Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
30 Nov 2023, 12:00 pmClosed
SE EDC PILIBHIT
Near Roadways Pilibhit
Replacement of damaged Jarjar 11 KV line, construction of new 11 KV line and installation of new 100 KVA transformers at different sites under EDD-Puranpur in additional business Plan 2023-24.
2023_MVVNL_863944_1
T-27/EDCP/2023-24
Open Tender
Miscellaneous Works
Item Rate
90 days
Puranpur
As per tender form
3 documents required · 3 mandatory
₹1,180
SE EDC
₹2,500
3 Apr 2024
21 Nov 2023
30 Nov 2023
21 Nov 2023
30 Nov 2023
21 Nov 2023
Amount
Safe carriage of following material from store centre-Pilibhit for replacing of damaged/Jarjar 11 kv line from Mahua hunde to Gadhwa kheda under 33/11 kv s/s Kurraiyya Puranpur including loading unloading at both end distance up to 0-60 Km.
PCC Pole 8.5 Mtr.
11 kv Pin Insulator Composite
11 kv X-arm V type
Earthing Rod with complete material.
ACSR Weasel Conductor
11 kv disc Insulator Composite
Erection of single PCC Pole 8.5 mtr. long including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Concreting of PCC Pole 8.5 mtr. long at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Opening, descend of damage 11 KV line cable from old pole and carriage of received back damage cable from site to store centre-Pilibhit
Laying and sagging of 3 phase ACSR Weasel conductor from double pole at 33/11 KV substation to double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Safe carriage of following material from store centre-Pilibhit for construction of new 11 kv line and installation of 01 nos. 100 KVA transformer at Ambedkar Mohalla and Balmiki Basti under 33/11 kv s/s Madhotanda Puranpur including loading unloading at both end distance up to 0-60 Km.
PCC Pole 8.5 Mtr.
ACSR Weasel Conductor
11 kv X-arm V type
11 kv Polymeric Pin Insulator Composite
Polymeric Disc Insulator 45 KN
Stay set 16x1800
MS Earthing rod (2540x20mm)
Stay wire (3.15mm), 7/10 SWG
GI Wire 5mm, 6 SWG
Three phase DO Fuse
100 KVA transformer
LT Cable 3.5x150 sqmm
Erection of single PCC Pole 8.5 mtr. long including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Erection of double pole structure as per norms.
Concreting of PCC Pole 8.5 mtr. long at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Laying and sagging of 3 phase ACSR Weasel conductor from double pole at 33/11 KV substation to double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect.
Earthing of each PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. brick, ballast, sand etc would be provided by the contractor.
mounting of 100 KVA transformers on double pole and laying of cable jumpering and making all HT/LT connections complete work in all respect .
Laying of LT Cable 3.5x150 sqmm.
Installation of DO fuse
POWER AND POWER CONSULTANTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .