| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46,660Accepted-AOC | ₹46,660 Quoted ₹47,345 | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | THE DSP CO-OP L/C SOCIETY LTD. L1 |
|---|---|---|---|---|
| 1.00 | Hire Charges of Suction Jetting Machine i/c Pol and operator | 1 | Nos. | 16,476 ₹16,476 |
| 2.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | 1 | CUM | 1,583 ₹1,583 |
| 3.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 1 | CUM | 106 ₹106 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | 1 | CUM | 5,500 ₹5,500 |
| 5.00 | Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. | 1 | KG | 90 ₹90 |
| 6.00 | Loading/Unloading and carriage of material NA Schedule By Mechanical Transport including loading, unloading and stacking upto 10 km | 1 | Cum | 250 ₹250 |
| 7.00 | Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity | 1 | Per day | 7,000 ₹7,000 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for | 1 | SQM | 250 ₹250 |
| 9.00 | Running Charge of Pump (3.5 K.L) | 1 | Hrs. | 90 ₹90 |
| 10.00 | Minimum Labour Rates | 1 | nos. | 16,000 ₹16,000 |
Tender Value
₹94 L
EMD Value
₹1.9 L
Closing Date
24 Dec 2025, 9:00 amClosed
Executive Engineer, Municipal Corporation, Rohtak
Executive Engineer, Municipal Corporation, Rohtak
Rate Contract for Disilting, Repair of Nala in limits of M.C, Rohtak. (Re-call)
2025_HRY_491173_1
MCR/Rate Contract/12/2025
Open Tender
Miscellaneous Services
Rohtak
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹1.9 L
Yes
6 Jan 2026
17 Dec 2025
24 Dec 2025
17 Dec 2025
24 Dec 2025
17 Dec 2025
Amount
Hire Charges of Suction Jetting Machine i/c Pol and operator
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement.
Loading/Unloading and carriage of material NA Schedule By Mechanical Transport including loading, unloading and stacking upto 10 km
Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity
Centering and shuttering including strutting, propping etc. and removal of form for
Running Charge of Pump (3.5 K.L)
Minimum Labour Rates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
DNIT.pdf
Other Document • 21.36 MB
BOQ_569501.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid