Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹80.6 L
EMD Value
₹1.0 L
Closing Date
25 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Staff Officer(M), Hasdeo Area
Office of the Area General Manager Hasdeo
Installation of 1000mm belt conveyor in proposed LHCM Panel B3,B5 and B4 in seam B Bottom at Kurja UG Mine of Hasdeo Area.
2026_SECL_368435_1
AGM/HSD /SO(M)/e-Tender/26-27/92 Date 07/11//2026
Open Tender
Civil Works - Others
Percentage
365 days
SECL Hasdeo Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.0 L
7 Nov 2026
7 Nov 2026
27 Nov 2026
7 Nov 2026
25 Nov 2026
9 Nov 2026
7 Nov 2026 - 18 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1 | - | - | - | - |
| 2 | Removal of debris against cleaning of sites for installation of drive head and laying of conveyor structrues. | 18.9 | m3 | 709.93 | ₹13,417.68 |
| 3 | Excavation in floor of the gallery for grouting of holding bolts | 141.12 | m3 | 6,296.78 | ₹8,88,601.59 |
| 4 | Laying cement concrete in underground foundation (1:2:4) | 141.12 | m3 | 3,218.36 | ₹4,54,174.96 |
| 5 | Loading of material in tubs at incline mouth (all items of building materials)(Dry material @ 1.50 times of formed work of PCC) | 221.85 | m3 | 271.38 | ₹60,205.65 |
| 6 | Pushing tub to 30m and after every 30m | 221.85 | m3 | 103.95 | ₹23,061.31 |
| 7 | Unloading of all kinds of building materials at destination UG | 221.85 | m3 | 198.66 | ₹44,072.72 |
| 8 | Dismantling and transportation of 1000mm size double drive drum with loop take up to the track | 7 | Work | 86,895.6 | ₹6,08,269.2 |
| 9 | Installation of 1000mm size double drive drum with loop take up | 7 | Work | 1,01,378.2 | ₹7,09,647.4 |
| 10 | Dismantling of 1000mm belt structures and transportation of the same upto end of the trac at a lead of 100m in UG. | 1,730 | m | 579.3 | ₹10,02,189 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_381424.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .