| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.2 LAccepted-Finance | ₹24.2 L | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹24.6 LRejected-Finance | ₹24.6 L | L2 | Rejected-Finance High Rate |
| 3 | L3₹24.9 LRejected-Finance | ₹24.9 L | L3 | Rejected-Finance High Rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
4 May 2026, 9:00 amClosed
EO NAGAR PALIKA KESHORAIPATAN
KESORAIPATAN
CONSTRUCTION OF CC ROAD NALA NALI REMP WORK
2026_DLB_554165_1
271-473/2026-27 NP KPATAN
Open Tender
Civil Works
365 days
KESORAIPATAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO
₹50,000
Yes
18 May 2026
24 Apr 2026
5 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | - | cum | - | - | 1 |
| 2 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301In all type of soil | - | cum | - | - | 2 |
| 3 | Earth work in excavation in foundation, trenches etc. including
dressing of sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | cum | - | - | 3 |
| 4 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 1 Km | - | cum | - | - | 4 |
| 5 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | - | cum | - | - | 5 |
| 6 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). | - | Cum | - | - | 6 |
| 7 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size). | - | Cum | - | - | 7 |
| 8 | .Providing and laying lean cement concrete 1:4:8 in Sub- base over a
prepared sub-grade with coarse and fine aggregate conforming to
IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1, aggregate gradation
after blending to be as per table 600-1, cement content not to be
less than 150 kg/ cum, optimum moisture content to be determined
during trial length construction, concrete strength not to be less than
10 Mpa at 7 days, mixed in concrete mixer, laid manually,
compacted with surface vibrator, finishing and curing complete as
per clause 601, 112 of MoRT&H specification including all material,
labour, machinery, lighting, guarding and maintenance of diversion. 9.3 | - | cum | - | - | 8 |
| 9 | .Providing and laying un-reinforced, plain cement concrete mix with
Concrete Mixer & vibrator pavement over a prepared sub base with
43 grade cement , coarse and fine aggregate conforming to IS: 383,
maximum size of coarse aggregate not exceeding 25 mm, mixed as
per approved mix design, laid, spread, compacted and finished in a
continuous operation including provision of contraction, expansion,
construction and longitudinal joints etc including all material, labour,
machinery, lighting, guarding and maintenance of diversion.
PCC M-20 | - | cum | - | - | 9 |
| 10 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size) | - | Cum | - | - | 10 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_987068.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid