Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 Cr+₹46.5 L (17.4%)Rejected-AOC | ₹3.1 Cr+₹46.5 L (17.4%) | L2 | Rejected-AOC As L1 is available with all papers security stamp etc within time |
| 3 | Rejected-Technical NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | - | - | Rejected-Technical As per pdf uploaded |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
22 Apr 2022, 11:00 amClosed
SE Office LMP Flood circle
SE Office LMP Flood circle
Flood Protection work for Cluster of Villages Naujallah Naktah etc and Modification of Spur No 1 and construting pipe culvert at River training work Situated on Right Bank of Sharda River in District Pilibhit
2022_UPIDC_683800_21
02/SE/2021-22 DATE-30.03.2022
Open Tender
Civil Works
Item Rate
90 days
Pilibhit
As per bid document
2 documents required · 2 mandatory
₹2,354
₹6.3 L
18 May 2022
17 Apr 2022
22 Apr 2022
17 Apr 2022
22 Apr 2022
17 Apr 2022
Amount
Supplying, laying and placing of 9mm, 4 strands Polypropylene (PP) Gabion Rope Case size (1.80x1.80x0.50)M with lid and silings ,150x150mm mesh size confirming to I.S. 5175;1992(Realfirmed 1997) At work site filled with local sand /earth in HDPE Geo bags of size (1.09x0.69m), including all cost of material, laboures, T&P with all taxes etc. Required for proper complition of work (But excluding cost of GST.)
Supply, Laying and packing 20-40 kg. boulder in G.I wire crate size (3.00x1.50x1.00)m including all cost of labour material, and T&P etc. per cum. Required for proper Completion of work. (But excluding cost of GST.)
Earth work embankment by power traspotated earth with a lead beyond 200m and upto 1.00km including excevation, laoding unloading manual compaction, dressing and all lift etc for proper completion of work. Including all cost of labour T&P etc for proper completion of work (But excluding cost of GST).
Earth work in Foundation of Culvert in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth in to the trenchs or into the space between the stucture and the sides the foundation trenches are into the plinth with removal and disposal directed by the engineer-in-charge up to a distance of 30m form the foundation trenches including all cost of labour and T&P etc (But excluding cost of GST.)
Laying c.c 1:3:6 with cement, coarse sand and stone ballast 22-53 mm size including all lead, lift,cost of all material, labour and T&P etc. (But excluding cost of GST.)
First class brick work in 1:4 cement and coarse sand mortar including all lead lift, cost of all meterial, labour and T&P etc (But excluding cost of GST.)
Laying PCC 1:2:4 with cement, coarse sand and stone ballast 12-20 mm size including all lead, lift,cost of all material, labour and T&P etc. (But excluding cost of GST.)
Supply of 1200 mm inner dia NP3 Hume pipe cost of pipe (But excluding cost of GST.)
Carriage of 1200 mm inner dia NP3 Hume pipe cost of carriage (But excluding cost of GST.)
Laying and Fixing in position of 1200 mm dia NP3 Hume pipe. Including all lead, lift,cost of labour and T&P etc. (But excluding cost of GST.)
Deep struck cement pointing in 1:2 with cement and coarse sand including all lead, lift,cost of all material, labouber and T&P etc. (But excluding cost of GST.)
Supplying and laying of well graded filter including all lead, lift,cost of all material, labour and T&P etc. for Coarse sand (But excluding cost of GST.)
Supplying and laying of well graded filter including all lead, lift,cost of all material, labour and T&P etc. for Peagravel (4-12 mm Size) (But excluding cost of GST.)
Supplying and laying of well graded filter including all lead, lift,cost of all material, labour and T&P etc. for Stone Ballast (22-53 mm Size) (But excluding cost of GST.)
Supplying and laying of Drainage Pipe 75/100mm dia including all lead, lift,cost of all material, labour and T&P etc. (But excluding cost of GST.)
Laying of CC Block (1:3:6) 600x600x300mm including all lead, lift, cost of all material, labour and T&P etc. (But excluding cost of GST.)
Laying of CC Block (1:3:6) 600x600x600mm including all lead, lift, cost of all material, labour and T&P etc. (But excluding cost of GST.)
Earth work in filling top of bundh including all lead, lift, cost of labour and T&P etc. (But excluding cost of GST.)
Supplying and laying of 20-40kg boulder at D/S of culvert including all lead, lift, cost of all material, labour and T&P etc. (But excluding cost of GST.)
Shri Krishna And Company
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .