Loading…
Loading…
Tender Value
₹16.2 L
EMD Value
₹16,204
Closing Date
28 Sept 2026, 4:00 pmDue tomorrow
SE JAMNAGAR
Construction of capacitor bank foundation, Demolition of old quarter and old capacitor bank and Misc. civil work at 66KV KALAWAD A S/S under Tr Division Jamnagar under Tr Circle Jamnagar
342775
TCJ/26-27/65
Open
Civil Works
Works
Jamnagar
14 documents required · 13 mandatory · 1 optional
₹1,062
GETCO-JAMNAGAR
₹16,204
7 Sept 2026
7 Sept 2026
7 Sept 2026
28 Sept 2026
7 Sept 2026
TENDER NO.: TCJ/26-27/65
Name of work :- “Construction of capacitor bank foundation,Demolition of old quarter & old
capacitor bank and Misc. civil work at 66KV KALAWAD A S/S under Tr Division Jamnagar
under Tr Circle Jamnagar.”
SN Description Unit Rate Amount
Removing & Scraping of old deteriorated plaster of any
thickness from wall / R.C.C. member including
stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift.
Demolition of brick work and stone masonry including
2 stacking of serviceable materials and disposal of CMT 440.00 570.59
unserviceable materials with all lead and lift.
Demolition of Unreinforced cement concrete including
3 stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift
Demolition of R.C.C. work including stacking of
4 serviceable materials and disposal of unserviceable CMT 75.00 1097.15
materials with all lead and lift.
Dismentalling tiles or stone floors laid in mortar
including stacking of serviceable materials and
5 disposal of underserviceable materials with all lead
and lift.[RB/218/Ch 20/IN 20005/20.23]
Dismentalling doors, windows, ventilators, etc. (Wood
or steel shutters including chowkhars, Architraves,
6 Holdfasts and other attachment etc. complete and NO 222.00 194.71
stacking them within all lead and lift. Not exceeding
Dismentling CI pipes GSW pipes abd AC rain water
7 pipes with fittings and clamps including stacking the RMT 470.00 77.72
materials with all lead and lift ( for any dia, of pipe)
Dismantling sanitary fittings like wash basin . WC pan
8 Indian and European type, flushing tank etc. including NO 20.00 419.90
stacking the materials with all lead and lift
Eartwork in cuting in all sorts of soil including
conveying and spreading the stuff, embankment as
and where directed and disposing off unwanted stuff
with all lead and lift.
Excavation for foundation up to 1.5 Depth including
sorting out and stacking of useful materials & Refilling
the sides of the trenches and disposing of the
excavated stuff up to any lead - Any type of soil/Soft
rock/hard rock.
Backfilling Consolidation shall be done by spring
vibratory earth compaction machine of 5 ton
Excavation for foundation above 1.5m Depth
including sorting out and stacking of useful materials
& Refilling the sides of the trenches and disposing of
11 the excavated stuff up to any lead -Any type of CMT. 2.00 306.00
soil/Soft rock/hard rock.Backfilling Consolidation
shall be done by spring vibratory earth
compaction machine of 5 ton capacity.
Providing White stone Bella masonry (incl.quion
blocks, jamb blocks, closer etc;) approved size in
foundation and up to plinth in C.M. (1:6) including
racking out joints up to 12mm depth, scaffolding,
curing, filling up the gaps between the joints complete
as directed by E.G.. Up to PLINTH.
1. Compressive strength should not less than 7N/mm2
2. Water absorption should not exceed 5%
3. Stone bella filled with soil requires to be cleaned as
first dry clean then pressure washing and scrubbing
so that no soil particle remains present.
4. Wetting of stone bella requires for 03 to 24 hours
5. Curing of mortar joints shall commennced from
hours of laying and shall be done till 7 days.
Providing and laying cement concrete 1:4:8 (1
Cement : 4 Course sand : 8 black crushed stone
aggregate 40mm nominal size ) and curing complete
including cost of form work in Foundation and plinth.
Providing & laying control cement concrete M-15 as
per mix design exposed work with curing etc.
complete excluding the cost of ply wood form
work & adjustable tubular steel supports / Props.&
excluding the cost of reinforcement.G.F+FF &
Staircasse -For Columns
Providing & laying control cement concrete M-20 as
per mix design exposed work with curing etc.
complete excluding the cost of ply wood form work & CMT. 20.00 4068.20
adjustable tubular steel supports / Props. but
excluding the cost of reinforcement.G.F+FF &
Staircasse - For Footing.
1. Date of casting shall be mentioned and curing with
Jute bag shall be done for 10 days.
2. The plywood is so fixed on to the timber or steel
framework that it gives a flush surface on the inside.
3. Ensure all joints are sealed tight with tap or PU
4. Ensure concrete or PVC cover blocks are placed on
all sides and bottom.
Providing & laying control cement concrete M-20 as per
mix design exposed work with curing etc. complete
including the cost of ply wood form work & adjustable
tubular steel supports / Props. but excluding the cost of
reinforcement.G.F+FF & Staircasse - For Column
Note: 1. Date of casting shall be mentioned and curing
with Jute bag shall be done for 10 days.
2. The plywood is to be fixed on to the timber or steel
framework that it gives a flush surface on the inside.
3. The four-side frames are assembled into box form by
use of nuts and bolts at appropriate distances, where
holes have been drilled earlier. or Sikanja fixing on
wooden patti at 600mm apart shall be done. additional
props and bracings shall be used as per requirement.
4. Verticality and alignment of column position shall be
5. Ensure all joints are sealed tight with tap or PU foam.
6. Ensure concrete cover blocks are placed on all sides.
Providing & fixing in position as per approved
drawing TMT of grade Fe-500 / 500D /550 grade bars
coated with fusion bonded epoxy coating not less than
175 micron thickness and up to 300 micron to
reinforcement bars as per IS-13620-1993/ASTM-775
M including testing of coating at plant and conforming
to IS-1786 & relevant standards in piles, pile cap,
Footing, bracing/Tie beams, chimney/Column, Slab
etc. as per design & drawing including cutting,
bending, hooking, binding with 16 gauge annealed MT. 2.00 76520.00
wire, welding of bars as per IS requirement if
necessary. No extra payment shall be made for
required welding, Forming the pile cages, lowering in
position and in case of beam, cage shll be lifted to
required height and placed in position by required all
type of machineries etc complete as directed by the
Engineer-in-Charge.
(Note: Payment of Fusion bonded epoxy coating will
be paid saperaltly.)
Providing 20mm thick sand face cement plaster on
18 wall up to height 10 meters above ground level
consisting of 12mm thick backing coat of C.M. 1:3 (1
cement : 3 sand) and 8mm thick finishing coat of C.M.
1:1 (1 cement : 1 sand) etc. complete.
Providing and Applying 1 (One) Coat of SMARTCARE
PRIMERO and 2 (two) coats of APOCOLITE APEX
plastic emulsion paint or its equivalent Wall painting
of approved brand and manufacture And GETCO
Approved Shade on undercoated wall surface to give
an even shade. The work included thoroughly
brushing/cleaning the surface free from mortar
droppings and other foreign matter and also including
preparing the surface even and smooth by sand paper
or any other approved method including finishing & SMT 1380.00 182.00
thinning as per manufacturer’s instruction. A gap of
hrs. Should be given between 2 subsequent coats. The
work should be carried out strictly as per
manufacturer's specification and requirement comp.
as directed by EIC. Minimum 05 year warranty
certificate to be taken from paint brand.
(Note: Before making final payment to agency
warranty certificate from the original manufacture for
specific project on the name of agency must be
Providing & fixing 600mm dia hot dip galvanizing
cross spiral type razor type concertina coil having
80 circles, 200 clips with optimum openable stretch
of 6 m length using a central core wire high carbon
spring steel ( High tensile wire) made up of 2.6 mm.
dia. as per IS : 4454, Part - 1, Grade - II having
minimum galvanizing of 230-250 Gms per mm2.
around which a edge of razor sharp barbs strip of
mm. thick & 19 mm. width confirming to IS : 513 DD
quality having minimum galvanizing coating of
20 microns with series of barbs punched along the length
at regular interval supported / tied with two rows of
barbed runner wires to newly proposed GI angle on
wall up to 3.00 m height with providing and fixing GI
angle 50x50x6 mm having dimension vertical =
mm and horizontal 700 mm PLUS '+' shaped placed
at approx. 3.00 m apart with P & F 04 no. of
horizontal R.B.T. reinforced barbed wire, stud tied
with G.I. staples and G.I.clips to retain horizontal, etc
complete as per manufactures specification and
directed by EIC
Supply, fabrication,cutting,threading of M.S rod
including hot dip galvanizing the same of required size
and length including 2 Nos of hex nuts with check nut,
21 lock nut, plain washer,spring washer, base plate
65X10 thick stopper pit welded at end. etc; complete
as directed by E.I.C
Setting of template & foundation bolts in line and
level before concreting of foundation and making
arrangement of fixing template in such a way as it
22 remains in position during concrete etc. comp. As
directed by EIC. Note:The rate includes supplying and
Providing form work of ply wood shuttering so as to
give a smooth exposed finish including centering
(adjustable tubular steel support). Shuttering strutting
23 and propping etc for any height of propping and MT. 70.00 280.72
centering below supporting floor to ceiling and
removal of the same for reinforced concrete and plain
concrete for Footing, Foundations and pedestal.
RsTotal Rs Total Cost of Civil Works in Rs.
Welfare Cess 1.00%
Scrap recovery of dismentling items of Rs. 265770.84 (inclusive of all taxes) will be
deducted from 1st RA Bill of the work.
IN WORDS RUPEES SIXTEEN LACS TWENTY THOUSAND THREE HUNDRED FIFTY RUPEES AND TWENTY ONE
Welfare Cess will be paid as per rules and reimbursed on production of proof of such payments made by the
contractor to the appropriate department.
NOTE: (1) Please note that change in commercial terms & conditions in (a) clause –A3” Instruction
to Bidders” and (b) Caluse-3 and clause 6 of (section-c) General conditions of contract i.e.
(Compensation for the delay) and (Action on default by contractor) (C) Clause-37 of section-D
general condition of contract i.e. (Rights of Owner), Clause-43 (Relationship with employee) and
clause-44 (Conflict of Interest among Bidder/Agents)
GETCO: Circle Office, Jamnagar.
I/We have read and clearly understood the terms, conditions, Schedule ‘B’ and Technical specifications put by
GETCO on WEB site.
I/We hereby accept all the conditions and specifications of this tender document, and accordingly, I/We
am/are willing to carry out the work at _________________% (in words ______________percentage)
above/below the estimated cost. Accordingly the total amount of my/our tender works out to
above/below the estimated cost. Accordingly the total amount of my/our tender works out to
SIGNATURE OF CONTRACTOR.
(With rubber stamp/seal of the company)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 26-27-65.pdf
Integrity Pact 26-27-65.pdf
Tech. Specifications 26-27-65.pdf
Price Bid 26-27-65.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .