Tender Value
₹49.3 L
EMD Value
₹50,000
Closing Date
30 May 2026, 6:00 pmClosed
Executive Engineer, K.R.B.C. Division, Surat
Constructing a Compound Wall at Tadkeshwar Naher Colony, Tadkeshwar.
305433
01 of 2026-27
Open
Civil - All
Works
Surat
7 documents required · 6 mandatory · 1 optional
₹1,500
Executive Engineer, K.R.B.C. Division, Surat
₹50,000
15 May 2026
15 May 2026
15 May 2026
30 May 2026
15 May 2026
Name of Work :-
Constructing a Compound Wall at Tadkeshwar naher Colony, Tadkeshwar.
Qty item No. Description of Item Rate Unit Amount
In figure In words
249.00 1 Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) 1561.19 Rupees One Each
and getting out the soil and disposal of the surplus excavated Thousand Five
soil as directed within a lead of 50 Meter for following diameter Hundred Sixty One
of pipes.(iii) 300 mm and Paisa
26.09 2 Providing and laying cement concrete 1:3:6 (1-Cement : 3- 3095.25 Rupees Three Cu.mt.
coarse sand : 6- hand broken stone aggregates 40 mmnominal Thousand Ninety
size) and curing complete excluding cost of formwork in (A) Five and Paisa
Foundation and Plinth Twenty Five Only
61.01 3 Providing laying controlled cement concrete M-250 work with 7878.00 Rupees Seven Cu.mt.
curing complete including the cost of form work and excluding Thousand Eight
the rate of reinforcement for reinforced concrete work in. Hundred Seventy
Columns Upto plinth level Eight Only
34.36 4 Providing laying controlled cement concrete M-250 work with 7959.81 Rupees Seven Cu.mt.
curing complete including the cost of form work and excluding Thousand Nine
the rate of reinforcement for reinforced concrete work in. hundred Fifty Nine
Columns at all floor level and Paisa Eighty
54.55 5 Providing laying controlled cement concrete M-250 work with 5986.27 Rupees Five Cu.mt.
curing complete including the cost of form work and excluding Thousand Nine
the rate of reinforcement for reinforced concrete work in plan hundred Eighty Six
for complete as directed by engineer in charge. for Ground and Paisa Twenty
Beams and Plinth Beams Seven Only
18.18 6 Providing laying controlled cement concrete M-250 work with 7484.10 Rupees Seven Cu.mt.
curing complete including the cost of form work and excluding Thousand Four
the rate of reinforcement for reinforced concrete work in plan hundred Eighty
for complete as directed by engineer in charge. Lintel & Coping Four and Paisa Ten
at all floor level. Only
17861.00 7 Providing TMT Bar FE 500D reinforcement for R.C.C. work 77.29 Rupees Seventy Kg.
including bending, binding and placing in position complete at Seven and Paisa
all floor level. Twnety Nine only
209.00 8 Brick work using common burnt clay building bricks having 4760.58 Rupees Four Cu.mt.
crushing strength not less than 35 kg./Sq.Cm. in Cement Mortar Thousand Seven
1:5 (1- Cement : 5 -fine sand)(c) Fly ash Bricks hundred Sixty and
Paisa Fifty Eight
2741.00 9 20mm thick sand faced cement plaster on walls above ground 315.69 Rupees Three Sq.mt.
level consisting of 12mm thick backing coat of C.M. 1:3 (1- Hundred Fifteen
cement : 3-sand) and 8mm thick finishing coat of C.M. 1:1 (1- and Paisa Sixty
cement : 1-sand) etc. complete. at All Floor level. Nine Only
4.00 10 Point wiring for Tissino / Modular secondary light point 167.66 Rupees One Pt.
with 2-1.5 sq.mm & earth wire of 1.5 sq.mm (green) both are Hundred Sixty
of ISI marked 1.1 KV grade FRLS PVC insulated multi strand Seven and Paisa
copper wires, in below type of pipe to be erected Sixty Six Only
complete with earth continuity and necessary connection
with primary light with accessories erected on Metal / PVC
/ wooden box covered with 3 mm thick
PC(Polycarbonate) / Acrylic sheet for open / concealed
wiring. with necessary Lamp holder / ceiling rose /
H.D.Connector as directed. Note:- Maximum up to 6 mtrs
length, excess will be considered as Mains for Secondary Point.
(f) with medium class Rigid PVC pipe and accessories erected
concealed in wall/ceiling complete cat III
Rs. Forty Nine Lac Twenty Seven Thousand Six Hundred Fifty Four and paisa four Only.
Deputy Executive Engineer
K.R.B.C. Remo. Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD BOOK Compound Wall.pdf
2. work and site condition.pdf
3. Sch B.pdf
4. Cement Consumption.pdf
5. Steeel consumption.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .