| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-AOC | ₹4.0 L | L-1 | Accepted-AOC Rate is lowest |
| 2 | L-2₹4.3 L+₹25,450 (6.37%)Rejected-Finance | ₹4.3 L+₹25,450 (6.37%) | L-2 | Rejected-Finance Rate is comparatively high |
| 3 | L-3₹4.3 L+₹25,633 (6.41%)Rejected-Finance 1ST FLOOR SHOP NO 11 MORI GATE RAJINDER MARKET NEW DELHI DELHI 110006 INDIA | NORTH | DELHI | 110006 | ₹4.3 L+₹25,633 (6.41%) | L-3 | Rejected-Finance Rate is comparatively high |
| 4 | L-4₹4.9 L+₹92,300 (23.1%)Rejected-Finance | ₹4.9 L+₹92,300 (23.1%) | L-4 | Rejected-Finance Rate is comparatively high |
Tender Value
₹4.9 L
EMD Value
₹9,702
Closing Date
1 Sept 2023, 4:00 pmClosed
DY INSPECTOR GENERAL(ADM), ITBP ACADEMY
ITBP ACADEMY, MUSSOORIE
ARM OF 11 KVA SUB STATION AT ADM WING ITBP ACADEMY FOR THE YEAR 2023-24
2023_ITBP_768241_1
ITBP/ACADEMY/ENGR/11KVA SUB-STATION AW-8470
Open Tender
Electrical Works
Item Rate
180 days
ADM WING, ITBP ACADEMY, MUSSOORIE
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,702
Yes
18 Dec 2023
23 Aug 2023
2 Sept 2023
24 Aug 2023
1 Sept 2023
24 Aug 2023
Amount
ELECTRICAL WORKS
Overhauling and maintenance of OCB (Disconnect the trolly from panel and dismantling of mechanism and other necessary part, cleaning of it by kerosene, carbonate and reassemble of all gear set for the smooth operation and reassemble of trolly and insert in panel connected all wiring parts as per requirement and check the operation shell be smooth and proper)
Providing and replacement of panel spout complete GEC make OCB
Overhauling and maintenance of ACB (Disconnect the trolly from panel and dismantling of mechanism and other necessary part, cleaning of it by kerosene, carbonate and reassemble of all gear set for the smooth operation and reassemble of trolly and insert in panel connected all wiring parts as per requirement and check the operation shell be smooth and proper)
Re-insulation of 11KVA old and used CTs by using insulation paint, HT tape etc.
Opening cleaning of 11KV bus bar spout CTs by CTC thinner and insulation by using paint non moisturized complete 11KV bus bar spout 3 Nos panel complete
Providing replacement of 11KV CT 50/25/5 Amp double ratio protection & metering GEC make
Complete testing of transformer including minor repair like repairing of transformer leakage of oil including replacement of oil seal, gasket, HT/LT busing, nut, bolts packing of top cover sheet, inspection sheet and conservator tank complete
Supply and replacement of Silica Gel breather
Repairing of LT panel including bus bar
Providing and replacement of 200 Amp HPL make MCCB 4 pole 36 KA in incoming side.
Providing and replacement of 100 Amp HPL make MCCB 4 pole 25/16 KA in outgoing side.
Cutting of old cable 3.5x240 sqmm proper crimping of lugs, filling of cable boot and complete connection in LT main panel
Cutting of old cable 3.5x300 sqmm proper crimping of lugs, filling of cable boot and complete connection in LT main panel
RAM CHANDER GUPTA
R.V. ELECTRICAL ENTERPRISES PVT. LTD.
DS Constructions Deepanshu Agarwal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .