Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC | 1 | Accepted-AOC Agreement06/EE/2021-22 | |
| 2 | 2₹8.0 L+₹2,670.10 (0.33%)Rejected-Finance | 2 | Rejected-Finance Financial bid open | |
| 3 | 3₹8.2 L+₹15,972.91 (2.00%)Rejected-Finance | 3 | Rejected-Finance Financial bid open | |
| 4 | 4₹8.2 L+₹20,734.91 (2.59%)Rejected-Finance | 4 | Rejected-Finance Financial bid open |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
10 Mar 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD-3AMROHA
02/EE/2020-21 Lot 01Construction of V.R.B at KM 1.520 and RACHETA MINOR from km. 1.495 to KM. 1.545 M.G.C.C. STAGE-II
2021_UPIDC_549560_65
02/EE/2020-21
Open Tender
Civil Works
Item Wise
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹17,000
31 Aug 2021
4 Mar 2021
10 Mar 2021
4 Mar 2021
10 Mar 2021
4 Mar 2021
90 days
Amount
Earthwork in excavation in foundation in ordinary soil for structure i/c all lead and reqd. lifts as per site requirement and with proper disposal of excavated earth as per directed by engineer in charge for proper completion of work.
Earth work in filling in ordinary soil including lead up to 600 m , ramming and dressing the surface up to required level and slope of all labour, T&P etc. complete.
Centering and shuttering for form work I/c all cost of labour and T&P etc for complete for proper completion of work.
Centering and shuttering for R.C.Cwork I/c all cost of labour and T&P etc for complete for proper completion of work.
Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including cost of all material, labour T&P etc complete for proper completion of work.
Cement concrete in (1:3:6) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work.
Cement concrete in (1:6:12) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work.
R.C.C M-20 (1:1.5:3) with cement, coarse sand & crushed stone ballast including cost of all material, labour, mechanical vibration & mixing T&P etc. complete.
First class B/W in 1:4 cement coarse sand, mortar i/c cost of all material, labour T&P etc. complete for proper completion of work.
Struck pointing in 1:2 cement mortar including cost of all material, labour, T&P, curing etc. complete for proper completion of work
S/L of three layer tarfelt painting including cost of all material, labour T&P etc complete.
Providing and fixing of 75 mm dia P.V.C. pipe cost of all material , labour T&P etc. complete for proper completion of work.
Making 25 mm thick expension joint including cost of all material , labour T&P etc. complete for proper completion of work.
M-100 brick on edge paving I/c joints filled with sand including cost of all material labour T&P etc complete for proper completion of work.
Earth work in excavation in Removing diversion
Dismentling of Brick on edge on Diversion
NISAR AHMAD
PRAGATI ASSOCIATES
SANDHYA SHARMA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .