| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC HIMACHAL PRADESH HP | L1 | Accepted-AOC Award | |
| 2 | L2₹2.4 L+₹6,574 (2.88%)Rejected-Finance HIMACHAL PRADESH HP | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹2.4 L+₹13,540.10 (5.92%)Rejected-Finance VILL FAGOG P O BALOH TEHSIL JHANDUTTA DISTT BILASPUR HP | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | GULZARI LAL L1 | Raj Kumar Prop R.K. Construction L2 | Kashmir Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. (including pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting and trimming dressing where ever required including restoration of un-metalled surface to its original condition including cost of diversion for traffic night signals fixing caution board, crossing over trenches for access to houses and fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge. | 21.46 | Cum | 400 ₹8,584 Lowest | 425 ₹9,120.5 | 435 ₹9,335.1 |
| 2.00 | Providing and laying cement concrete 1:6:12(1cement:6 sand:12 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts.Under Base Wall. | 1.47 | Cum | 9,900 ₹14,553 Lowest | 10,000 ₹14,700 | 10,200 ₹14,994 |
| 3.00 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:-Vertical surface such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge. | 42 | Sqm | 420 ₹17,640 Lowest | 435 ₹18,270 | 450 ₹18,900 |
| 4.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window ills, fillets, sunken floor etc.. up to floor five level, excluding the cost of centering, shuttering and finishing 1:5:10 (1 cement : 5 coarse : sand) 10 graded stone aggregate 40 mm nominal size) in all leads and lifts. | 17.85 | Cum | 9,950 ₹1,77,607.5 Lowest | 10,200 ₹1,82,070 | 10,500 ₹1,87,425 |
| 5.00 | Stone / Boulder Filling Behind the R/Wall, B/Wall and also under floor etc complete in all respect and entire satisfaction of engineer in charge. | 2.19 | Cum | 3,600 ₹7,884 Lowest | 3,800 ₹8,322 | 3,950 ₹8,650.5 |
| 6.00 | Laying, jointing and testing in trenches of galvanized mild steel tubes (light grade) of following dia meter including providing and fixing such as bends, tees, air valves, unions and collars etc. including carraige of GI Pipes as per direction and to the entire satisfaction of the Engineer-In-Charge .(earth work in trenches to be measured & paid for separately) in all leads and lifts. 25mm Dia | 72 | Rmt. | 33 ₹2,376 Lowest | 38 ₹2,736 | 40 ₹2,880 |
Tender Value
₹2.3 L
EMD Value
₹4,700
Closing Date
6 Oct 2025, 9:00 amClosed
Executive Engineer
EE JSV Mandi
C/O Plum concrete retaing wall to protect the pump house of LWSS Jaral Kotli Badyar at 1st stage Dawada and Laying Jointing and Testing of GI pipe 25mm dia 72 Rmt DC Deposit SDF/2025/154
2025_HPIPH_115954_1
9296-9395
Open Tender
Pipe Laying Works
Item Rate
90 days
Jaral Kotli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹4,700
23 Jan 2026
26 Sept 2025
6 Oct 2025
26 Sept 2025
6 Oct 2025
26 Sept 2025
Amount
Excavation in foundation and trenches etc. (including pipes and pits upto all depths) in all kinds of soil such as pick work, jumper work, blasting and chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming and dressing of sides, levelling of bed to correct grade stacking the excavated soil clear from the edge of excavation and returning the excavated soil after laying, jointing and testing of GI pipes in trenches in 15cm layers including consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as directed in all leads and lifts and soring strutting and trimming dressing where ever required including restoration of un-metalled surface to its original condition including cost of diversion for traffic night signals fixing caution board, crossing over trenches for access to houses and fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge.
Providing and laying cement concrete 1:6:12(1cement:6 sand:12 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts.Under Base Wall.
Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including certring shuttering strutting and propping etc. with wooden battens and ballies height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for in-situ reinforced concrete & plain concrete work in all leads and lifts in:-Vertical surface such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respects with in all leads & lifts as per directions of Engineer-in-Charge.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window ills, fillets, sunken floor etc.. up to floor five level, excluding the cost of centering, shuttering and finishing 1:5:10 (1 cement : 5 coarse : sand) 10 graded stone aggregate 40 mm nominal size) in all leads and lifts.
Stone / Boulder Filling Behind the R/Wall, B/Wall and also under floor etc complete in all respect and entire satisfaction of engineer in charge.
Laying, jointing and testing in trenches of galvanized mild steel tubes (light grade) of following dia meter including providing and fixing such as bends, tees, air valves, unions and collars etc. including carraige of GI Pipes as per direction and to the entire satisfaction of the Engineer-In-Charge .(earth work in trenches to be measured & paid for separately) in all leads and lifts. 25mm Dia
Raj Kumar Prop R.K. Construction (BID ID -565735)
Kashmir Singh (BID ID -565745)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .