cement concrete pvement From karur Panchamadevi P.Kalipalaya Kudistreet House Manoharan house to Kulam H/O M.Panchamadevi pancayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
Cement concrete 1:2:4 mix ( one cement three sand and six aggregate)using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Cement concrete 1:3:6 mix ( one cement three sand and six aggregate)using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
plastering with cm 1:5mix 12mm tk including all labour charges etc
Name of the Work : Construction of Kitchen shed @ sankarampalayam PUE School H/O M.Panchamadevi panchayat
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Refilling the basement with excavated earth other than sand including etc complete
Cement concrete 1:3:6 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
supply and erecting centering of shutterings cost & Conveyance of all materials etc., complete.
supply and Fabrication of rainforcement steel cost & Conveyance of all materials etc., complete.
Rcc 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Providing Granolithic floor finish with CC 1:4 using 10-12mm hbg jelly etc complete
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering with cm 1:3 mix( one cement and three sand ) to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
White wash two Coats using shell lime Including cost and conveyance off all materials and labour charges
Distembering two Coats using Approved distember Including cost and conveyance off all materials and labour charges
Exterior emulsion two Coats using Approved colour pigments Including cost and conveyance off all materials and labour charges
Painting two Coats of new iron works Including cost and conveyance off all materials and labour charges
supply and fixing of cuddapah slab for 50mm tk Including cost and conveyance off all materials and labour charges
Cost and Supply of Steel Door Size of 0.90mX2.10m Including all Charges
Cost and Supply of Steel window Size of 1.20mX1.30m Including all Charges
Cost and Supply of ventilator Size of 0.90mX0.6m Including all Charges
Labour Charges for fixing door and windows including all charges etc
Provision for light and fan point
Provision for plug point
Provision for light fittings
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Bharathi Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .