| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC Lower side | |
| 2 | L2₹13.2 L+₹46,267 (3.62%)Rejected-Finance | L2 | Rejected-Finance Higher Side |
Tender Value
₹7.2 L
EMD Value
₹15,000
Closing Date
9 Jan 2020, 10:30 amClosed
Xen HPPWD Division Baijnath
Xen HPPWD Division Baijnath
C/O 6. Mtr span RCC slab culvert at RD 8/150. (SW C/O Chobin Side approaches at Km 8/115 to 8/144.50
2019_PWD_33634_1
PWD-BD-NIT-2019-20-17963-999
Open Tender
Civil Works
Item Rate
90 days
Baijnath
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
EE HPPWD Baijnath
₹15,000
29 Oct 2020
26 Dec 2019
9 Jan 2020
26 Dec 2019
9 Jan 2020
26 Dec 2019
Amount
Earth work in excavation for structures in all kind of soil as per drawing and M.O.R.D.technical specification section 300 and 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
Providing and laying mechanically mixed and vibrated plain cement concrete in foundation and plinth, as per drawing and Morth technical specification section 800, 900 &1200 for nominal mix 1:5:10 (one cement : five sand : ten graded stone agg. 40mm (forty millimeter) nominal size) and curing complete as per direction of Engineer-in-Charge and as per the drawing and hauling carriage of labour, equipments and materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect. The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
Back filling behind abutments, wing walls and return walls complete as per drawing and M.O.R.D. technical specification clause 1203and 1604 and as per the directions of Engineer-in-Charge including carriage of material within all leads,lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
Construction of embankment with approved material deposited at site from road way cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of table 300.1 and 300.2 as per technical specification clause 301.5 with in all leads, lifts and other incidental.The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
Providing weep holes in brick masonry/stone masonry/plain or reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimetre) dia P.V.C. pipe extending through the full width of the structures with slope of 1(V): 20 (H) towards drainage face complete as per drawing and M.O.R.D.technical specification clauses 709 & 1206.6and as per the directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals and to the entire satisfaction of the Engineer-in-Charge .The rate is including octroi, royality, GST, toll tax, Sale Tax or other taxes imposed by the government.
Parveen
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .