Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | -35.01% | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹65,957.47 (15.5%)Admitted-Finance | -24.96% | ₹4.9 L+₹65,957.47 (15.5%) | L2 | Admitted-Finance |
| 3 | L3₹5.6 L+₹1.3 L (30.8%)Admitted-Finance | -14.97% | ₹5.6 L+₹1.3 L (30.8%) | L3 | Admitted-Finance |
Tender Value
₹6.6 L
EMD Value
₹13,120
Closing Date
31 Aug 2026, 6:00 pmClosed
XEN
XEN PHED Division Sangod
O and M RWSS Kanwas
2026_PHCJA_593582_1
16/ 2026-27
Open Tender
Civil Works - Water Works
Percentage
330 days
Sangod
O and M RWSS Kanwas
5 documents required · 5 mandatory
₹500
XEN PHED Div.
₹13,120
Yes
1 Sept 2026
29 Aug 2026
1 Sept 2026
29 Aug 2026
31 Aug 2026
29 Aug 2026
29 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. (For Rural Scheme where three phase electric supply is up to 8 hrs) (Rates are exclusive of GST) | |||||
| 1.1 | 8.0 HP to 10.0 HP | 2 | Each | 3,461.86 | ₹6,923.72 |
| 1.2 | 11.0 HP to 12.5 HP | 2 | Each | 3,811.86 | ₹7,623.72 |
| 1.3 | 13.0 HP to 15.0 HP | 4 | Each | 3,988.14 | ₹15,952.56 |
| 1.4 | 16.0 HP to 25.0 HP | 4 | Each | 4,473.73 | ₹17,894.92 |
| 2Maintenance of centrifugal pump sets and motor/ Monoblock including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month. maintenance of histroy sheet as directed by Engineer-in-charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP) (Rates are exclusive of GST) | |||||
| 2.1 | 13 HP to 20.0 HP | 2 | Each | 2,802.54 | ₹5,605.08 |
| 3 | G. Total (01 month) | 1 | P.Month | 54,000 | ₹54,000 |
| 4 | Grand Total 11 Month Item No. 1 to 3.2 | 11 | Month | 54,000 | ₹5,94,000 |
| 5Cleaning of Clear water reservoirs ( CWR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir. (Rates are exclusive of GST) | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 2.15 MB
TDKanwas.pdf
Tender Documents • 2.13 MB
BOQ_1053523.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .