Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | ₹1.7 Cr | L1 | Accepted-Finance low |
| 2 | L2₹1.8 CrAccepted-Finance | ₹1.8 Cr | L2 | Accepted-Finance High |
| Sl No | Description | Qty | Unit | APEX CONSTRUCTIONS L1 | SATPAL CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 2,249.99 | Cum | 81.12 ₹1.8 L | 100 ₹2.2 L |
| 2.00 | Earthwork Undressed with combined Lead upto 4.0 KM including Breaking of clods. | 1 | Cum | 100 ₹100 | 120 ₹120 |
| 3.00 | Dressing of New Earthwork | 280 | Sqm | 1.3 ₹364 | 2 ₹560 |
| 4.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | 142.49 ₹142.49 | 152 ₹152 |
| 5.00 | Re-handling of earthwork recently executed | 2,249.99 | Cum | 64.9 ₹1.5 L | 75 ₹1.7 L |
| 6.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 9.08 | Km | 848.07 ₹7,700.48 | 950 ₹8,626 |
| 7.00 | Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 | 5,983.39 | Sqm | 11.35 ₹67,911.48 | 12.36 ₹73,954.70 |
| 8.00 | Dismentling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled material upto lead of 1000m stacking serviceable and unserviceable material separately as per technical clause 202 of MORTH specifications | 111.48 | Cum | 307.62 ₹34,293.48 | 325.2 ₹36,253.30 |
| 9.00 | Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls | 1,782.77 | Cum | 7,800 ₹1.4 Cr | 8,000 ₹1.4 Cr |
| 10.00 | 10mm thick Cement Plaster 1:4 ( for side walls ) | 5,700.31 | Sqm | 172.76 ₹9.8 L | 185 ₹10.5 L |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
17 Apr 2026, 2:30 pmClosed
Executive Engineer
Executive Engineer,Ropar canal and GWD
Estimate for brickwork lining of watercourse of outlet at RD 10500/TF of rattowal minor
2026_WR_162683_2
87/22A/2025-26
Open Tender
Civil Works
90 days
village raikot Distt. Ludhiana
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3.0 L
office of Executive Engineer,Ropar canal and GWD
4 May 2026
6 Apr 2026
17 Apr 2026
6 Apr 2026
17 Apr 2026
6 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | - | Cum | - | - |
Earthwork Undressed with combined Lead upto 4.0 KM including Breaking of clods. | - | Cum | - | - | |
Dressing of New Earthwork | - | Sqm | - | - | |
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | - | Cum | - | - | |
Re-handling of earthwork recently executed | - | Cum | - | - | |
Dag belling single kassi stroke minimum 7.5 cm depth. | - | Km | - | - | |
Dressing of Bed and preparation of sub grade for lining. CSR item no 19.1 | - | Sqm | - | - | |
Dismentling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled material upto lead of 1000m stacking serviceable and unserviceable material separately as per technical clause 202 of MORTH specifications | - | Cum | - | - | |
Laying Ist class burnt brick Masonry laid in 1:6 with CSM for Bed & Side Walls | - | Cum | - | - | |
10mm thick Cement Plaster 1:4 ( for side walls ) | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_335373.xls
BOQ • 0.23 MB
10500retender.pdf
Tender Documents • 0.15 MB
ccess.pdf
Tender Documents • 0.14 MB
Download all tender documents and submit your bid