| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.7 CrAccepted-AOC TC21 497 MAKKAL LANE KANATTUKARA POST THRISSUR THRISSUR KERALA 680011 UDYAM TN 28 0005551 33AADCT0557D1ZR R M MII STATUS AS VERIFIED | THRISSUR | KERALA | 680011 | ₹24.7 Cr | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹39.6 CrRejected-Finance | ₹39.6 Cr | 2 | Rejected-Finance L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Decision of PQ committee held on 03.11.20 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Decision of PQ committee held on 03.11.20 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Decision of PQ committee held on 03.11.20 |
Tender Value
₹22.1 Cr
EMD Value
₹5 L
Closing Date
21 Aug 2020, 5:00 pmClosed
Chief Engineer (Civil Construction) South
O/o the CE(CC)South Vydyuthi Bhavanam KSEB Ltd Pattom Thiruvananthapuram
Hot dip Galvanisation of 11745MT electric Line Materials such as Cross arms Clapms Stay rods etc and Lattice tower parts fabricated at the Mechanical Facilities of KSEB Ltd for the year 2020-21
2020_KSEB_373156_1
CECCS/03/2020-21 dated 21/07/2020
Open Tender
Miscellaneous Works
365 days
Pallom, Angamaly, Kolathara
Please refer Tender documents
6 documents required · 6 mandatory
₹17,700
online
₹5 L
Yes
15 Apr 2021
23 Jul 2020
26 Aug 2020
23 Jul 2020
21 Aug 2020
23 Jul 2020
23 Jul 2020 - 5 Aug 2020
Part - I At Central Mechanical Facility, Pallom
Galvanising electrical line materials such as cross arms, clamps, lattice tower parts etc. fabricated in Central Mechanical Facility, Pallom by hot dip galvanizing method as per IS 4759/1979, IS 2633/86, IS 2629/85 and its latest amendments, if any, including cost of materials used for galvanising, including all incidental charges required for proper completion of the work such as labour charges for loading and unloading at Central Mechanical Facility, Pallom and at contractor's plant, Transporting charges (to and fro) from Central Mechanical Facility, Pallom to Plant and return after process to Central Mechanical Facility, Pallom, stacking for counting etc complete.
Galvanizing stay rods fabricated in Central Mechanical Facility, Pallom by hot dip galvanizing method as per IS 4759/1979, IS 2633/86, IS 2629/85 and its latest amendments, if any, including cost of materials used for galvanising, including all incidental charges required for proper completion of the work such as labour charges for loading and unloading at Central Mechanical Facility, Pallom and at contractor's plant, Transporting charges (to and fro) from Central Mechanical Facility, Pallom to Plant and return after process to Central Mechanical Facility, Pallom, stacking for counting etc complete.
Part II - At Mechanical Facility I, Angamaly
Galvanising electrical line materials such as cross arms, clamps, lattice tower parts etc. fabricated in Mechanical Facility I, Angamaly by hot dip galvanizing method as per IS 4759/1979, IS 2633/86, IS 2629/85 and its latest amendments, if any, including cost of materials used for galvanising, including all incidental charges required for proper completion of the work such as labour charges for loading and unloading at Mechanical Facility I, Angamaly and at contractor's plant, Transporting charges (to and fro) from Mechanical Facility I, Angamaly to Plant and return after process to Mechanical Facility I, Angamaly, stacking for counting etc complete.
Part III - At Mechanical Facility II, Kolathara
Galvanising electrical line materials such as cross arms, clamps, lattice tower parts etc. fabricated in Mechanical Facility II, Kolathara by hot dip galvanizing method as per IS 4759/1979, IS 2633/86, IS 2629/85 and its latest amendments, if any, including cost of materials used for galvanising, including all incidental charges required for proper completion of the work such as labour charges for loading and unloading at Mechanical Facility II, Kolathara and at contractor's plant, Transporting charges (to and fro) from Mechanical Facility II, Kolathara to Plant and return after process to Mechanical Facility II, Kolathara, stacking for counting etc complete.
Galvanizing stay rods fabricated in Mechanical Facility II, Kolathara by hot dip galvanizing method as per IS 4759/1979, IS 2633/86, IS 2629/85 and its latest amendments, if any, including cost of materials used for galvanising, including all incidental charges required for proper completion of the work such as labour charges for loading and unloading at Mechanical Facility II, Kolathara and at contractor's plant, Transporting charges (to and fro) from Mechanical Facility II, Kolathara to Plant and return after process to Mechanical Facility II, Kolathara, stacking for counting etc complete.
Sanvijay Infrastructures Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid