| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 CrAccepted-AOC | ₹15.2 Cr | L1 | Accepted-AOC Accepted as L1 |
| 2 | L2₹16.5 CrRejected-AOC | ₹16.5 Cr | L2 | Rejected-AOC Rejected as L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical PQ committe not decided to pre-qu |
Tender Value
₹13.9 Cr
EMD Value
₹5 L
Closing Date
3 Nov 2020, 6:00 pmClosed
Superintending Engineer, Irrigation North Circle,
Office of the Superintending Engineer, Irrigation North Circle,Cauvery House,Westhill, Kozhikode 673005
ASE Work Reformation of the Damaged Seawall between Mattool South in Mattool Grama Panchayath and Puthiyangadi in Madayi Grama Panchayath in Kannur District
2020_Irrig_383633_2
SEIK/ET-PQ-02/2020-21/S
Open Tender
Civil Works - Others
540 days
Kannur District
Please refer Tender documents.
9 documents required · 9 mandatory
₹19,750
Yes
online
₹5 L
Yes
Office of the Superintending Engineer, Irrigation
6 Mar 2021
5 Oct 2020
6 Nov 2020
6 Oct 2020
3 Nov 2020
6 Oct 2020
6 Oct 2020 - 13 Oct 2020
12 Oct 2020
Amount
APPENDIX-I: Mattool South ( South of CP Stone 2359)
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
APPENDIX-II: Mattool central (Between CP Stone 2376&2379 )
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
APPENDIX-III: Vavuvalappil Thodu(Between CP Stone 2386 & 2391)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
Appendix IV : Kakkadanchal (Between CP Stone 2390 & 2392)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
APPENDIX-V: Neerozhukkuchal I (Between CP Stone 2391& 2395)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
APPENDIX VI : Neerozhukkumchal II ( Between CP Stone 2396 & 2398)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
APPENDIX VII - Puthiyangadi ( Between CP Stone 2397 & 2399 )
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.30.8 : A.S.E -Reformation works - Kannur - Supplying quarry run varying in size upto 15cm.max for filter and stacking the same for measurement
60.43 : Unified Data A.S.E work- Carriage of departmental quarry run from stack at site to the place of dumping and laying and packing to uniform thickness of 30cm from the filter of the sea wall including all leads and lifts etc. complete as per the directions of departmental officers at site.
60.34.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones20 to40 dm3 in size , including stacking for measurement.
60.36.8 : A.S.E Reformation work- Kannur -Supplying at site of work,granite stones 45 dm3 in size , including stacking for measurement.
60.40.8 : A.S.E -Reformation work- Kannur- Supplying at site of work granite rubble 200 dm3 in size as nearly cubical as possible the minimum dimension in any of the three perpendicular directions passing through the centre of gravity of each individual stone being not less than 45 cm including loading and unloading charges etc. and marking with distinguishing number on three faces with paint etc complete .
60.45 : Unified Data for A.S.E works - Conveyance of departmental granite stones 20 to 40 dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts, etc. complete as per the directions of the departmental Officers at site.
60.46 : Unified Data for A.S.E work - Conveyance of departmental granite stones 45dm3 in size from stack at site and dumping in position to lines and levels to from the core of the sea wall as per approved design including all leads and lifts , etc. complete as per the directions of the departmental Officers at site.
60.41 : Dumping in position(not to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
60.42 : Dumping in position( to be packed)granite rubble 200dm3 in size suitably to form the armour course of sea wall as per approved design(dumping with a lead upto 50m)using rail track or pneumatic type equipment with crane or winches or by any other method each trip to take 3 minutes and carry 3 stones(1.6 ton)
PKV INFRACTECH PVT LTD
Bidder Name
PKV INFRACTECH PVT LTD
FORSHA BUILDERS AND DEVELOPERS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid